Quotation of Civil Work For Construction of Drainage System
Quotation of Civil Work For Construction of Drainage System
Date: 05.07.2023
Sir,
We are submitting our quotation on account of construction work for the Drainage
System on a PO basis. Please Consider it and Let us know.
TOTAL WORK AREA: -
Total Drain Line in the Backside of the Factory [30’(L) x 5’(H)]
WORK DESCRIPTION: -
1. Drain cleaning
2. Earth cutting, Levelling, and Dressing
3. RCC column in 3 places
4. Tie beam to the base of the drain
5. Brickwork
6. Plaster
7. Centring
MATERIAL DESCRIPTION AND COST: -
DESCRIPTION COST
EARTH CUTTING AND CLEANING ₹ 3,000
DRAIN MAKING ₹ 7,700
TOTAL ₹ 10,700