0% found this document useful (0 votes)
39 views

Details 5 of 3 Storeys

The document provides schedules and details for structural elements including: 1) A base plate schedule including dimensions, number of anchor bolts, and notes. 2) A composite slab schedule including dimensions, rebar sizes and spacing, and notes. 3) Details for a half turn stair including dimensions, rebar sizes and spacing.

Uploaded by

Edison Maminta
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
39 views

Details 5 of 3 Storeys

The document provides schedules and details for structural elements including: 1) A base plate schedule including dimensions, number of anchor bolts, and notes. 2) A composite slab schedule including dimensions, rebar sizes and spacing, and notes. 3) Details for a half turn stair including dimensions, rebar sizes and spacing.

Uploaded by

Edison Maminta
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 13

BASE PLATE FOR COLUMNS

MARK: BP-1 min.bolt length

=D*12
122.5 105 122.5 350

70

105 + +
210
105
+ + 307.34

70
+ +
350
254

summary
B.plate A. bolts
C B t D L no of bolts
mm mm mm mm mm pcs
350 350 20 20 500 6

1
COMPOSITE SLABS

PROJECT
LOCATION

SCHEDULE OF COMPOSITE SLABS:


DIMENSIONS(mm) BARS-mm NOTE:
MARK TYPE BAR Ø(mm)
L W T BOTHWAYS SHEET THK=0.8mm TO 1mm
DECK-1 COMP. VARIES VARIES 100 10 305

1
COMPOSITE SLABS

SCHEDULE OF COMPOSITE SLABS:

2
COMPOSITE SLABS

10Ø AT 305mm
10Ø AT 305mm

10Ø AT 305mm
10Ø AT 305mm

3
DESIGN OF HALF TURN STAIRS

x-axis mm w conc. 23.5 kn/m^3

x1 2000 H 3 m
x2 1000 b(step wd) 1000 mm
3000 y3
y2=gap
y- axis mm y1
y1 1000
y2 200 x1 x2
y3 1000
2200

RUNS ht level
flights pcs mm mm act.riser
f1 8 2000 1500 mm
f2 8 2000 1500 187.5
checking 16 3000

SUMMARY
act.riser tread D step wd m. barØ s d. barØ s
mm mm mm mm mm mm mm mm
187.5 250 150 1000 12 150 12 300

1
SCHEDULE OF COLUMNS FTGS-5

PROJECT
LOCATION note:
clear conc. cover=40mm
SCHEDULE OF COLUMNS
MARK DIMENSIONS(mm)
HT. LEVEL BAR Ø(mm) SECTION (pcs) SPACING OF LAT. TIES(10mmØ)
B D

BASE
TO PED 500 500 20 8 1 at .050m, . Rest at .20m o c.
PED

BASE
TO PED2 400 400 16 8 1 at .050m, . Rest at .20m o c.
PED2

ACI CODE NOTE:more than 4 pcs main bars,please provide additional ties
NOTE: USE 8mm Ø as additional link to column rebars

note:
clear conc. cover=75mm SCHEDULE OF FOOTINGS:
DIMENSIONS(mm) BARS(pcs)
MARK TYPE BAR Ø(mm)
L W D t BOTHWAYS
F1 ISOLATED 2500 2500 2000 400 20 16
F2 ISOLATED 2900 2900 2000 400 20 20

NOTE: DEPTH OF EXCAVATION SHALL BE BASED ON NATURAL GRADE LINE (NGL).

1
SCHEDULE OF COLUMNS FTGS-5

SCHEDULE OF MAT FOOTINGS


DIMENSIONS(mm) <-------REQUIRED DETAILING-------->
MARK TYPE
L W D t ***TOP FIBER*** ***BOTTOM FIBER***
F2 COMB 5060 5000 2000 500 REBARS REBARS
// to L // to W // to L // to W
note: 16Ø AT 200 16Ø AT 200 16Ø AT 200 16Ø AT 200
clear conc. cover=80mm

2.0 M

TOP FIBER

CHAIR BAR DIMENSION BOTTOM FIBER

t COVER bar Ǿ A B C SPACING PCS CHAIR bar Ǿ


mm mm mm mm mm mm m 1SQ MT COVER mm
500 75 16 500 286 600 1.0 1.0 8

2
SCHEDULE OF BEAMS-4

PROJECT
LOCATION note:
clear conc. cover=40mm
SCHEDULE OF BEAMS
DIMENSIONS(mm) REBARS DETAILS
MARK BAR Ø(mm) SPACING OF 10mmØ STIRRURS
B H AT SUPPORT(pcs) AT MIDSPAN(pcs)

3 2 CRITICAL SEGMENT BALANCE SEGMENT


FTB1 300 500 20
2 3 at .15 m c/c at .20 m c/c

4 2 CRITICAL SEGMENT BALANCE SEGMENT


FTB2/GB1 300 500 20
2 4 at .15 m c/c at .20 m c/c

Nominal Grades of Concrete

Concrete Grade Mix Ratio Compressive Strength Water-Cement-Ratio

MPa (N/mm^2 ) psi liters/40kg-cement

M20 1:1.5:3:0.50 20 3000 20

1
SCHEDULE OF BEAMS-4

NOTE:location of
vertical stirrups in beams

spacers are nothing but the small piece


of steel bar put between two layers

LAPPING LENGTH (ACI CODE 318-14)

FOR TENSION MEMBER (RCC BEAM)


48D

FOR COMPRESSION MEMBER (RCC COLUMN)


60D

WHERE D -DIAMETER OF BAR

2
SCHEDULE OF BEAMS-4

note:
at least 2 bars should go
full length of beam

CURTAILMENT OF BARS IN BEAMS


(ACI 318-14)

3
SCHEDULES OF STEEL BEAMS COLUMNS-4

conversion
inches mm
1 25.4

HORIZONTAL MEMBERS
ASSIGNMENT SECTION NAME DEPTH WIDTH FLANGE WEB WT WT
MARK mm mm mm mm LB/FT KG/M
SB1 W 14 × 34 355.1 171.3 11.6 7.2 34 50.75
(WF 14"X 7")

SB2/SRB1 W 12 × 26 310.4 164.8 9.7 5.8 26 38.82


(WF 12"X 6.5")

SRB2 W 14 × 132 373.4 373.4 26.26 16.38 132 196.9


(WF 14"X 14")

1
SCHEDULES OF STEEL BEAMS COLUMNS-4

VERTICAL MEMBERS
conversion
HT. LEVEL ASSIGNMENT SECTION NAME DEPTH WIDTH FLANGE WEB WT WT inches mm
MARK mm mm mm mm LB/FT KG/M 1 25.4
PEDESTAL SC1 W12X53 307.34 254 14.6 8.76 53 79.16
TO (WF 12"X 10")
ROOF BEAM

2
DETAILING OF ELEVATOR WALL

note:
clear conc. cover=25mm
WALL THK=250mm

TOP VIEW
LAYER 1
1-MT STRIP WALL

LAYER 2

12barØ AT 250mm
ELEVATION VIEW OF WALL

note:
adopt 8mmØ clips placed @ mid height of wall