0% found this document useful (0 votes)
12 views2 pages

21hi0064 Noa

Hi discription

Uploaded by

kuyangarthur333
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
0% found this document useful (0 votes)
12 views2 pages

21hi0064 Noa

Hi discription

Uploaded by

kuyangarthur333
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
You are on page 1/ 2
Department of Public Works and Highways Contract ID: 21H10064 ~ Contract Name: Construction/Rehabilitation of Multi-Purpose B: Lower Natimao-an, Carmen, Cebu Location of the Contract: Carmen, Cebu Cebu 5% DISTRICT ENGINEERING OFFICE V. Sotto Street, Cebu City NOTICE OF AWARD January 27, 2021 (RALPH CHRISTIAN A. SENINING President ‘STEADFAST BUILDE! CONSTR [ON CORP. North National Road, Pitogo Consolacion, Cebu City Dear Sir: We hereby accept your bid for the abovestated Contract and, therefore, award the Contract to you, as the Bidder with the Lowest Calculated Responsive Bid, at a total Contract price equivalent to One Million Nine Hi P g Only (P 1,920,203,29). You are, therefore, required, within ten (10) calendar days from your receipt of this Notice of ‘Award, to submit to us the following documents as conditions for the signing of the Contract: a. Notice of Award (NOA) with the bidder's signed “conforme” b. Authority of Signing Official/Board Resolution/Secretary’s Certificate ©. Performance Security in any of the forms specified in the Instructions to Bidders (Use Form DPWH-INFR-43 or DPWH-INFR-44, as applicable). Construction Methods (Use Form DPWH-INFR-45) @. Construction Schedule in the form of PERT/CPM Diagram or Precedence Diagram and Bar Chart with S-Curve and Cash Flow (Use Form DPWH-INFR-46). f. Professional Regulatory Commission (PRC) License No. and Tax Identification Number (TIN) of Each Key Personnel 9g. Manpower Schedule (Use Form DPWH-INFR-47), h, Equipment Utilization Schedule (Use Form DPWH-INFR-48). i, Construction Safety and Health Program (Use Form DPWH-INFR-49). J. Contractor's All Risk Insurance (CARI) k. Latest Income Tax and Business Returns duly stamped and received by BIR and duly validated with the tax payments made. Tax Clearance from the BIR to prove full and timely Payment of taxes |. Fora local contractor, Certification under oath stating that the Contractor is free and clean of all tax liabilities a DPWH-INFR-41-2016 Page 1 of 2 Department of Public Works and Highways Contract ID: 21H10064 Contract Name: Construction/Rehabilitation of Multi-Purpose Building, Bray. Lower Natimao-an, Carmen, Cebu Location of the Contract: Carmen, Cebu You are also required, within the said ten (10) calendar days, to formally sign the Contract ‘Agreement, Your failure to comply with these requirements shall constitute a sufficient ground for the cancellation of this award and the forfeiture of your Bid Security. Very truly yours, DPWH-INFR-41-2036 Pago 2 of 2

You might also like