0% found this document useful (1 vote)
214 views6 pages

Business Planfor Loan Requeston Injera Productionat Oromia Rigional State Ethiopia 21

This document is a business plan for a proposed injera production business called ***** Injera in ***** Town, Oromia Regional State, Ethiopia. The business seeks a loan of 4.7 million ETB from the Development Bank of Ethiopia. Key details include a total investment of 7.7 million ETB, an annual production capacity of over 2 million injera, projected employment of 31 individuals, and financial projections estimating an internal rate of return of 49% and net present value of 18.6 million. The plan outlines the proposed operations, management, financial forecasts, and expected social and economic benefits of the business, such as job creation and increased income.

Uploaded by

Wendirad Ymami
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (1 vote)
214 views6 pages

Business Planfor Loan Requeston Injera Productionat Oromia Rigional State Ethiopia 21

This document is a business plan for a proposed injera production business called ***** Injera in ***** Town, Oromia Regional State, Ethiopia. The business seeks a loan of 4.7 million ETB from the Development Bank of Ethiopia. Key details include a total investment of 7.7 million ETB, an annual production capacity of over 2 million injera, projected employment of 31 individuals, and financial projections estimating an internal rate of return of 49% and net present value of 18.6 million. The plan outlines the proposed operations, management, financial forecasts, and expected social and economic benefits of the business, such as job creation and increased income.

Uploaded by

Wendirad Ymami
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 6

See discussions, stats, and author profiles for this publication at: https://www.researchgate.

net/publication/376397324

Business Plan on Automated Injera Baking for Loan Request at Oromia


Regional State Ethiopia

Article in The Journal of Business · December 2023

CITATIONS READS

0 332

1 author:

Tahir Kasim
Jimma University
21 PUBLICATIONS 0 CITATIONS

SEE PROFILE

All content following this page was uploaded by Tahir Kasim on 12 January 2024.

The user has requested enhancement of the downloaded file.


BUSINESS PLAN ON INJERA
PRODUCTION

PROJECT NAME: ******* INJERA

PROJECT TYPE: INJERA PRODUCTION

PROJECT PROMOTER: *********

PROJECT LOCATION: ****** TOWN, OROMIA


REGIONAL STATE, ETHIOPIA

SUBMITTED TO: DEVELOPMENT BANK OF ETHIOPIA

PURPOSE: FOR LOAN REQUST OF FINANCIAL LEASE

DECEMBER, 2023

******, ETHIOPIA
Table Contents
Contents Page
TOC \o "1 - 3" \h \z \u"I............................................................................. EXECUTIVE SUMMARY
................................................................................................................................................... 1
1. INTRODUCTION .................................................................. Error! Bookmark not defined.
1.1. Promoter’s Profile ........................................................... Error! Bookmark not defined.
1.2. Establishment of the Project ............................................ Error! Bookmark not defined.
1.3. Vision .............................................................................. Error! Bookmark not defined.
1.4. Mission ............................................................................ Error! Bookmark not defined.
1.5. Goals ............................................................................... Error! Bookmark not defined.
1.6. Objectives of the Company ............................................. Error! Bookmark not defined.
2. MARKET ANALYSIS ........................................................... Error! Bookmark not defined.
2.1. Present Demand .............................................................. Error! Bookmark not defined.
2.2. SWOT Analysis .............................................................. Error! Bookmark not defined.
2.3. Pricing and Sales Forecast ............................................... Error! Bookmark not defined.
3. BUILDING CIVIL WORKS AND ENGINEERING ............. Error! Bookmark not defined.
3.1. Technology and Engineering .......................................... Error! Bookmark not defined.
3.1.1. Machinery & Equipment ........................................................... Error! Bookmark not defined.
3.1.2. Raw Materials, Inputs and Packing ........................................... Error! Bookmark not defined.
3.2. Production Program and Application .............................. Error! Bookmark not defined.
3.2.1. Production Program .................................................................. Error! Bookmark not defined.
3.4. Project Layout (Infrastructure)........................................ Error! Bookmark not defined.
4. PROJECT MANAGEMENT AND ORGANIZATION STRUCTURE . Error! Bookmark not
defined.
4.1. Project Management ....................................................... Error! Bookmark not defined.
4.2. Organizational Structure ................................................. Error! Bookmark not defined.
4.2.1. Major Duties and Responsibilities ............................................ Error! Bookmark not defined.
4.3. Proposed Employment Opportunity ................................ Error! Bookmark not defined.
4.4. Training Program ............................................................ Error! Bookmark not defined.
4.5. Activity Plan.................................................................... Error! Bookmark not defined.
5. PROJECTED FINANCIAL ANALYSIS ............................... Error! Bookmark not defined.
5.1. Assumptions .................................................................... Error! Bookmark not defined.
5.1.1. Initial Investment Cost .............................................................. Error! Bookmark not defined.
5.1.2. Annual Production Cost ............................................................ Error! Bookmark not defined.
5.1.3. Production Cost at Full Capacity .............................................. Error! Bookmark not defined.
5.2. Loan Amortization Schedule ........................................... Error! Bookmark not defined.
5.3. Projected Financial Statement ......................................... Error! Bookmark not defined.
5.3.1. Projected Income Statement...................................................... Error! Bookmark not defined.
5.3.2. Projected Cash Flow ................................................................. Error! Bookmark not defined.
5.3.3. Projected Discounted Cash Flow .............................................. Error! Bookmark not defined.
5.4. Financial Evaluation ....................................................... Error! Bookmark not defined.
5.4.1. Net Present Value (NPV) .......................................................... Error! Bookmark not defined.
5.4.2. Internal Rate of Return (IRR).................................................... Error! Bookmark not defined.
5.4.3. Profitability Index (Pi) .............................................................. Error! Bookmark not defined.
5.4.4. Break-Even Analysis (BEA) ..................................................... Error! Bookmark not defined.
5.4.5. Pay-Back Period (PBP) ............................................................. Error! Bookmark not defined.
6. RISKS ASSESSMENT, SUSTAIANABILITY AND EVALUATION . Error! Bookmark not

ii
defined.
6.1. Project Sustainability....................................................... Error! Bookmark not defined.
6.2. Monitoring and Evaluation.............................................. Error! Bookmark not defined.
6.3. Reporting Procedure ........................................................ Error! Bookmark not defined.
6.4. Gender Balance ............................................................... Error! Bookmark not defined.
7. ENVIRONMENTAL IMPACT .............................................. Error! Bookmark not defined.
8. SOCIO-ECONOMIC BENEFIT ............................................. Error! Bookmark not defined.
9. CONCLUSION ....................................................................... Error! Bookmark not defined.

iii
I. EXECUTIVE SUMMARY

Project Name: ***** Injera

Project Type: Production of Injera

Project Activity: Production of Injera

Project Location: ***** Town, Oromia Regional State.

Total Investment Capital: Birr 7.7 million.

Fixed Investment: 86%, Working Capital: 14%

Raw Materials: Teff flour and Starter (Absit).

Financial lease request: 4,707,450.00ETB

Production Capacity: 2,076,360 pieces Injera at full capacity.

IRR: & NPV: NPV: 18.6 million IRR: 49%

Employment Opportunity: 31 individuals; 26 on permanent 5 on casual basis of which 26


skilled & 5 unskilled laborers.

Social and Economic Benefits: will create forward linkage with different sectors, will
have employment opportunity and business development for youths, as well as generates
income for the Government in terms of foreign exchange and tax revenue.

Environmental Impact: not have any adverse impact on the environment.

Contact Person: +251 9*******

1
If You want read full document click below link
Download Link On Telegram Channel: https://t.me/bprojectp/17

View publication stats

You might also like