The figure below shows the mass diagram for a stretch of road. Assuming the economical haul distance for dozers ,
scrapers, and trucks are 200m, 600m, and 1600m, respectively.
4000
3200
3000
2750 2750
2500
2200
2000
1500 1500
1200
1000 900
750
500
0 0
0 1 -4002 3 4 5 6 7 -4008 9 10 11 12 13 14 15 16 17 18 19 -250
20 21
-800
-1000 -1000 -1000
-1300 -1300
-2000 -1900
-3000