This document contains instructions for a classwork assignment on construction methods. Students are asked to: [1] Draw balance lines on a mass diagram showing haul distances for dozers, scrapers, and trucks; [2] Calculate haul quantities for scrapers and trucks; [3] Find the average haul distance of dozers and scrapers between stations 0-8; and [4] Calculate the average haul grade for scrapers between stations 0-8, given an elevation change of 30 meters. The mass diagram shows cut and fill volumes at each station along a stretch of road.

Uploaded by

cgc8bmxtgs
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
9 views

Civil Engineering Department CE475: Construction Methods Third 2023 Classwork 1

This document contains instructions for a classwork assignment on construction methods. Students are asked to: [1] Draw balance lines on a mass diagram showing haul distances for dozers, scrapers, and trucks; [2] Calculate haul quantities for scrapers and trucks; [3] Find the average haul distance of dozers and scrapers between stations 0-8; and [4] Calculate the average haul grade for scrapers between stations 0-8, given an elevation change of 30 meters. The mass diagram shows cut and fill volumes at each station along a stretch of road.

Uploaded by

cgc8bmxtgs
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Civil Engineering Department CE475: Construction methods

Third 2023
Classwork 1
Instructor Dr. Ahmed Taha
The figure below shows the mass diagram for a stretch of road. Assuming the economical haul distance for dozers ,
scrapers, and trucks are 200m, 600m, and 1600m, respectively.

a) Draw the balance lines for dozers, scrapers , and trucks.


b) What are the total haul quantities in BCM for : Scrapers and Trucks?
c) Calculate the average haul distance of dozers and scrapers working within stations 0 – 8.
d) The scrapers between stations 0 - 8 experience an elevation change of 30 meters. Calculate the average haul grade
for these scrapers.

4000

3200
3000
2750 2750
2500
2200
2000

1500 1500
1200
1000 900
750
500

0 0
0 1 -4002 3 4 5 6 7 -4008 9 10 11 12 13 14 15 16 17 18 19 -250
20 21
-800
-1000 -1000 -1000
-1300 -1300

-2000 -1900

-3000