DPS Blade Distributed Power System Installation Guide (DPU90D, DPU120D)

This document provides instructions for installing Huawei's DPS Blade Distributed Power System (DPU90D and DPU120D models). It describes installation preparations including safety precautions, required tools and cables, product acceptance checks, and different mounting scenarios. Mounting scenarios covered include flush mounting on small/large poles or walls, and side mounting on small/large poles or walls. For each scenario, instructions are provided for installing the appropriate mounting kit and modules. The document aims to guide hardware installation engineers, commissioning engineers, and technical support staff on safely deploying the DPS Blade system.

Uploaded by

Sandra Gallardo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
280 views68 pages

DPS Blade Distributed Power System Installation Guide (DPU90D, DPU120D)

This document provides instructions for installing Huawei's DPS Blade Distributed Power System (DPU90D and DPU120D models). It describes installation preparations including safety precautions, required tools and cables, product acceptance checks, and different mounting scenarios. Mounting scenarios covered include flush mounting on small/large poles or walls, and side mounting on small/large poles or walls. For each scenario, instructions are provided for installing the appropriate mounting kit and modules. The document aims to guide hardware installation engineers, commissioning engineers, and technical support staff on safely deploying the DPS Blade system.

Uploaded by

Sandra Gallardo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 68

DPS Blade Distributed Power System (DPU90D,

DPU120D)

Installation Guide

Issue 01
Date 2022-04-30

HUAWEI DIGITAL POWER TECHNOLOGIES CO., LTD.


Copyright © Huawei Digital Power Technologies Co., Ltd. 2022. All rights reserved.
No part of this document may be reproduced or transmitted in any form or by any means without prior
written consent of Huawei Digital Power Technologies Co., Ltd.

Trademarks and Permissions

and other Huawei trademarks are the property of Huawei Technologies Co., Ltd.
All other trademarks and trade names mentioned in this document are the property of their respective
holders.

Notice
The purchased products, services and features are stipulated by the contract made between Huawei
Digital Power Technologies Co., Ltd. and the customer. All or part of the products, services and features
described in this document may not be within the purchase scope or the usage scope. Unless otherwise
specified in the contract, all statements, information, and recommendations in this document are
provided "AS IS" without warranties, guarantees or representations of any kind, either express or implied.
The information in this document is subject to change without notice. Every effort has been made in the
preparation of this document to ensure accuracy of the contents, but all statements, information, and
recommendations in this document do not constitute a warranty of any kind, express or implied.

Huawei Digital Power Technologies Co., Ltd.


Address: Huawei Digital Power Antuoshan Headquarters

Futian,Shenzhen 518043

People's Republic of China

Website: https://e.huawei.com

Issue 01 (2022-04-30) Copyright © Huawei Digital Power Technologies Co., Ltd. i


DPS Blade Distributed Power System (DPU90D,
DPU120D)
Installation Guide About This Document

About This Document

Purpose
This document describes how to install a distributed power system (DPS).
Figures provided in this document are for reference only.

Intended Audience
This document is intended for:
● Hardware installation engineers
● Installation and commissioning engineers
● Technical support engineers

Symbol Conventions
The symbols that may be found in this guide are defined as follows.

Symbol Description

Indicates a hazard with a high level of risk which, if not


avoided, will result in death or serious injury.

Indicates a hazard with a medium level of risk which, if not


avoided, could result in death or serious injury.

Indicates a hazard with a low level of risk which, if not


avoided, could result in minor or moderate injury.

Indicates a potentially hazardous situation which, if not


avoided, could result in equipment damage, data loss,
performance deterioration, or unanticipated results.
NOTICE is used to address practices not related to personal
injury.

Supplements the important information in the main text.


NOTE is used to address information not related to personal
injury, equipment damage, and environment deterioration.

Issue 01 (2022-04-30) Copyright © Huawei Digital Power Technologies Co., Ltd. ii


DPS Blade Distributed Power System (DPU90D,
DPU120D)
Installation Guide About This Document

Change History
Changes between document issues are cumulative. The latest document issue
contains all the changes made in earlier issues.

Issue 01 (2022-04-30)
The issue is the first official release.

Issue 01 (2022-04-30) Copyright © Huawei Digital Power Technologies Co., Ltd. iii
DPS Blade Distributed Power System (DPU90D,
DPU120D)
Installation Guide Contents

Contents

About This Document................................................................................................................ ii


1 Installation Preparations....................................................................................................... 1
1.1 Installation Precautions......................................................................................................................................................... 1
1.2 Preparing Tools.........................................................................................................................................................................3
1.3 Preparing Cables...................................................................................................................................................................... 4
1.4 Unpacking and Acceptance................................................................................................................................................. 6
1.5 Installation Scenarios............................................................................................................................................................. 7
1.5.1 Mounting Kits........................................................................................................................................................................ 7
1.5.2 Modules................................................................................................................................................................................... 9
1.5.3 Product Configurations...................................................................................................................................................... 9
1.5.4 Installation Scenarios....................................................................................................................................................... 11

2 System Installation (Flush Mounting Scenario)............................................................ 15


2.1 Flush Mounting on a Small Pole..................................................................................................................................... 15
2.1.1 Installing a Pole Mounting Kit...................................................................................................................................... 15
2.1.2 Installing Modules............................................................................................................................................................. 16
2.2 Flush Mounting on a Large Pole..................................................................................................................................... 17
2.2.1 Installing a Pole Mounting Kit...................................................................................................................................... 18
2.2.2 Installing Modules............................................................................................................................................................. 18
2.3 Flush Mounting on a Wall, Channel Steel, or Angle Steel..................................................................................... 20
2.3.1 Installing a Pole Mounting Kit...................................................................................................................................... 20
2.3.2 Installing Modules............................................................................................................................................................. 22

3 System Installation (Side Mounting Scenario).............................................................. 25


3.1 Side Mounting on a Small Pole....................................................................................................................................... 25
3.1.1 Installing a Pole Mounting Kit...................................................................................................................................... 25
3.1.2 Installing Modules............................................................................................................................................................. 26
3.2 Side Mounting on a Large Pole....................................................................................................................................... 29
3.2.1 Installing a Pole Mounting Kit...................................................................................................................................... 30
3.2.2 Installing Modules............................................................................................................................................................. 31
3.3 Side Mounting on a Wall, Channel Steel, or Angle Steel....................................................................................... 34
3.3.1 Installing a Pole Mounting Kit...................................................................................................................................... 34
3.3.2 Installing Modules............................................................................................................................................................. 36

4 Preparing Cables....................................................................................................................38

Issue 01 (2022-04-30) Copyright © Huawei Digital Power Technologies Co., Ltd. iv


DPS Blade Distributed Power System (DPU90D,
DPU120D)
Installation Guide Contents

4.1 Preparing a DC Power Cable............................................................................................................................................. 38


4.2 Preparing an AC Power Cable.......................................................................................................................................... 40

5 Installing Cables.................................................................................................................... 43
5.1 Installing Ground Cables.................................................................................................................................................... 43
5.2 Installing Communications Cables.................................................................................................................................. 43
5.3 Installing Power Cables....................................................................................................................................................... 44
5.4 Connecting Loads..................................................................................................................................................................47

6 Installing a Wireless Backhaul Module............................................................................49


7 Powering On the System..................................................................................................... 51
7.1 Checking Before Power-On................................................................................................................................................51
7.1.1 Checking Hardware Installation................................................................................................................................... 51
7.1.2 Checking Electrical Connections................................................................................................................................... 51
7.1.3 Checking Cable Installation........................................................................................................................................... 51
7.2 Connecting the AC Power Supply....................................................................................................................................51
7.3 Power-On Commissioning................................................................................................................................................. 52

A Hoisting a 100 Ah Lithium Battery................................................................................... 53


B Preparing Terminals............................................................................................................. 58
C Adding DC Loads................................................................................................................... 60
D Acronyms and Abbreviations............................................................................................. 61

Issue 01 (2022-04-30) Copyright © Huawei Digital Power Technologies Co., Ltd. v


DPS Blade Distributed Power System (DPU90D,
DPU120D)
Installation Guide 1 Installation Preparations

1 Installation Preparations

1.1 Installation Precautions

CAUTION

● Wear gloves during installation.


● When moving a module with one hand, ensure that the bottom of the
connectors does not contact or hit the ground or staircase. When moving a
module with two hands, hold both the handle and traction ring.
● Do not install a module with power on. Ensure that the angle between a
module and the line vertical to the ground is within 10 degrees.
● Do not assemble a lithium battery with a remote radio unit (RRU).
● In high-temperature areas (where the highest ambient temperature exceeds
45°C), lithium batteries cannot be combined with power supply units (PSUs).
● Ensure that the paint on the module exterior is intact. If paint has flaked off,
repaint the area to avoid corrosion.
● When securing mounting kits on a large pole, ensure that the hoops are closely
attached to the pole and there is no foreign matter between the hoops and the
pole.
● When a PSU is assembled with a lithium battery, ensure that the front panel of
the PSU is in the same direction as that of the lithium battery, and all module
handles are at the same side.
● The device must be powered on within 24 hours after being unpacked. During
maintenance, the power-off time cannot exceed 24 hours.
● If a lithium battery sunshade is configured, install the sunshade on the outer
side of the lithium battery after the PSU and lithium battery are installed.
● This device (or system) must be installed or used in a restricted area and
accessible only to service personnel.

Issue 01 (2022-04-30) Copyright © Huawei Digital Power Technologies Co., Ltd. 1


DPS Blade Distributed Power System (DPU90D,
DPU120D)
Installation Guide 1 Installation Preparations

Application Environment
To ensure good ventilation and heat dissipation around the modules, the
application environment of the modules must meet the following requirements:
● Do not install the modules in an enclosed indoor or outdoor cabinet without a
cooling system.
● Do not install the modules in an enclosed camouflage box.
● Do not install the modules in a simple equipment room that is completely
enclosed and does not have a cooling system.
● When multiple modules are installed together, the minimum clearance
requirements must be met.
● Mounting kits cannot be used in indoor scenarios.

CAUTION

An improper application environment reduces the heat dissipation efficiency and


may cause the modules to fail to work properly.

Figure 1-1 Improper application environment

Installation Mode
● The specifications of the installation support described in this document only
define the exterior and dimensions of the mounting kits. Before installing a
module, determine the strength and reliability of the installation support
based on the weight of the module.
● To facilitate heat dissipation and prevent water from entering the ports at the
bottom of a module, keep a correct installation direction and ensure that the
angle between the module and a line vertical to the ground is within 10
degrees.
● On a tower, a module can be installed on a pole, channel steel, or angle steel.
It is recommended that multiple modules be side-mounted on the main pole
of a tower. If the horizontal distance between the main and auxiliary poles on
a tower is greater than or equal to 810 mm, side-mounting is recommended
for installing modules on the auxiliary pole to meet the minimum clearance
requirements. If the horizontal distance is less than 810 mm, flush-mounting
is recommended.

Issue 01 (2022-04-30) Copyright © Huawei Digital Power Technologies Co., Ltd. 2


DPS Blade Distributed Power System (DPU90D,
DPU120D)
Installation Guide 1 Installation Preparations

Figure 1-2 Requirements for the vertical deviation angle of a module

(1) Module (2) Installation support (pole, channel steel,


angle steel, or wall)

Personnel Requirements
Installation personnel must be qualified and trained, and familiar with correct
operation methods and safety precautions.

When organizing installation personnel, ensure that:

● Customers' installation personnel must be trained by the Company and


understand the installation and operation.
● The number of installation personnel varies based on the project progress and
installation environment. Typically, two to four persons are required.
NOTE

If a winch or pulley is used, three to five installation persons are recommended.

1.2 Preparing Tools

NOTICE

Use tools with insulated handles. The following table is for reference only.

Table 1-1 Installation tools and instruments

Issue 01 (2022-04-30) Copyright © Huawei Digital Power Technologies Co., Ltd. 3


DPS Blade Distributed Power System (DPU90D,
DPU120D)
Installation Guide 1 Installation Preparations

1.3 Preparing Cables


All cables must comply with local regulations, standards, and customer
requirements.
The cross-sectional area of a power cable depends on the current that flows
through it and the allowed voltage drop.
The copper cable specifications are for reference only. Choose proper cables based
on site requirements.

Issue 01 (2022-04-30) Copyright © Huawei Digital Power Technologies Co., Ltd. 4


DPS Blade Distributed Power System (DPU90D,
DPU120D)
Installation Guide 1 Installation Preparations

Table 1-2 Cable list


Cable One End Other End

Connector Connection Connector Connection


Position Position
(Equipment, (Equipment,
Module, or Port) Module, or Port)

Ground cable OT terminal (16 Ground terminal OT terminal (16 Site ground bar
mm2, M6) of the PSU mm2, M8)

Equipotential OT terminal (10 Ground terminal OT terminal (10 Ground terminal


cable (04151857) mm2, M6) of the PSU mm2, M6) on the RRU/AAU/
lithium battery

External alarm Waterproof DB15 PSU COM_ALM Waterproof DB15 DB15 port on the
cable (04080336) male connector port male connector FDD/TDD RRU

External alarm Waterproof DB9 DB9 port on the


cable (04080419) male connector TDD RRU

External alarm RJ45 connector Communications


cable (04080416) port on the
Communication BBU3900/
over dry contacts BBU3910/
BBU5900/
External alarm BBU5900A
cable (04080420)
Communication
over RS485

External alarm Waterproof DB15 Communications


cable (04080421) male connector port on the
Communication BBU3910A
over RS485

External alarm Scattered cable Communications


cable (04080342) port on the third-
party monitoring
device

DC output power Bare wire: PSU LOAD1– Female fast Power port on
cable 4–8.2 mm2 LOAD7 ports connector the RRU or AAU
(traditional round (pressfit type)
cable)
4–10 mm2 (new
D-shaped cable)

AC input power Bare wire: 4–16 PSU PWR port Depends on External power
cable (DPU90D) mm2 external power supply device
devices.
AC input power Bare wire: 6–16
cable (DPU120D) mm2

Issue 01 (2022-04-30) Copyright © Huawei Digital Power Technologies Co., Ltd. 5


DPS Blade Distributed Power System (DPU90D,
DPU120D)
Installation Guide 1 Installation Preparations

Cable One End Other End

Connector Connection Connector Connection


Position Position
(Equipment, (Equipment,
Module, or Port) Module, or Port)
NOTE
● If a cord end terminal is configured, strip the cable based on the length of the cord end terminal. If no cord
end terminal is configured, you are advised to use a cord end terminal with an insertion depth of 18 mm.
● The size data in the table is applicable when the ambient temperature is 30°C (in air) and only cables in a
single loop are involved.
● When the ambient temperature is not 30°C or cables in multiple loops are routed together, use cables with
larger cross-sectional areas if the cabling distance is long.
● Power cables should be able to withstand at least 105°C.

1.4 Unpacking and Acceptance


Check that the products delivered onsite are intact after unpacking and
acceptance.

Context
NOTE

When transporting, carrying, and installing equipment:


● Ensure that components or parts do not collide with objects such as doors, walls, or
shelves.
● Wear clean gloves. Do not touch components with bare hands or wet or dirty gloves.

Procedure
Step 1 Check the total number of goods against the packing list attached to each packing
case.

If... Then...

The total number of goods is Go to Step 2.


consistent with that on the packing
list.

The total number of goods is Find the cause and contact the local
inconsistent with that on the packing office.
list.

Step 2 Check each packing case.

If... Then...

The packing case is intact. Go to Step 3.

Issue 01 (2022-04-30) Copyright © Huawei Digital Power Technologies Co., Ltd. 6


DPS Blade Distributed Power System (DPU90D,
DPU120D)
Installation Guide 1 Installation Preparations

If... Then...

The packing case is severely damaged Find the cause and contact the local
or wet. office.

The shockwatch label is red. Stop unpacking. Claim compensation


against the shipping company.

Step 3 Check the number and types of devices in each packing case against the packing
list.
If... Then...

The number and types of devices are Sign on the Packing List with the
consistent with that on the packing customer.
list.

Any device is missing, damaged, or of Contact the local office.


a wrong type.

CAUTION

To protect devices and facilitate future problem diagnosis, store unpacked devices
and packing materials indoors. Take photos of the storage site, rusty or corroded
devices, and the packing cases and materials. Keep the photos for future reference.

----End

1.5 Installation Scenarios

1.5.1 Mounting Kits


Figure 1-3 Mounting kits

Issue 01 (2022-04-30) Copyright © Huawei Digital Power Technologies Co., Ltd. 7


DPS Blade Distributed Power System (DPU90D,
DPU120D)
Installation Guide 1 Installation Preparations

No. BOM Item Installation Applicable Function


Number Scenario Module

1 21150763 12 L small- Small pole All PSUs and 20 Used with conversion
pole Ah/50 Ah lithium brackets to mount a
mounting kit batteries module on a wall or pole.

2 21151211 18 L small- Small pole 100 Ah lithium Used with conversion


pole battery brackets to mount a 100
mounting kit Ah lithium battery on a
wall or pole.

3 21155091 Large-pole Mounting on All PSUs and Used with conversion


mounting kit a wall or lithium batteries brackets to mount a
pole module on a large pole.

4 21150692 Large-pole Mounting on All PSUs and 20 Used with conversion


mounting kit a wall or Ah/50 Ah lithium brackets to mount a
pole batteries module on a large pole.

5 21150763-0 12 L Mounting on All PSUs and 20 Used with conversion


04 mounting kit a wall or Ah/50 Ah lithium brackets and large-pole
pole batteries mounting kits.

6 21150765 Conversion - All PSUs and Installed on a PSU or


bracket lithium batteries lithium battery, used to
install a mounting kit

7 21154832 Connecting Mounting on All PSUs and Installed on a lithium


kit a wall lithium batteries battery, used with a
conversion bracket to
side-mount a module on
a wall

NOTE

The clearance requirements and installation method of a 18 L small-pole mounting kit are
the same as those of a 12 L small-pole mounting kit. The following describes the clearance
requirements and installation method of a 12 L small-pole mounting kit.

Issue 01 (2022-04-30) Copyright © Huawei Digital Power Technologies Co., Ltd. 8


DPS Blade Distributed Power System (DPU90D,
DPU120D)
Installation Guide 1 Installation Preparations

1.5.2 Modules
Table 1-3 Simplified figures
Module 4.5 kW/6 kW PSU 20 Ah/50 Ah Lithium 100 Ah Lithium Battery
Battery

Front
view

Models DPU90D-N15T1 DBU20B-N12A3 DBU100B-N25A1


(02312WVW), DPU120D- (01074797), DBU20B- (01076035)
N15A1 (02312WUA), N12A4 (01075936-001),
DPU120D-N15A2 DBU50B-N12A1
(02313JDG) (01074764), DBU50B-
N12A2 (01075954),
DBU50B-N12A3
(01076026)

1.5.3 Product Configurations


Table 1-4 Product configurations
Scenario Installation Maximum Capacity/Layer Maximum System
Mode Configurations

Small pole Side ● One PSU + Two 20 Ah/50 Ah lithium ● Two PSUs + Four
and large mounting batteries 20 Ah/50 Ah
pole ● One PSU + One 100 Ah lithium battery lithium batteries
● Two PSUs + Two
Wall, Flush ● 1 PSU 100 Ah lithium
channel mounting ● 1 lithium battery batteries
steel, and
CAUTION
angle steel If the system
configuration exceeds
the maximum capacity/
layer, install the devices
on different layers.

Issue 01 (2022-04-30) Copyright © Huawei Digital Power Technologies Co., Ltd. 9


DPS Blade Distributed Power System (DPU90D,
DPU120D)
Installation Guide 1 Installation Preparations

Clearance Requirements for Installing Modules at One Layer

Figure 1-4 Clearance requirements for installing modules at one layer (using
multiple modules as an example; unit: mm)

Clearance Requirements for Installing Modules at Multiple Layers

Table 1-5 Clearance requirements for installing modules at multiple layers

Installed on One Side Back-to-Back Installation

Distance between upper-layer and Distance between upper-layer and


lower-layer pole mounting kits: 900 lower-layer pole mounting kits: 300
mm mm

NOTICE

To facilitate capacity expansion, it is recommended that lithium batteries and PSUs


be installed at different layers.

Issue 01 (2022-04-30) Copyright © Huawei Digital Power Technologies Co., Ltd. 10


DPS Blade Distributed Power System (DPU90D,
DPU120D)
Installation Guide 1 Installation Preparations

1.5.4 Installation Scenarios


Pole Diameter Requirements

Table 1-6 Pole diameter


Small Pole Large Pole

● The diameter of the small pole ranges from ● The diameter of the large pole ranges from
60 mm to 114 mm. 114 mm to 400 mm.
● The recommended wall thickness of a pole is ● The recommended wall thickness of a pole is
4 mm or above. 4 mm or above.

NOTE

If the main pole on a tower is longer than 2 m and it is difficult for installation personnel to
carry a 100 Ah lithium battery onto the pole, refer to A Hoisting a 100 Ah Lithium Battery
to install the lithium battery.

Issue 01 (2022-04-30) Copyright © Huawei Digital Power Technologies Co., Ltd. 11


DPS Blade Distributed Power System (DPU90D,
DPU120D)
Installation Guide 1 Installation Preparations

Side Mounting on a Pole

Table 1-7 12 L mounting kits (using a small pole as an example)

One Pole Mounting Two Pole Mounting Kits Three Pole Mounting Kits
Kit

NOTE NOTE
● Scenario 1: The pole mounting kit is ● In this scenario, two 20 Ah/50
installed on the right side. In this Ah lithium batteries (left and
scenario, one 20 Ah/50 Ah lithium battery middle) are connected in
(left) is connected in parallel with one parallel with one PSU (right).
PSU (right). ● A maximum of three pole
● Scenario 2: The pole mounting kit is mounting kits are allowed per
installed on the left side. In this scenario, layer in pole mounting
two 20 Ah/50 Ah lithium batteries are scenarios.
installed.

NOTE
● A maximum of three pole-mounting kits and 76 kg load bearing are allowed per layer.
● For large pole mounting, the main bracket in the small-pole mounting kit is used. For details about the
installation scenarios, see the figures in the table.

Table 1-8 18 L mounting kits (using a small pole as an example)

One Pole Mounting Kit Two Pole Mounting Kits

NOTE
The 18 L mounting kit is used with the main bracket in the 12 L
mounting kit and applies to the scenario where one 100 Ah lithium
battery (left) is connected in parallel with one PSU (right).

NOTE
● A maximum of two pole-mounting kits and 76 kg load bearing are allowed per layer.
● For large pole mounting, the main bracket in the small-pole mounting kit is used. For details about the
installation scenarios, see the figures in the table.

Issue 01 (2022-04-30) Copyright © Huawei Digital Power Technologies Co., Ltd. 12


DPS Blade Distributed Power System (DPU90D,
DPU120D)
Installation Guide 1 Installation Preparations

Flush Mounting on a Wall, Channel Steel, or Angle Steel


NOTE

● Only one pole-mounting kit can be installed on a wall, channel steel, or angle steel.
● The wall must be made of reinforced concrete and can withstand at least four times the
weight of all PSUs and lithium batteries. In addition, the wall must be able to withstand
a 1.25 kN pulling force vertical to the wall surface without being damaged.
● Expansion anchor bolts must be tightened with a torque of 25 N·m, the bolts must work
properly, and the wall must remain intact without cracks.
● A maximum of one PSU or one lithium battery can be mounted on each layer on
channel steel or angle steel.

Table 1-9 Flush mounting


Wall Channel Steel Angle Steel

CAUTION

If the narrower edge of channel steel is less than 40 mm wide, only installation
methods a and b are supported.

Issue 01 (2022-04-30) Copyright © Huawei Digital Power Technologies Co., Ltd. 13


DPS Blade Distributed Power System (DPU90D,
DPU120D)
Installation Guide 1 Installation Preparations

Figure 1-5 Top view of installation on channel steel

Issue 01 (2022-04-30) Copyright © Huawei Digital Power Technologies Co., Ltd. 14


DPS Blade Distributed Power System (DPU90D,
DPU120D)
Installation Guide 2 System Installation (Flush Mounting Scenario)

2 System Installation (Flush Mounting


Scenario)

2.1 Flush Mounting on a Small Pole

2.1.1 Installing a Pole Mounting Kit


1. Determine a position for installing the 2. Secure the mounting kit.
pole mounting kit.

NOTE NOTE
As shown in the figure, the recommended clearance
● Verify that the arrows on the pole mounting kit
between the mounting kit and ground is between
are pointing upwards.
1200 mm to 1600 mm. If this is not feasible,
clearance specified in Clearance Requirements for ● Tighten the nuts on the two bolts and ensure that
Installing Modules at Multiple Layers is also the clearance between the two sides of the
acceptable. mounting kit is the same.

Issue 01 (2022-04-30) Copyright © Huawei Digital Power Technologies Co., Ltd. 15


DPS Blade Distributed Power System (DPU90D,
DPU120D)
Installation Guide 2 System Installation (Flush Mounting Scenario)

2.1.2 Installing Modules


1 PSU
1. Remove the conversion bracket from the 2. Install the PSU to the pole.
rear of the PSU and install it on the
connecting kit on the side of the PSU.

1 Lithium Battery (20 Ah/50 Ah)


1. Install a 2. Remove the conversion 3. Install the 4. Install the sun shield on
connecting kit bracket from the rear of lithium battery the other side of the
to the side of the lithium battery and to the pole. lithium battery.
the lithium install it on the
battery. connecting kit on the side
of the lithium battery.

NOTE
If a sun shield is needed,
install it at the outer side of
the lithium battery.

Issue 01 (2022-04-30) Copyright © Huawei Digital Power Technologies Co., Ltd. 16


DPS Blade Distributed Power System (DPU90D,
DPU120D)
Installation Guide 2 System Installation (Flush Mounting Scenario)

1 Lithium Battery (100 Ah)


1. Install a connecting kit to the 2. Remove the conversion bracket from the rear of the
side of the lithium battery. lithium battery and install it on the connecting kit on
the side of the lithium battery.

3. Install the lithium battery to the 4. Install the sun shield on the other side of the
pole. lithium battery.

NOTE
If a sun shield is needed, install it at the outer side of the lithium
battery.

2.2 Flush Mounting on a Large Pole

Issue 01 (2022-04-30) Copyright © Huawei Digital Power Technologies Co., Ltd. 17


DPS Blade Distributed Power System (DPU90D,
DPU120D)
Installation Guide 2 System Installation (Flush Mounting Scenario)

2.2.1 Installing a Pole Mounting Kit


Installing on a Large Pole (21150692)
1. Remove the main bracket 2. Assemble a large-pole 3. Install the large-pole
from the mounting kit. mounting kit. mounting kit onto the
large pole.

2.2.2 Installing Modules


1 PSU
1. Remove the conversion bracket from the 2. Install the PSU to the pole.
rear of the PSU and install it on the left side
of the PSU.

Issue 01 (2022-04-30) Copyright © Huawei Digital Power Technologies Co., Ltd. 18


DPS Blade Distributed Power System (DPU90D,
DPU120D)
Installation Guide 2 System Installation (Flush Mounting Scenario)

1 Lithium Battery (20 Ah/50 Ah)


1. Install a 2. Remove the conversion 3. Install the 4. Install the sun shield on
connecting kit bracket from the rear of lithium battery the other side of the
to the side of the lithium battery and to the pole. lithium battery.
the lithium install it on the
battery. connecting kit on the side
of the lithium battery.

NOTE
If a sun shield is needed,
install it at the outer side of
the lithium battery.

1 Lithium Battery (100 Ah)


1. Install a connecting kit to the 2. Remove the conversion bracket from the rear of the
side of the lithium battery. lithium battery and install it on the connecting kit on
the side of the lithium battery.

Issue 01 (2022-04-30) Copyright © Huawei Digital Power Technologies Co., Ltd. 19


DPS Blade Distributed Power System (DPU90D,
DPU120D)
Installation Guide 2 System Installation (Flush Mounting Scenario)

3. Install the lithium battery to the 4. Install the sun shield on the other side of the
pole. lithium battery.

NOTE
If a sun shield is needed, install it at the outer side of the lithium
battery.

2.3 Flush Mounting on a Wall, Channel Steel, or Angle


Steel

2.3.1 Installing a Pole Mounting Kit


Wall Mounting
1. Remove the main bracket and pole 2. Closely attach the pole mounting kit to the
mounting kit from the mounting kit. wall, level the mounting position with a level,
and mark mounting points with a marker.

Issue 01 (2022-04-30) Copyright © Huawei Digital Power Technologies Co., Ltd. 20


DPS Blade Distributed Power System (DPU90D,
DPU120D)
Installation Guide 2 System Installation (Flush Mounting Scenario)

3. Drill holes at the marked mounting points and install expansion anchor bolts in the holes.

(1) M10x80
bolt
(2) Nut
(3) Spring
washer
(4) Flat
Procedure: washer
(1) Drill holes vertically at the marked mounting points using a hammer drill (5) Expansion
with a Ф12 mm drill bit. Ensure that the depth of holes ranges from 55 mm to sleeve
60 mm.
(2) Partially tighten the expansion anchor bolts and vertically insert them into
the holes.
(3) Knock the expansion anchor bolts using a rubber mallet until the expansion
sleeves are fully inserted into the holes.
(4) Tighten the expansion anchor bolts, loosen the bolts in a reverse direction,
and remove the M10 nuts, spring washers, and then flat washers.
CAUTION
● To prevent inhalation or eye contact with dust, take preventive measures when drilling holes.
● After dismantling an expansion anchor bolt, level the front of the expansion sleeve with the wall. Otherwise,
the mounting kit cannot be securely installed on the wall.

4. Align the holes on the pole mounting 5. Install the main bracket onto the pole
kit with the expansion anchor bolts, place mounting kit.
the flat washers, spring washers, and nuts
on the expansion anchor bolts, and then
tighten the nuts.

Issue 01 (2022-04-30) Copyright © Huawei Digital Power Technologies Co., Ltd. 21


DPS Blade Distributed Power System (DPU90D,
DPU120D)
Installation Guide 2 System Installation (Flush Mounting Scenario)

Channel Steel/Angle Steel Mounting


1. Determine a position for 2. Install the pole mounting 2. Install the pole mounting
installing the pole mounting kit onto the channel steel. kit onto the angle steel.
kit.

NOTE
As shown in the figure, the NOTE NOTE
recommended clearance between ● Verify that the arrows on the ● Verify that the arrows on the
the mounting kit and ground is pole mounting kit are pointing pole mounting kit are pointing
between 1200 mm to 1600 mm. upwards. upwards.
If this is not feasible, clearance
● Tighten the nuts on the two ● Tighten the nuts on the two
specified in Clearance
bolts and ensure that the bolts and ensure that the
Requirements for Installing
clearance between the two clearance between the two
Modules at Multiple Layers is
sides of the mounting kit is sides of the mounting kit is
also acceptable.
the same. the same.

2.3.2 Installing Modules


1 PSU
1. Remove the 2. Install the PSU onto the pole mounting kit.
conversion bracket from
the rear of the PSU and Wall Channel steel Angle steel
install it on the side of
the PSU.

Issue 01 (2022-04-30) Copyright © Huawei Digital Power Technologies Co., Ltd. 22


DPS Blade Distributed Power System (DPU90D,
DPU120D)
Installation Guide 2 System Installation (Flush Mounting Scenario)

1 Lithium Battery (20 Ah/50 Ah)


1. Install a connecting 2. Remove the conversion 3. Install the sun shield on the
kit to the side of the bracket from the rear of the other side of the lithium
lithium battery. lithium battery and install it on battery.
the connecting kit on the side of
the lithium battery.

NOTE
If a sun shield is needed, install it at
the outer side of the lithium
battery.

4. Install the lithium battery onto the pole mounting kit.

Wall Channel steel Angle steel

Issue 01 (2022-04-30) Copyright © Huawei Digital Power Technologies Co., Ltd. 23


DPS Blade Distributed Power System (DPU90D,
DPU120D)
Installation Guide 2 System Installation (Flush Mounting Scenario)

1 Lithium Battery (100 Ah)


1. Install a connecting 2. Remove the conversion 3. Install the sun shield on the
kit to the side of the bracket from the rear of the other side of the lithium
lithium battery. lithium battery and install it on battery.
the connecting kit on the side of
the lithium battery.

NOTE
If a sun shield is needed, install it at
the outer side of the lithium
battery.

4. Install the lithium battery onto the pole mounting kit.

Wall Channel steel Angle steel

NOTE
When a lithium battery is installed on a
wall, it is recommended that the lithium
battery be installed less than or equal to
1 m above the ground.

Issue 01 (2022-04-30) Copyright © Huawei Digital Power Technologies Co., Ltd. 24


DPS Blade Distributed Power System (DPU90D,
DPU120D)
Installation Guide 3 System Installation (Side Mounting Scenario)

3 System Installation (Side Mounting


Scenario)

3.1 Side Mounting on a Small Pole

3.1.1 Installing a Pole Mounting Kit


1. Determine a position for installing the pole 2. Secure the mounting kit.
mounting kit.

NOTE NOTE
As shown in the figure, the recommended clearance ● Verify that the arrows on the pole mounting kit
between the mounting kit and ground is between are pointing upwards.
1200 mm to 1600 mm. If this is not feasible, clearance
specified in Clearance Requirements for Installing ● Tighten the nuts on the two bolts and ensure
Modules at Multiple Layers is also acceptable. that the clearance between the two sides of the
mounting kit is the same.

Issue 01 (2022-04-30) Copyright © Huawei Digital Power Technologies Co., Ltd. 25


DPS Blade Distributed Power System (DPU90D,
DPU120D)
Installation Guide 3 System Installation (Side Mounting Scenario)

3. Install the main bracket based on site requirements.

Install the main bracket on the Install the main bracket on Install the main brackets
left. the right. on both sides.

NOTE
● Remove the main bracket from the other pole mounting kit.
● When installing the left and right main brackets, ensure that the opening the U-shaped slot on the main
bracket face downwards, as shown in the preceding figures.
● For details about pole mounting scenarios, see Side Mounting on a Pole.

3.1.2 Installing Modules


1 PSU
1. Install the PSU onto the pole mounting kit.

Issue 01 (2022-04-30) Copyright © Huawei Digital Power Technologies Co., Ltd. 26


DPS Blade Distributed Power System (DPU90D,
DPU120D)
Installation Guide 3 System Installation (Side Mounting Scenario)

1 Lithium Battery (100 Ah)


1. Install the lithium battery onto the pole mounting kit.

1 PSU + 1 Lithium Battery (20 Ah/50 Ah)


1. Install the lithium battery and PSU onto 2. Install a connecting plate.
the pole mounting kit.

NOTE
If a sun shield is needed, install it at the outer side of
the lithium battery.

Issue 01 (2022-04-30) Copyright © Huawei Digital Power Technologies Co., Ltd. 27


DPS Blade Distributed Power System (DPU90D,
DPU120D)
Installation Guide 3 System Installation (Side Mounting Scenario)

1 PSU + 2 Lithium Batteries (20 Ah/50 Ah)


1. Install the lithium batteries and PSUs onto 2. Install connecting plates.
the pole mounting kit.

NOTE
If a sun shield is needed, install it at the outer side of
the lithium battery.

2 PSUs + 4 Lithium Batteries (Maximum Configuration, 20 Ah/50 Ah Lithium


Batteries)
NOTE

The maximum load bearing of a single layer is 76 kg.

Issue 01 (2022-04-30) Copyright © Huawei Digital Power Technologies Co., Ltd. 28


DPS Blade Distributed Power System (DPU90D,
DPU120D)
Installation Guide 3 System Installation (Side Mounting Scenario)

1 PSU + 1 Lithium Battery (100 Ah)


1. Install the lithium batteries and PSUs onto 2. Install a connecting plate.
the pole mounting kit.

NOTE
If a sun shield is needed, install it at the outer side of
the lithium battery.

2 PSUs + 2 Lithium Batteries (Maximum Configuration, 100 Ah Lithium


Batteries)
NOTE

The maximum load bearing of a single layer is 76 kg.

3.2 Side Mounting on a Large Pole

Issue 01 (2022-04-30) Copyright © Huawei Digital Power Technologies Co., Ltd. 29


DPS Blade Distributed Power System (DPU90D,
DPU120D)
Installation Guide 3 System Installation (Side Mounting Scenario)

3.2.1 Installing a Pole Mounting Kit


Installing on a Large Pole (21155091)
1. Remove the main bracket 2. Assemble a large-pole 3. Install the large-
from the mounting kit. mounting kit. pole mounting kit
onto the large pole.

4. Install the main bracket based on site requirements.

Install the main bracket on the Install the main bracket on Install the main brackets
left. the right. on both sides.

NOTE
● Remove the main bracket from the other pole mounting kit.
● When installing the left and right main brackets, ensure that the opening the U-shaped slot on the main
bracket face downwards, as shown in the preceding figures.
● For details about pole mounting scenarios, see Side Mounting on a Pole.

Issue 01 (2022-04-30) Copyright © Huawei Digital Power Technologies Co., Ltd. 30


DPS Blade Distributed Power System (DPU90D,
DPU120D)
Installation Guide 3 System Installation (Side Mounting Scenario)

3.2.2 Installing Modules


1 PSU
1. Install the PSU onto the pole mounting kit.

1 Lithium Battery (100 Ah)


1. Install the lithium battery onto the pole mounting kit.

Issue 01 (2022-04-30) Copyright © Huawei Digital Power Technologies Co., Ltd. 31


DPS Blade Distributed Power System (DPU90D,
DPU120D)
Installation Guide 3 System Installation (Side Mounting Scenario)

1 PSU + 1 Lithium Battery (20 Ah/50 Ah)


1. Install the lithium battery and PSU onto 2. Install a connecting plate.
the pole mounting kit.

NOTE
If a sun shield is needed, install it at the outer side of
the lithium battery.

1 PSU + 2 Lithium Batteries (20 Ah/50 Ah)


1. Install the lithium battery and PSU onto 2. Install connecting plates.
the pole mounting kit.

NOTE
If a sun shield is needed, install it at the outer side of
the lithium battery.

2 PSUs + 4 Lithium batteries (Maximum Configuration)


NOTE

The maximum load bearing of a single layer is 76 kg.

Issue 01 (2022-04-30) Copyright © Huawei Digital Power Technologies Co., Ltd. 32


DPS Blade Distributed Power System (DPU90D,
DPU120D)
Installation Guide 3 System Installation (Side Mounting Scenario)

1 PSU + 1 Lithium Battery (100 Ah)


1. Install the lithium battery and PSU onto 2. Install a connecting plate.
the pole mounting kit.

NOTE
If a sun shield is needed, install it at the outer side of
the lithium battery.

Issue 01 (2022-04-30) Copyright © Huawei Digital Power Technologies Co., Ltd. 33


DPS Blade Distributed Power System (DPU90D,
DPU120D)
Installation Guide 3 System Installation (Side Mounting Scenario)

2 PSUs + 2 Lithium Batteries (100 Ah)

3.3 Side Mounting on a Wall, Channel Steel, or Angle


Steel

3.3.1 Installing a Pole Mounting Kit

Wall Mounting
1. Remove the main bracket and pole 2. Closely attach the pole mounting kit to the
mounting kit from the mounting kit. wall, level the mounting position with a level,
and mark mounting points with a marker.

Issue 01 (2022-04-30) Copyright © Huawei Digital Power Technologies Co., Ltd. 34


DPS Blade Distributed Power System (DPU90D,
DPU120D)
Installation Guide 3 System Installation (Side Mounting Scenario)

3. Drill holes at the marked mounting points and install expansion anchor bolts in the holes.

(1) M10x80
bolt
(2) Nut
(3) Spring
washer
(4) Flat
Procedure: washer
(1) Drill holes vertically at the marked mounting points using a hammer drill (5) Expansion
with a Ф12 mm drill bit. Ensure that the depth of holes ranges from 55 mm to sleeve
60 mm.
(2) Partially tighten the expansion anchor bolts and vertically insert them into
the holes.
(3) Knock the expansion anchor bolts using a rubber mallet until the expansion
sleeves are fully inserted into the holes.
(4) Tighten the expansion anchor bolts, loosen the bolts in a reverse direction,
and remove the M10 nuts, spring washers, and then flat washers.
CAUTION
● To prevent inhalation or eye contact with dust, take preventive measures when drilling holes.
● After dismantling an expansion anchor bolt, level the front of the expansion sleeve with the wall. Otherwise,
the mounting kit cannot be securely installed on the wall.

4. Align the holes on the pole mounting 5. Install the main brackets onto the pole
kit with the expansion anchor bolts, place mounting kits.
the flat washers, spring washers, and nuts
on the expansion anchor bolts, and then
tighten the nuts.

Issue 01 (2022-04-30) Copyright © Huawei Digital Power Technologies Co., Ltd. 35


DPS Blade Distributed Power System (DPU90D,
DPU120D)
Installation Guide 3 System Installation (Side Mounting Scenario)

Channel Steel/Angle Steel Mounting


1. Determine a position for 2. Install the pole mounting 2. Install the pole mounting
installing the pole mounting kit onto the channel steel. kit onto the angle steel.
kit.

NOTE
As shown in the figure, the NOTE NOTE
recommended clearance between ● Verify that the arrows on the ● Verify that the arrows on the
the mounting kit and ground is pole mounting kit are pointing pole mounting kit are pointing
between 1200 mm to 1600 mm. upwards. upwards.
If this is not feasible, clearance
● Tighten the nuts on the two ● Tighten the nuts on the two
specified in Clearance
bolts and ensure that the bolts and ensure that the
Requirements for Installing
clearance between the two clearance between the two
Modules at Multiple Layers is
sides of the mounting kit is sides of the mounting kit is
also acceptable.
the same. the same.

3.3.2 Installing Modules


1 PSU
Wall Channel Steel Angle Steel

Issue 01 (2022-04-30) Copyright © Huawei Digital Power Technologies Co., Ltd. 36


DPS Blade Distributed Power System (DPU90D,
DPU120D)
Installation Guide 3 System Installation (Side Mounting Scenario)

1 Lithium Battery (20 Ah/50 Ah)


1. Install the lithium battery onto the pole mounting kit. 2. Install the sun
shield on the other
Wall Channel Steel Angle Steel side of the lithium
battery.

NOTE
If a sun shield is
needed, install it at the
outer side of the lithium
battery.

1 Lithium Battery (100 Ah)


1. Install the lithium battery onto the pole mounting kit. 2. Install the sun
shield on the other
Wall Channel Steel Angle Steel side of the lithium
battery.

NOTE
If a sun shield is
needed, install it at the
outer side of the lithium
battery.
NOTE
When a lithium battery
is installed on a wall, it
is recommended that
the lithium battery be
installed less than or
equal to 1 m above the
ground.

Issue 01 (2022-04-30) Copyright © Huawei Digital Power Technologies Co., Ltd. 37


DPS Blade Distributed Power System (DPU90D,
DPU120D)
Installation Guide 4 Preparing Cables

4 Preparing Cables

CAUTION

● Do not connect aluminum cables to terminals directly to prevent


electrochemical corrosion of copper and aluminum.
● AC and DC power cables must be multi-core cables. Otherwise, water leakage
may occur on the waterproof connectors.

NOTE

● The requirements for cable colors and appearances vary depending on countries and
areas. Cables purchased at local markets must comply with local rules and regulations.
● Load cables and AC input power cables for PSUs need to be prepared onsite. Battery
cables (including terminals) between PSUs and lithium batteries are delivered with
products.
● Before connecting waterproof connectors to cables, ensure that the connections
between the cables and terminals are secure and reliable.

4.1 Preparing a DC Power Cable


Table 4-1 Cable requirements

Cable Type Core Cross- Outer DC Wiring Terminal


Sectional Area Diameter

DC (LOAD 4–8.2 mm2 9–14.5 mm


port, two (traditional
cores) round cable)
4–10 mm2 (new
D-shaped cable)

DC (BAT port, 10–25 mm2 12.6–25.5


two cores) mm

Issue 01 (2022-04-30) Copyright © Huawei Digital Power Technologies Co., Ltd. 38


DPS Blade Distributed Power System (DPU90D,
DPU120D)
Installation Guide 4 Preparing Cables

Preparing a Cable (≤ 6 mm2) and Connecting a Waterproof Connector

Preparing a Cable (> 6 mm2) and Connecting a Waterproof Connector

Issue 01 (2022-04-30) Copyright © Huawei Digital Power Technologies Co., Ltd. 39


DPS Blade Distributed Power System (DPU90D,
DPU120D)
Installation Guide 4 Preparing Cables

Installing a Ground Clip for a DC Load Cable

4.2 Preparing an AC Power Cable


Preparing a Three-Phase AC Power Cable (DPU90D)
NOTE

● The DPU90D-N15T1 supports 220 V three-phase four-wire AC input.


● The AC input power cable for the PSU needs to be prepared onsite. Before connecting
waterproof connectors to cables, ensure that the connections between the cables and
terminals are secure and reliable.

Table 4-2 Cable requirements


Cable Type Core Cross- Outer AC Wiring Terminal (Three-
Sectional Diameter Phase)
Area

AC input 6.0–16.0 mm2 11.5–25.5


power cable mm
(three-core)

Issue 01 (2022-04-30) Copyright © Huawei Digital Power Technologies Co., Ltd. 40


DPS Blade Distributed Power System (DPU90D,
DPU120D)
Installation Guide 4 Preparing Cables

Figure 4-1 Installing AC output power cables on the PSU

Preparing a Single-Phase or Dual-Live Wire AC Power Cable (DPU120D)


NOTE

● The DPU120D-N12A1 and DPU120D-N12A2 support 220 V single-phase three-wire AC


input or 110 V dual-live wire AC input.
● The AC input power cable and load cable for the PSU needs to be prepared onsite.
Before connecting waterproof connectors to cables, ensure that the connections
between the cables and terminals are secure and reliable.

Table 4-3 Cable requirements


Cable Type Core Cross- Outer AC Wiring Terminal (Single-
Sectional Diameter phase/Dual-Live Wire)
Area

AC input 4–16 mm2 11.5–25.5


power cable mm
(four-core)

Issue 01 (2022-04-30) Copyright © Huawei Digital Power Technologies Co., Ltd. 41


DPS Blade Distributed Power System (DPU90D,
DPU120D)
Installation Guide 4 Preparing Cables

Figure 4-2 Installing AC output power cables on the PSU

Issue 01 (2022-04-30) Copyright © Huawei Digital Power Technologies Co., Ltd. 42


DPS Blade Distributed Power System (DPU90D,
DPU120D)
Installation Guide 5 Installing Cables

5 Installing Cables

NOTE

The following uses a 20 Ah/50 Ah lithium battery as an example to describe how to install
cables. The installation method is the same for a 100 Ah lithium battery.

5.1 Installing Ground Cables


Installing Ground Cables (One PSU + One 20 Ah/50 Ah Lithium Battery)

Figure 5-1 Installing ground cables (one PSU and one 20 Ah/50 Ah lithium
battery)

5.2 Installing Communications Cables


Figure 5-2 Installing communications cables for lithium batteries

Issue 01 (2022-04-30) Copyright © Huawei Digital Power Technologies Co., Ltd. 43


DPS Blade Distributed Power System (DPU90D,
DPU120D)
Installation Guide 5 Installing Cables

5.3 Installing Power Cables

CAUTION

● Ensure that the upstream AC input circuit breakers are OFF, and attach warning
labels such as "Do not operate."
● Ensure that plugs and waterproof connectors are installed at all idle ports on
the modules.
● Ensure that cables are securely connected to terminals.

Figure 5-3 Wiring diagram of one PSU and two 20 Ah/50 Ah lithium batteries

Issue 01 (2022-04-30) Copyright © Huawei Digital Power Technologies Co., Ltd. 44


DPS Blade Distributed Power System (DPU90D,
DPU120D)
Installation Guide 5 Installing Cables

Figure 5-4 Wiring diagram of one PSU and four 20 Ah/50 Ah lithium batteries

Figure 5-5 Wiring diagram of two PSUs and four 20 Ah/50 Ah lithium batteries

Issue 01 (2022-04-30) Copyright © Huawei Digital Power Technologies Co., Ltd. 45


DPS Blade Distributed Power System (DPU90D,
DPU120D)
Installation Guide 5 Installing Cables

Figure 5-6 Wiring diagram of one PSU and one 100 Ah lithium battery

Figure 5-7 Wiring diagram of two PSUs and two 100 Ah lithium batteries

NOTE

● The PSU communicates with the NetEco by connecting to the RRU or BBU.
● If a BBU or RRU3xxx is deployed, monitoring alarms are preferentially reported over
RS485 ports (monitoring cable: 5 m).

Issue 01 (2022-04-30) Copyright © Huawei Digital Power Technologies Co., Ltd. 46


DPS Blade Distributed Power System (DPU90D,
DPU120D)
Installation Guide 5 Installing Cables

5.4 Connecting Loads


Connecting a PSU and a BBU (BBU3910 as an Example)
NOTE

When the NetEco is used and multiple PSUs are connected in parallel, only one PSU can be
connected to the MON0 or MON1 port on the BBU.

Figure 5-8 Connecting the PSU to the BBU3910

Connect a PSU and an RRU (RRU5502 as an Example)


NOTE

The PSU communicates with the RRU through the MBUS.

Figure 5-9 Connecting the PSU to the RRU5502

Connect a PSU and an RRU (RRU3936 as an Example)


NOTE

Connect the cable with label 1 to the EXT_ALM port on the RRU and that with label 2 to
the COM_ALM port on the PSU.

Issue 01 (2022-04-30) Copyright © Huawei Digital Power Technologies Co., Ltd. 47


DPS Blade Distributed Power System (DPU90D,
DPU120D)
Installation Guide 5 Installing Cables

Figure 5-10 Connecting the PSU to the RRU3936

Issue 01 (2022-04-30) Copyright © Huawei Digital Power Technologies Co., Ltd. 48


DPS Blade Distributed Power System (DPU90D,
DPU120D)
Installation Guide 6 Installing a Wireless Backhaul Module

6 Installing a Wireless Backhaul Module

Context
If a wireless backhaul module is required, perform the following steps to install it.

Procedure
Step 1 Install the SIM card of the wireless backhaul module.

Figure 6-1 Installing a SIM card

CAUTION

● If you hear two clicks when installing a wireless backhaul module, the module
is properly installed. If the module is not properly installed, water may enter it.
● If the SIM card needs to be replaced, replace the SIM card and assemble the
wireless backhaul module on the ground. Then install the backhaul module on
the PDU.

Step 2 Remove the screw cap and nut from the installation position of the wireless
backhaul module. Reserve the nut for future use.
Step 3 Install the waterproof cover, washer, nut, and backhaul module on the USB port in
sequence.

Issue 01 (2022-04-30) Copyright © Huawei Digital Power Technologies Co., Ltd. 49


DPS Blade Distributed Power System (DPU90D,
DPU120D)
Installation Guide 6 Installing a Wireless Backhaul Module

Figure 6-2 Installing the wireless backhaul module on the PSU

CAUTION

● If the protective cover is not installed, water may enter the port of the wireless
backhaul module.
● Ensure that the flat edges of the washer, waterproof cover, and USB terminal
are aligned.

Step 4 Secure the wireless backhaul module.

----End

Issue 01 (2022-04-30) Copyright © Huawei Digital Power Technologies Co., Ltd. 50


DPS Blade Distributed Power System (DPU90D,
DPU120D)
Installation Guide 7 Powering On the System

7 Powering On the System

7.1 Checking Before Power-On

7.1.1 Checking Hardware Installation


● All screws, especially those used for electrical connections, are tightened. Flat
washers and spring washers are all installed in correct sequence.

7.1.2 Checking Electrical Connections


● Batteries are properly installed and battery cables are correctly connected
without short circuits.
● The input and output power cables and ground cables are correctly connected
without short circuits.
● The ground bar of the device is securely connected to the site ground bar, and
the ground screws are secure.

7.1.3 Checking Cable Installation


● All cables are securely connected.
● All cables are arranged neatly and bound properly to their nearest cable ties
without distortion or excessive bending.
● The signal cables and power cables are bound separately.
● Cable labels are properly and securely attached in the same direction.

7.2 Connecting the AC Power Supply


After powering on the power system, observe indicators to determine the device
running status.

Prerequisites
The devices and cables have been installed.

Issue 01 (2022-04-30) Copyright © Huawei Digital Power Technologies Co., Ltd. 51


DPS Blade Distributed Power System (DPU90D,
DPU120D)
Installation Guide 7 Powering On the System

Context

NOTICE

The device must be powered on within 24 hours after being unpacked. During
maintenance, the power-off time cannot exceed 24 hours.

Figure 7-1 Power-on check

NOTE

When the device is running properly, the RUN indicator is steady on or blinking and the
ALM indicator is off.

Procedure
Step 1 Switch on the upstream AC input circuit breaker and measure the voltage of the
circuit breaker. The value should range from 85 V AC to 290 V AC (three-phase or
single-phase) based on the actual power supply.

Step 2 Check the PSU and lithium battery indicators. Ensure that the green indicator is
blinking slowly and that the red indicator is off.

Step 3 Use a multimeter to measure the DC output voltage of each load port. The value
should range from –42 V DC to –58 V DC. Note that the probe of the multimeter
must be insulated.

Step 4 Observe the power system for about 15 minutes. If no alarm indicator is on, the
system is running properly.

----End

7.3 Power-On Commissioning


For details about power-on commissioning, see the DPS Blade Power User Manual.

Issue 01 (2022-04-30) Copyright © Huawei Digital Power Technologies Co., Ltd. 52


DPS Blade Distributed Power System (DPU90D,
DPU120D)
Installation Guide A Hoisting a 100 Ah Lithium Battery

A Hoisting a 100 Ah Lithium Battery

This section describes the precautions and procedure for hoisting a 100 Ah lithium
battery onto a tower. The actual operations may vary. A lithium battery can be
installed on a pole, channel steel, or angle steel after being hoisted onto a tower.

Context
● If the tower or main pole is higher than 2 m and it is difficult for installation
personnel to carry a 100 Ah lithium battery onto the pole, lifting tools such as
a winch and pulley are recommended. Perform the following steps to install
the lithium battery.
– Use a winch to hoist a module onto a tower pole. Three persons are
required for module installation.
– Use a pulley to hoist a module onto a tower or rooftop pole. Four or five
persons are required for module installation.

Procedure
Step 1 Installation personnel A brings the 18 L pole mounting kit and hoisting tool to the
tower. Then, installation personnel A secures the fixed pulley to the support on the
tower platform, route the lifting sling through the pulley, and throws the two ends
of the sling to the bottom of the pole.

Step 2 Installation personnel A installs the 18 L pole mounting kit. For details, see 2
System Installation (Flush Mounting Scenario) or 3 System Installation (Side
Mounting Scenario) based on the actual application scenario.

Step 3 After installing the pole mounting kit, installation personnel B places foam pads or
paper sheets on the ground and places the lithium battery on them.

NOTICE

Do not stand a 100 Ah lithium battery upright on the ground because the
terminals at the bottom cannot support the weight of the lithium battery.

Step 4 After the pole mounting kit is installed, installation personnel B uses the lifting
sling to bind the upper handle of the 100 Ah lithium battery, ties a tight knot,

Issue 01 (2022-04-30) Copyright © Huawei Digital Power Technologies Co., Ltd. 53


DPS Blade Distributed Power System (DPU90D,
DPU120D)
Installation Guide A Hoisting a 100 Ah Lithium Battery

then uses the traction sling to bind the traction ring of the lithium battery and ties
a tight knot. Do not lift the lithium battery only by lifting the upper handle or
traction ring.

Figure A-1 Binding a 100 Ah lithium battery

(1) Lifting sling (2) Upper handle (3) Traction ring (4) Traction sling

Step 5 When lifting the 100 Ah lithium battery, ensure that the terminals at the bottom
are not bumped.

Figure A-2 Hoisting a lithium battery onto the pole

Issue 01 (2022-04-30) Copyright © Huawei Digital Power Technologies Co., Ltd. 54


DPS Blade Distributed Power System (DPU90D,
DPU120D)
Installation Guide A Hoisting a 100 Ah Lithium Battery

(1) Terminals at the bottom of the (2) Foam pads or paper sheets
lithium battery

Step 6 Hoist the 100 Ah lithium battery onto the tower.

WARNING

When installing a lithium battery on a tower, use a lifting sling and a fixed pulley
to securely bind the battery. To prevent personal injury caused by a falling lithium
battery, remove the lifting sling only after the battery is securely installed.

If... Then...

In the tower scenario, a winch is used Installation personnel C operates the


for hoisting. winch and installation personnel B
controls the traction sling to prevent
the lithium battery from colliding with
the tower, as shown in Figure A-3.

In the tower or rooftop scenario, Installation personnel C, D, and E pull


manual hoisting is used. the lifting sling downwards, and
installation personnel B controls the
traction sling to protect the lithium
battery from colliding with the pole, as
shown in Figure A-4.

Issue 01 (2022-04-30) Copyright © Huawei Digital Power Technologies Co., Ltd. 55


DPS Blade Distributed Power System (DPU90D,
DPU120D)
Installation Guide A Hoisting a 100 Ah Lithium Battery

Figure A-3 Hoisting a 100 Ah lithium battery on a tower pole (using a winch)

(1) Fixed pulley (2) Traction sling (3) Lifting sling (4) Winch

Issue 01 (2022-04-30) Copyright © Huawei Digital Power Technologies Co., Ltd. 56


DPS Blade Distributed Power System (DPU90D,
DPU120D)
Installation Guide A Hoisting a 100 Ah Lithium Battery

Figure A-4 Hoisting a 100 Ah lithium battery on a tower or rooftop pole (using a
pulley)

(1) Fixed pulley (2) Traction sling (3) Lifting sling

NOTICE

● The load-bearing capacity of the lifting sling and traction sling must be greater
than 200 kg and the sling diameter must be less than 25 mm.
● When hoisting a module onto a tower, protect it from colliding with the tower.
● Do not hoist a lithium battery mounted on a pole, angle steel, or channel steel
onto a tower.
● Do not use the traction eye to lift other objects.

Step 7 Installation personnel A catches the lithium battery hoisted onto the tower.

Step 8 Installation personnel A installs the lithium battery on the pole. For details, see 2
System Installation (Flush Mounting Scenario) or 3 System Installation (Side
Mounting Scenario).

Step 9 When the cramp ring on the lifting sling is close to the fixed pulley, installation
personnel A gently holds the lithium battery and installs it onto the 18 L pole
mounting kit with the conversion bracket at the rear. Remove the lifting sling and
traction sling.

----End

Issue 01 (2022-04-30) Copyright © Huawei Digital Power Technologies Co., Ltd. 57


DPS Blade Distributed Power System (DPU90D,
DPU120D)
Installation Guide B Preparing Terminals

B Preparing Terminals

Cut a cable of a proper length and install terminals.

Preparing a Cord End Terminal

Figure B-1 Preparing a cord end terminal

(1) Cable (2) Cord end terminal (3) Crimping tool

Preparing an OT Terminal

Figure B-2 Preparing an OT terminal

(1) Cable (2) OT terminal (3) Heat shrink tubing

(4) Hydraulic pliers (5) Heat gun

Issue 01 (2022-04-30) Copyright © Huawei Digital Power Technologies Co., Ltd. 58


DPS Blade Distributed Power System (DPU90D,
DPU120D)
Installation Guide B Preparing Terminals

Preparing a Copper-Aluminum Conversion Terminal

Figure B-3 Preparing a copper-aluminum conversion terminal

(1) Aluminum cable (2) Copper-aluminum terminal (3) Hydraulic pliers

(4) Insulation tape (5) Copper-aluminum terminal jacket

Issue 01 (2022-04-30) Copyright © Huawei Digital Power Technologies Co., Ltd. 59


DPS Blade Distributed Power System (DPU90D,
DPU120D)
Installation Guide C Adding DC Loads

C Adding DC Loads

Context
If a site is configured with a four-way connector, you can perform the following
steps to add DC loads.

Procedure
Step 1 Connect DC loads to the four-way connector.
Step 2 Connect the four-way connector to the PSU.

Figure C-1 Adding DC loads

NOTE

● Restricted by the load fuse of the PSU, the total DC load connected to the four-way
connector (04152542) cannot exceed the power that one load fuse can withstand.
● The DC output power cable connected to the four-way connector (04152542) must
meet the following requirements: 2.5–6 mm2 conductor and 11–15 mm cable outer
diameter.

----End

Issue 01 (2022-04-30) Copyright © Huawei Digital Power Technologies Co., Ltd. 60


DPS Blade Distributed Power System (DPU90D,
DPU120D)
Installation Guide D Acronyms and Abbreviations

D Acronyms and Abbreviations

B
BBU baseband unit
BMS battery management system

C
CE conducted emission
CS conducted susceptibility

D
DPU distributed power unit
DBU distributed battery unit

E
EFT electrical fast transient
EMC electromagnetic compatibility
EMI electromagnetic interference
EMS electromagnetic susceptibility
ESD electrostatic discharge
ESMU energy storage management unit

M
MTBF mean time between failures

N
NetEco Network Ecosystem

Issue 01 (2022-04-30) Copyright © Huawei Digital Power Technologies Co., Ltd. 61


DPS Blade Distributed Power System (DPU90D,
DPU120D)
Installation Guide D Acronyms and Abbreviations

R
RS radiated susceptibility
RRU remote radio unit

Issue 01 (2022-04-30) Copyright © Huawei Digital Power Technologies Co., Ltd. 62