The document provides details of isolated and combined footings for a structure. It includes a table with the footing designations, types, sizes, depths, reinforcement details and column ties. Footings F1 through F5 are listed as either isolated or combined footings with their dimensions and reinforcement bar spacing and locations. The document also includes a reference detail for the column lateral ties.

Uploaded by

usama2003113m
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
38 views1 page

PCIS All Drawing

The document provides details of isolated and combined footings for a structure. It includes a table with the footing designations, types, sizes, depths, reinforcement details and column ties. Footings F1 through F5 are listed as either isolated or combined footings with their dimensions and reinforcement bar spacing and locations. The document also includes a reference detail for the column lateral ties.

Uploaded by

usama2003113m
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

TYP.ISOLATED FOOTING F1,F2,F3,F4,F5 TYP.

COMBINED FOOTING F1,F2,F3,F4,F5

FOOTING DETAILS
RFT. DETAIL OF COLUMNS RFT. DETAIL OF COLUMNS
SI.NO. FOOTING FOOTING FOOTING FOOTING FOOTING RFT. DETAILS COLUMN COLUMN
DESIGNATION TYPE SIZE(BxL) DEPTH(D) LONGER (L) SHORTER (B) COLUMN LATERAL COLUMN LATERAL
TIES TIES
1. F1 ISOLATED 5'-0"x5'-0" 1'-3" S2-Y12-7" c/c(Bottom) S1-Y12-7" c/c(Top) S3 S4

2. F2 ISOLATED 6'-0"x6'-0" 1'-4" S1-Y12-6" c/c(Top) S2-Y12-6" c/c(Bottom) S1 S2


1'-6"
D

1'-6" S2
D

F3 S1
3. ISOLATED 7'-0"x7'-0" 1'-4" S1-Y12-5" c/c(Top) S2-Y12-5 " c/c(Bottom)
8"

8"

4. F4 ISOLATED 7'-6"x7'-6" 1'-5" S1-Y12-5" c/c(Top) S2-Y12-5" c/c(Bottom)


6" THK PCC 6" THK PCC
SECTION 1-1 SECTION 2-2
5. F5 ISOLATED 8'-0"x8'-0" 1'-6" S1-Y12-4" c/c(Top) S2-Y12-6 " c/c(Bottom) 1'-6"
2
BOTTOM LAYER 1
S1-Y12-7" c/c(Top) S2-Y12-7" c/c(Bottom)
6. CF1 COMBINED 7'-0"x7'-0" 1'-4" 1'-4"
TOP LAYER
S3-Y12-7" c/c(Top) S4 -Y12-7 " c/c(Bottom)

BOTTOM LAYER
S1-Y12-5" c/c(Top) S2-Y12-5" c/c(Bottom) S4
7. CF2 COMBINED 8'-6"x8'-6" 1'-5" 1'-5" S3
B

TOP LAYER
B

S3-Y12-6" c/c(Top) S4 -Y12-6 " c/c(Bottom)

BOTTOM LAYER S2 S2
S1-Y12-4" c/c(Top) S2-Y12-4" c/c(Bottom) S1
8. CF3 COMBINED 9'-0"x9'-0" 1'-6" 1'-6" S1
TOP LAYER
S3-Y12-5" c/c(Top) S4 -Y12-5 " c/c(Bottom)
L
L 2
1
COMBINED FOOTING CF1,CF2,CF3 (Rft Details)
FOOTING F1,F2,F3,F4,F5 (Rft Details)

Ref: Detail "AA"


R28-9"x1'-6" R28-9"x1'-6" R28-9"x1'-6" R28-9"x1'-6" R28-9"x1'-6" R28-9"x1'-6" R28-9"x1'-6" R28-9"x1'-6"
26
Floor Finish
R4b

R34a-9"x1'-3"
R40-9"x1'-6"
R47-9"x1'-6"

R37-9"x1'-6"
7' F3 7' F3 F2 F2 F2 7' F3 7' F3
6'

R32-9"x1'-6"
F2
R43-9"x1'-6"

5' F1 6' 6' 6'


R46-9"x1'-6"

R29-9"x1'-6"

14'-9"
R30-9"x1'-6"
R49-9"x1'-6"

"6-'1x"9-84R
3'-6"

3'-6"

3'-6"

3'-6"
2'-72 "

2'-712 "

2'-712 "
2'-6"

4 12"
1

1' 1' 412 " 412 " 412 " 1' 1'-3"
3'

R4b
R45-9"x1'-6"
412"

42"

412"

42"

42"

412"

412"

412"

412"

b4R
1

6'

26
5'

7'

7'

7'

7'
6'

6'

6'

C4 C7 C7 C2 C2 C4 C4 C7 C7
2'-112" R4b
3' 3' 3'
3'-6" 3'-6" 2'-712 " 3'-412" 3'-6" 3'-6"
GRADE BEAM DETAILS PU 25
Ld

R27-9"x1'-6"
14'-9"

R27-9"x1'-6" R27-9"x1'-6" R27-9"x1'-6"

"3-'1x"9-73R
2'-6"

4'
R25-9"x2'-0"
"6-'1x"9-34R

"3-'1x"9-13R
9" 9" 9" 9"
R45-9"x1'-6"

F2 F3 24
F2 6' 7' R25-9"x1'-6" R25-9"x1'-6"
6' F2 THICKNESS OF R25-9"x1'-6"
6' 3-Y12 5-Y12

5'-7 12"
3-Y10
1'-3"

2-Y10 WAIST SLAB (tw)


1'-0"
2'-7 12"

2'-0"
1'-6"

R30-9"x1'-6"
4 12"
4'-3"

412 " Y8-6"c/c Y8-6"c/c Y8-6"c/c


2'-7 "

Y8-6"c/c
1
2

1
F3 42" R4b
3'

9"
1'-0"

8' F5 7' F3 F3

R29-9"x1'-6"
412 "

412 "

6' 7' 7'


6'

7'

F2
6'

Detail: Ref GB1


42"

412"

25 3-Y10 23
R48-9"x1'-6"

2-Y10
1
6'

C2
R47-9"x1'-6"

3-Y12 5-Y12

R31-9"x1'-3"
C2 2" THK PCC
R49-9"x1'-6"

C5 2" THK PCC R24-9"x1'-6" R24-9"x1'-6" R24-9"x1'-6" R24-9"x1'-6"


3'-6"

3'-6"

3'-6"

4 12" 2" THK PCC 2" THK PCC R24-9"x1'-6"


4'

GB0 GB1 PCC-3" THK 27


1'-3" TYPICAL DETAILS
3'

3'

1' 1' 3' 1' GB2 GB3 R4b


R45-9"x1'-6"
"6-'1x"9-64R

7'-9"
3'-6"
42 "

412 "

42 "

3'
42 "

412 "

R44-9"x1'-3"

3'
6'

8'

7'

7'

7'

24
REINF. DIA. & SPACING
C3 C7 C7 F1 F1 C7 C7 T12 AT 5" C/C
4'

5'-7 12"

5' F1 5' 5' F1 5' F1 I Layer I Layer I Layer


Ld

12'-4 2"

I Layer I Layer
1

3'-421" 421" STAIRCASE TOE BEAM DETAILS R4b 22


2'-6"

2'-6"

2'-6"

2'-6"

4' 6" 6" 6" 3'-6" 3'-6"


1'-6"

3'-6" 6" 0.25 0.25 0.25 0.25 A2 0.25 0.25 0.25 0.25 0.25 0.25
Expansion joint 25mm Gap
R23-9"x1'-6" R23-9"x1'-6" Ld 1 1 2
Ld Ld 1 1 2 2
Ld Ld 1
A
1
Ld
5'

5'

5'

5'

23 A

5'-412"
5'

R45-9"x1'-6"

C8 C8 C8 C8 C8

R29-9"x1'-6"
2'-6"

R30-9"x1'-6"
R31-9"x1'-3"
(B) (A) (B)

II Layer II Layer II Layer II Layer


R44-9"x1'-3"

F2 II Layer II Layer II Layer


7'-9"

2'-712 " 2'-6" 2'-6" 2'-6" 6' F2 6' GB2 GB2 GB2 GB2 GB2 GB2 GB2 21 (B) (A) (B)

F1 5' R22-9"x1'-6"
(B) (A) (B) (B) (A) (B) (B) (B) (B)

3'-3"
"6-'1x"9-94R

26 CANTILEVER BEAM R22-9"x1'-6" R22-9"x1'-6" CANTILEVER BEAM II Layer


2'-6"

3" 412"
CANTILEVER BEAM
I Layer
3'

3'

9" 20 II Layer II Layer II Layer II Layer


712 "

412"

412"

A I Layer I Layer
6'

I Layer I Layer A
5'

22 R21-9"x1'-6" R21-9"x1'-6" A
CF2 CF2 GB0 GB1 R21-9"x1'-6"

5'-4 12"
CF1 8'-6" C1 C2 C2 GB1
8'-6" 2'-6" 3'-412 "
5'-412"

7' 1
GB1
GB1 R4b 0.1 1 0.15 1 0.15 2 0.1 2 0.1 1 0.1 1 0.1 2 0.1 2 0.1 1 0.1 1
4 12" 42" Effective Span Ld Effective Span
14'-9"
2'-7 12 "

2'-7 12 "

1' Effective Span 2


1'-10 2"

1
3'
1

1' C7 C6 1
GB2 GB2 GB1 19 Effective Span Effective Span
R47-9"x1'-6"

GB2 1 2
421"

421"

421"

C2
412 "

C1 21 R20-9"x1'-6"
R48-9"x1'-6"

R46-9"x1'-6"

GB2 GB2 GB2 GB0 R20-9"x1'-6"


R45-9"x1'-6"
8'-6"

8'-6"

3'-3"

TYP. BEAM DETAILS FOR CONTINUOUS BEAMS


3'-3"

3'-3"

3'-3"

1
4 2" 412"
7'

1' C6 1' GB0


R49-9"x1'-6"

R4b
R44-9"x1'-3"

TYPICAL BEAM DETAILS FOR DEFFRENT DEPTH AT BEAMS TYPICAL BEAM DETAILS FOR DISCONTINUOUS BEAMS
412 "

412 "

412 "

412 "

R29-9"x1'-6"
C1 20
1'-10 2 "

C2

R30-9"x1'-6"
1

6' F2 A & B - SPACING OF STIRRUPS


2'-712 "

2'-712 "

F1 5' 6'
R31-9"x1'-3"

F2

13'-4 12 "
C7 1 1
5'-421"

1'-42 " 6'-4 2 " 9"


GB1 Reinforcements GROUND FLOOR ROOF BEAM DETAILS
4'-3" NGL +0'-6" GB0 25 R4b I Layer
Cantilever Beam
need to be kinked I Layer
2'-6"

Reinforcements I Layer
6"

PU
3" 412"
3'

3'

9" GB1 GB1 I Layer Minimum two bars 0.5 Ld I Layer


GB2 Main Beam
712"

412 "

412 "

should not be bent Ld A 0.25 0.25 A in order to maintain


4'

spacer bar 1
6'

GB1 1 0.5 Ld
5'

19 CANTILEVER BEAM

C1 C2 C2 GB2 GB2 GB2 GB2 GB2


24
cover Ld C1 C3 C4 C8 C 10 C12 C13 C 16 C 17 C19 C 22 C 24

2'-6" 3'-412 " 18 3-Y12(thro) 3-Y12(thro) 3-Y12(thro) 3-Y12(thro) 3-Y12(thro) 3-Y12(thro) 3-Y12(thro) 3-Y12(thro) 3-Y12(thro) 3-Y12(thro) 3-Y12(thro) 3-Y12(thro) 3-Y12(thro) 3-Y12(thro) 3-Y12(thro) 3-Y12(thro) 3-Y12(thro) 3-Y12(thro)
GB1 GB1 II Layer 1st Layer 2nd Layer
1st Layer 2nd Layer 1st Layer 2nd Layer 1st Layer 2nd Layer 1st Layer 2nd Layer 1st Layer 2nd Layer 1st Layer 2nd Layer 1st Layer 2nd Layer 1st Layer 2nd Layer

3' II Layer II Layer II Layer


5'-712 "

712 "
1 1 1
(B) 13'-9"(8Y-4"c/c) 10'-12"(8Y-4"c/c) 13'-3"(8Y-6"c/c) 13'-3"(8Y-4"c/c) 11'-12 "(8Y-4"c/c) 13'-3"(8Y-6"c/c) 13'-3"(8Y-6"c/c) 13'-3"(8Y-6"c/c) 13'-3"(8Y-6"c/c) 12'-72 "(8Y-6"c/c)
GB1 17 (A) (A) (B) (B) (B) (A) (B) II Layer
R18-9"x1'-6" R18-9"x1'-6"
1
1'-22"(8Y-6"c/c)
R18-9"x1'-6"
13'-4 12"

GB0 R19-9"x1'-6" R19-9"x1'-6" (A) (B) 3-Y12 (thro)


1st Layer
3-Y12(thro)
2nd Layer
3-Y12 (thro)
1st Layer
3-Y12(thro)
2nd Layer
3-Y12 (thro)
1st Layer
3-Y12(thro)
2nd Layer
3-Y12 (thro) 3-Y12(thro) 3-Y12 (thro)
1st Layer
3-Y12(thro)
2nd Layer
3-Y12 (thro)
1st Layer
3-Y12(thro)
2nd Layer
3-Y12 (thro)
1st Layer
3-Y12(thro)
2nd Layer
3-Y12 (thro)
1st Layer
3-Y12(thro)
2nd Layer
3-Y12 (thro)
1st Layer
3-Y12(thro)
2nd Layer
3-Y12 (thro)
1st Layer
3-Y12(thro)
2nd Layer

GB-Grade Beam
1st Layer 2nd Layer

14'-6" 10'-1012 " 14' 14' 11'-10 12" 1'-6 12" 14' 14' 14' 14' 13'-412 "
CF2 23 R4b I Layer A A 9"x1'-6" 9"x1'-6" 9"x1'-6"
LS OF ROOF BEAM -R29,R30
9"x1'-6" 9"x1'-6" 9"x1'-6" 9"x1'-6" 9"x1'-6" 9"x1'-6" 9"x1'-6" 9"x1'-6"
7'-6" 8'-6" TYPICAL BEAM I Layer II Layer Secondary Beam LS OF ROOF BEAM -R29,R30
R30-9"x1'-6"

7' F4 GB2 GB1 GB1 0.1 II Layer 0.1 I Layer

R29-9"x1'-6"
F3 F1 5' F2 GB1 GB1 GB1 GB1 GB1
1
I Layer 1
Effective Span D12 D13 D16 D 17 D 19 D22 D 23
6' GB1
R31-9"x1'-3"

6' F2
R48-9"x1'-6"

R45-9"x1'-6"

R44-9"x1'-3"

GB0 GB2 CROSS SECTION Effective Span 3-Y16(thro) 3-Y16(thro) 3-Y16(thro) 3-Y16(thro) 3-Y16(thro) 3-Y16(thro) 3-Y16(thro) 3-Y16(thro) 3-Y16(thro)
7'-9"

0.15
3'-6"

3'-9"

3'-9"

C6 GB2
4'-3"

R49-9"x1'-6"

R47-9"x1'-6"

R46-9"x1'-6"

1st Layer 1st Layer 1st Layer 1st Layer 1st Layer 1st Layer 1st Layer 1st Layer 1st Layer

GB2

14'
1
4 12" 1' 1' 42"
1
18 R4b Effective Span Effective Span Effective Span 1 1 1 1
2'-6"

1 3'(8Y-7"c/c) 11'-1 2"(8Y-7"c/c) 6'-12"(8Y-7"c/c) 7'(8Y-7"c/c) 10'-02 "(8Y-7"c/c) 12'-6"(8Y-7"c/c) 12'-9"(8Y-7"c/c) 12'-9"(8Y-7"c/c) 12'-9"(8Y-7"c/c) 6'-72"(8Y-7"c/c) 8'-9"(8Y-7"c/c)
3" 412" 2
3'

3'

9" TYPICAL BEAM DETAILS FOR


8'-6"

712 "
421"

421"

421"

1'-1"(8Y-7"c/c) 3-Y16 (thro) 3-Y16 (thro)


7'

712 "

712 "

3-Y16 (thro) 3-Y16 (thro) 3-Y16 (thro) 3-Y16 (thro) 3-Y16 (thro) 3-Y16 (thro) 3-Y16 (thro)
421"

421"

GB2
6'

1st Layer 1st Layer 1st Layer 1st Layer 1st Layer 1st Layer 1st Layer 1st Layer 1st Layer
5'

17 GB1 TYPICAL BEAM DETAILS FOR TYPICAL MAIN & SECONDARY GROUND FLOOR ROOF BEAM DETAILS
C3 C7 C2
C2 22 CANTILEVER BEAMS TYPICAL BEAM DETAILS FOR CONTINUOUS/ DISCONTINUOUS BEAMS 3'-9" 11'-10 12" 6'-1012" 7'-9" 11'-012 " 2'-7" 13'-9" 14' 14' 14' 7'-9" 9'-7 12"
C1 C2 B1 C1 E1 J1 M1 R1 U1 V1 X1
9"x1'-3" 9"x1'-3" 9"x1'-3" 9"x1'-3" 9"x1'-3" 9"x1'-3" 9"x1'-3" 9"x1'-3" 9"x1'-3"
1'-412 " 6'-4 12 " 9" 2'-6" 3'-4 12 "
Expansion joint 25mm Gap
GB2 R4b SIMPLY SUPPORTED BEAMS WITH CANTILEVER BEAM BEAM JUNCTION 3-Y16 (cut)
2nd Layer
3-Y16 (thro)
3-Y16 (cut)
2nd Layer
3-Y16 (thro)
2-Y12 (cut)
2nd Layer
3-Y16 (thro)
2-Y12 (cut)
2nd Layer
3-Y16 (thro)
2-Y12 (cut)
2nd Layer
3-Y16 (thro)
2-Y12 (cut)
2nd Layer
3-Y16 (thro)
3-Y16 (cut)
2nd Layer
3-Y16 (thro)
3-Y16 (cut)
2nd Layer
3-Y16 (thro)
9"x1'-3"
LS OF ROOF BEAM -R31
9"x1'-3" 9"x1'-3"

GB0
5'-4 12"

1st Layer 5'-3" 3'-3" 1st Layer 2'-9" 2'-9" 1st Layer 2'-9" 2'-9" 1st Layer 2'-9" 2'-9" 1st Layer 2'-9" 2'-9" 1st Layer 2'-9" 4' 1st Layer 4' 2'-9" 1st Layer
LS OF ROOF BEAM -R31
3'
3'-10 12 " 3'-9" 3' CANTILEVER BEAM 1 1
16'-6"(8Y-6"c/c) 12'-72 "(8Y-6"c/c) 12'-6"(8Y-6"c/c) 12'-6"(8Y-6"c/c) 12'-6"(8Y-6"c/c) 11'-10 2"(8Y-6"c/c) 16'-6"(8Y-6"c/c) 7'-9"(8Y-6"c/c)
CANTILEVER BEAM 16 2'
E25 E26 S25 S26 E1 E2 E5 E9 F10 F12
R17-9"x1'-6"

4'-112 "
2' 2' 2' 2'
GB2 GB2 R17-9"x1'-6" 1'-9"
3-Y16 (thro) 3-Y16 (cut)
2' 2'
3-Y16 (thro) 2-Y12 (cut)
2'
3-Y16 (thro) 2-Y12 (cut)
2'
3-Y16 (thro) 2-Y12 (cut)
2'
3-Y16 (thro) 2-Y12 (cut) 3-Y16 (thro)
2'
3-Y16 (thro) 3-Y16 (cut) 3-Y16 (thro) 3-Y16 (thro) 3-Y16 (thro) 3-Y16 (thro) 3-Y16 (thro) 3-Y16 (thro) 3-Y16 (thro) 3-Y16 (thro)
R44-9"x1'-3"

3-Y16 (cut) 3-Y16 (cut)


"6-'1x"9-54R

2nd Layer

21
1st Layer 2nd Layer 1st Layer 2nd Layer 1st Layer 2nd Layer 1st Layer 2nd Layer 1st Layer 2nd Layer 1st Layer 1st Layer 1st Layer
14'

1st Layer 1st Layer 1st Layer 1st Layer 1st Layer 1st Layer 1st Layer
2nd Layer 2nd Layer

R16-9"x1'-6"
"6-'1x"9-74R

GB2 GB2 R16-9"x1'-6" R16-9"x2'-0" SLAB CURTAILMENT DETAILS 14'-112" 13'-712 "
3'-3"

18' 14' 14' 14' 18'-3" 9'-6"


GB1
R31-9"x1'-3"

GB1 GB1 GB1 9"x1'-6" 9"x1'-6" 9"x1'-6" 9"x1'-6" 9"x1'-6" 9"x1'-6" 9"x1'-6" 9"x1'-6" 13'-3"(8Y-6"c/c) 8'-3"(8Y-6"c/c) 13'-3"(8Y-6"c/c) 9'-3"(8Y-6"c/c) 16'-9"(8Y-4"c/c) 16'-6"(8Y-6"c/c) 9'(8Y-6"c/c)

GB2 GB1
R30-9"x1'-6"

LS OF ROOF BEAM -R1


GB2 GB2 GB2 15
F1 6' F2 L1
3'-3"
3-Y16 (thro) 3-Y16 (thro) 3-Y16 (thro) 3-Y16 (thro) 3-Y16 (cut) 3-Y16 (thro) 3-Y16 (cut)
F2 6' 3-Y16 (thro) 3-Y16 (thro)
R29-9"x1'-6"

5' 20 E2 J2 M2 R2 U3 V3 X3
1st Layer 1st Layer 1st Layer
1st Layer
1st Layer 2nd Layer 1st Layer 2nd Layer
1st Layer

R15-9"x1'-6" R15-9"x2'-0" R15-9"x1'-6" 14'-9" 9'-412 " 14'-9" 10' 17'-10 12" 18' 10'-6"
5'-412 "

3-Y12 (thro) 3-Y12 (thro) 3-Y12 (thro) 3-Y12 (thro) 9"x1'-6" 9"x1'-6" 9"x1'-6" 9"x1'-6" 9"x1'-6" 9"x1'-6" 9"x1'-6"
14 3-Y20(thro) 3-Y20 (thro) LS OF ROOF BEAM -R37,R43
2'-6"

2'-6" 2-Y12 (cut) 2-Y12 (cut) 2-Y12 (cut) LS OF ROOF BEAM -R32,R40
2'-6"
R44-9"x1'-3"

412"
1st Layer 1st Layer 1st Layer 1st Layer 1st Layer 1st Layer
LS OF ROOF BEAM -R34,R35,R39,R41
3"
3'

3'

2nd Layer 2nd Layer 2nd Layer


3-Y12 (thro)
9"
R45-9"x1'-6"

1st Layer

ROOF FINISH/W.COARSE LS OF ROOF BEAM -R33,R36,R38,R42


721"

GB0
1 1 1 1

CF2 CF2
412"

412"

11'-3"(8Y-6"c/c) 13'-12 "(8Y-6"c/c) 11'-102 "(8Y-6"c/c) 11'-10 2"(8Y-6"c/c) 12'-12 "(8Y-6"c/c) 16'-6"(8Y-4"c/c) 7'-9"(8Y-4"c/c) NOTES:
6'
5'

16
Expansion joint 25mm Gap
4'-112"(8Y-7"c/c)
CF1 7' 8'-6" 8'-6"
6'-7 12"

1'-6" 2-Y12 (cut) 2-Y12 (cut) 2-Y12 (cut) 1'-6"


NOTES: 1.ALL DIMENSIONS AND LEVELS ARE IN MILLI METERS &
C2
4'-112 "

C1 C2 19 R4b
3-Y12 (thro) 3-Y12 (thro) 2nd Layer 3-Y12 (thro) 2nd Layer 2nd Layer 3-Y12 (thro) 3-Y12 (thro)
3-Y20(cut)
3-Y20 (cut)
4'-1012" X14 X14 X14 X14 X14 X14 X 14 P23 METERS.
3'-412 "
1st Layer 1st Layer 1st Layer 1st Layer 1st Layer 1st Layer

4 12" 421" 2'-6"


5
1st Layer
1. ALL DIMENSIONS AND LEVELS ARE IN MILLI METERS &
2'-72 "

2'-712 "

9"x1'-3" 2. CONTRACTOR TO PHYSICALLY VERIFY SITE CONDITIONS


1'-10 12 "

C61' C61' GB2 ROOF BEAM 12'-9" 15'-3" 14' 14' 13'-6" Secondary Beam
1

18'-3" 9'-6"
GB2 R14a-9"x1'-6" 9"x1'-6" 9"x1'-6" 9"x1'-6" 9"x1'-6" 9"x2'-0" 9"x1'-6" LS OF ROOF BEAM -R4b 3-Y16(thro)
"AA"
3-Y16(thro)
"AA" "AA"
3-Y16(thro) "AA" 3-Y16(thro) 3-Y16(thro) 3-Y16(thro) 3-Y16(thro) 3-Y16(cut) 3-Y16(thro) 3-Y16(cut) 3-Y16(thro) METERS. STAIRCASE-1 REBAR SCHEDULE BEFORE COMMENCEMENT OF WORK & CONFIRM WITH
R14a-9"x1'-6"
1st Layer 1st Layer 1st Layer 1st Layer 1st Layer 1st Layer 1st Layer 1st Layer 1st Layer
LS OF ROOF BEAM -R3,R13 2nd Layer 2nd Layer
412"

412"

412"

3'
R48-9"x1'-6"

C2 2. CONTRACTOR TO PHYSICALLY VERIFY SITE CONDITIONS THE OWNER'S REPRESENTATIVE. ANY DISCREPANCY TO
4"

GB0
R47-9"x1'-6"

LS OF ROOF BEAM -R2


C1 15 GB2 4 2-Y16+1-Y12 (thro) 2-Y16+1-Y12 (thro) 2-Y16+1-Y12 (thro) 2-Y16+1-Y12 (thro) 2-Y16+1-Y12 (thro) STAIRCASE-1 REBAR SCHEDULE
1
2

GB2
2'-112 "

13
1
BEFORE COMMENCEMENT OF WORK & CONFIRM WITH BE BROUGHT TO THE NOTICE OF THE ENGINEER.
GB2 GB2 7'-6"(8Y-7"c/c) 8'-3"(8Y-7"c/c) 9'(8Y-7"c/c) 7'(8Y-7"c/c) 9'-02"(8Y-7"c/c) 7'-6"(8Y-7"c/c) 17'-3"(8Y-6"c/c) 17'-3"(8Y-6"c/c) 11'-9"(8Y-7"c/c)
R46-9"x1'-6"

1st Layer
1st Layer 1st Layer 1st Layer 1st Layer
8'-6"

8'-6"

3'-3"

1 2'-612"(8Y-7"c/c)
2'-62"(8Y-7"c/c) THE OWNER'S REPRESENTATIVE. ANY DISCREPANCY TO
3'-3"

3'-3"

3'-3"

4 12" R14-9"x1'-6" R14-9"x1'-6" R14-9"x1'-6" R14-9"x1'-6" R14-9"x1'-6" B3 C3 B8 C8 3. ALL LEVELS TO BE CONFIRMED BY THE CONTRACTOR
7'

1' 1'
R49-9"x1'-6"

CANTILEVER SLAB
1 MAIN REINFT.
C6 2" R4b CANTILEVER BEAM 9" BW 3-Y16 (cut) 3-Y16 (cut)
2nd Layer
3-Y16 (cut) 3-Y16 (cut)
2nd Layer
3-Y16 (thro)
1st Layer
3-Y16 (thro) 12'-712"(8Y-7"c/c) 13'-3"(8Y-7"c/c) 13'-3"(8Y-7"c/c) 13'-3"(8Y-7"c/c) 6'-1012"(8Y-7"c/c) 3-Y16(thro) 3-Y16(thro) 3-Y16(thro) 3-Y16(thro) 3-Y16(thro) 3-Y16(thro) 3-Y16(thro) 3-Y16(cut) 3-Y16(thro) 3-Y16(cut) 3-Y16(cut) 3-Y16(thro) BE BROUGHT TO THE NOTICE OF THE ENGINEER. THICKNESS DISTRIBUTION BEFORE COMMENCEMENTOF WORKS WITH RESPECT TO
12
2nd Layer 2nd Layer 2nd Layer 1st Layer 1st Layer 1st Layer 1st Layer 1st Layer 1st Layer 2nd Layer 1st Layer 2nd Layer 2nd Layer 1st Layer

GB2
13'-4 12"

3-Y16 (thro) 3-Y16 (thro) 1st Layer


4 "4
4 12"

4 12"

4 12"

3'-3" 3'-3" Cantilever Beam


8'-1 12" 10'-612" 8'-1021" MAIN REINFT. 3. ALL LEVELS TO BE CONFIRMED BY THE CONTRACTOR EXISTING ROADS/BUILDINGS. APPROVAL IN WRITING
1
2

1st Layer 1st Layer


8'-3" 5'-9" 3'-3" 9'-9" 3'-9" 18'-6" 18'-6" 3'-9"
C2 C1 14 GB1 GB1
3'-3" 3'-3"
12'-1012 "
1'-1021"

GB1 "6-'1x"9-41R R14-9"x1'-6" R14-9"x1'-6" 12'-712"(8Y-4"c/c)


13'-4 " 1
14' 14' 13'-11" 7'-8 "1 9"x1'-6" 9"x1'-6" 9"x1'-6" 9"x1'-6" THICKNESS DISTRIBUTION BEFORE COMMENCEMENTOF WORKS WITH RESPECT TO TYPE (TW) (S1) (S2) REINFT. (S3) FROM THE ENGINEER-IN-CHARGE.
2'-7 2"

2'-7 12"

2 2 9"x1'-6" 9"x1'-6" 9"x1'-6" 9"x1'-6" 9"x1'-6"


1

16'(8Y-6"c/c) 16'-6"(8Y-6"c/c) 9"x1'-6" 9"x1'-6" 9"x1'-6" "AA" EXISTING ROADS/BUILDINGS. APPROVAL IN WRITING
R45-9"x1'-6"

R41-9"x1'-6"

R34-9"x1'-6"

13'-421" 9"x1'-3" 9"x1'-3" LS OF ROOF BEAM -R4c 9"x1'-3" 9"x1'-3" 9"x1'-3" 4. GRADE OF CONCRETE SHALL BE MADE M30, STEEL OF
R44-9"x1'-6"

R30-9"x1'-6"

C6
R31-9"x1'-3"

1'-412 " 6'-4 12 " 8'-6" TYPE (TW) REINFT. (S3)


R35-9"x1'-6"

9" FROM THE ENGINEER-IN-CHARGE.


R39-9"x1'-6"

R29-9"x1'-6"

LINTEL 6" THICK 9"x1'-6" LS OF ROOF BEAM -R44


3'-10 12" 7' 1'-9" 1'-9" 1'-9" 3-Y16 (thro) 3-Y16 (thro) (S1) (S2) GRADE Fe-500.
6'-7 12"

PU
4'-3" CF1 3-Y16 (thro) 3-Y16 (cut) 1'-9" 3-Y16 (thro) 3-Y16 (cut) LS OF ROOF BEAM -R4a 1st Layer
2nd Layer
4. GRADE OF CONCRETE SHALL BE MADE M30, STEEL OF A1 A2 5. USE PPC CEMENT CONFORMING TO IS:1489 AND STEEL
CF2
1st Layer 2nd Layer 1st Layer 2nd Layer

R4b GRADE Fe-500. 165 Y12 AT 100 C/C Y12 AT 150 C/C Y10 AT 150 C/C
GB0 CONFORMING TO IS:1786
10'

12'-712"(8Y-4"c/c)
F2 6' F2 6' Y10-6" c/c 17'-9" 18' X1 X3 X6 X7 X11 X14 X15 X17 X20
2'-812 " 2'-1 12 " 3'-212 "

9"x1'-6" 9"x1'-6" A1 A2 150 Y12 AT 120 C/C Y12 AT 150 C/C Y10 AT 150 C/C 5. USE PPC CEMENT CONFORMING TO IS:1489 AND STEEL
2'-5 2 " 2'-1 12 " 2'-5 12 "

5' 5' 5' 3" 1


42" Y12-6"c/c 4 - Y12 13'-412 " 6. CLEAR COVER:SLABS-20mm; BEAMS-25mm;
F1 F1 F1 9" 18 LS OF ROOF BEAM -R4 LS OF ROOF BEAM -R5 9"x1'-6" 3-Y16(thro) 3-Y16(thro) 3-Y16(thro) 3-Y16(thro) 3-Y16(thro) 3-Y16(thro) 3-Y16(thro) 3-Y16(thro) 3-Y16(thro) 3-Y16(thro) 3-Y16(thro) 3-Y16(thro)
CONFORMING TO IS:1786
A2 A3 165 Y10 AT 150 C/C
COLUMNS-40mm; FOOTINGS-50mm.
412 " 412 "

412 " 412 "

GB2 GB2 GB2 GB2 GB1


1st Layer 1st Layer 1st Layer 1st Layer 1st Layer
LS OF ROOF BEAM -R4a 1st Layer 2nd Layer 2nd Layer 2nd Layer 2nd Layer 2nd Layer 2nd Layer
6. CLEAR COVER:SLABS-20mm; BEAMS-25mm; Y12 AT 100 C/C Y12 AT 150 C/C
1'-10 12"

U3 V3 X3 B 16 C16 D 16
412 " 412"

C2 C2 7. DEVELOPMENT LENGTH SHALL BE 50 TIMES DIA OF


2'-112 "

2'-112 "

2'-112 "

1 1 1 1 C1 412" 13 E5 J5 M5 R5
8'-6"

42" 42" 412" 6" 3-Y16 (cut) 150 COLUMNS-40mm; FOOTINGS-50mm.


3'

42 "
3'

4 2"
72"

3" THK 3-Y16 (cut) 13'-9"(8Y-4"c/c) 18'(8Y-4"c/c) 17'-912 "(8Y-4"c/c) 18'-212"(8Y-4"c/c) 18'(8Y-4"c/c) 18'(8Y-4"c/c)
A2 A3 REINFORCEMENT.
3" 9" Y12 AT 150 C/C Y10 AT 150 C/C
7'

2nd Layer

17 3-Y20(thro) 3-Y20 (thro) 2nd Layer


3-Y16 (thro) 3-Y16 (thro) 2'-6"(8Y-4"c/c) 2'-6"(8Y-4"c/c) 2'-3"(8Y-4"c/c) Y12 AT 120 C/C 7. DEVELOPMENT LENGTH SHALL BE 50 TIMES DIA OF
11 3-Y16 (thro) 3-Y16 (thro) 3-Y16 (thro) 3-Y16 (thro) 3-Y16 (thro)
412 "

412 "

42 "

412 "

1st Layer 1st Layer


3'-3" 1st Layer 3'-3" 1st Layer
8. FRAME IS ANALYSED USING IS:1893-2000, IS:875-1987 &
6'

6'

1st Layer 1st Layer 1st Layer 1st Layer 1st Layer
412"

C2 12
1

REINFORCEMENT.
C1 C2 GB2 2'-0" 3-Y16 (thro) 3-Y16(thro) 3-Y16 (thro) 3-Y16(thro) 3-Y16 (thro) 3-Y16(thro) 3-Y16 (thro) 3-Y16(thro) 3-Y16 (thro) 3-Y16(thro) 3-Y16 (thro) 3-Y16(thro) DESIGNED BY IS:456-2002.
5'

5'

5'

1'-3"

16'-6"(8Y-4"c/c) 7'-9"(8Y-4"c/c) 16'-6"(8Y-6"c/c) 5'(8Y-6"c/c)


1st Layer 2nd Layer 1st Layer 2nd Layer 1st Layer 2nd Layer 1st Layer 2nd Layer 1st Layer 2nd Layer 1st Layer 2nd Layer
1

1 1
6'-10 2"(8Y-7"c/c) 13'-3"(8Y-7"c/c) 13'-3"(8Y-7"c/c) 13'-3"(8Y-7"c/c) 6'-102 "(8Y-7"c/c) 8. FRAME IS ANALYSED USING IS:1893-2000, IS:875-1987 & 9. PILE FOUNDATION IS ADOPTED AS PER SOIL REPORT
C2 C2 C2 C2 C2 R13-9"x1'-6" R13-9"x2'-0" 10 14'-6" 18'-9" 3'-3" 18'-612 " 18'-11 12" 3'-3" 18'-9" 18'-9" 2'-721" DESIGNED BY IS:456-2002.
1012 " 5'-1012 " GB0 1'-9" 1'-9" 9"x1'-6" 9"x1'-6" 9"x1'-6" 9"x1'-6" 9"x1'-6" 9"x1'-6" 9"x1'-6" 9"x1'-6" 9"x1'-6" AND IT IS DESIGNED FOR G+4 FLOORS
R45-9"x1'-6"

1'-9" WINDOW 3-Y16 (thro) 3-Y16 (thro) 3-Y16 (thro) 3-Y16 (thro) 3-Y16 (thro) 3-Y20(cut)
3-Y20 (cut) 3-Y16 (thro) 3-Y16 (cut) 3-Y16 (thro) LS OF ROOF BEAM -R45,R47,R49 9. PILE FOUNDATION IS ADOPTED AS PER SOIL REPORT
2'-6" 2'-6" R12-9"x1'-6"
1st Layer 2nd Layer

R12-9"x1'-6" R12-9"x1'-6" R12-9"x1'-6"


1st Layer 1st Layer 1st Layer
2'-6" 3'-6" R12-9"x1'-6"
1st Layer 1st Layer 1st Layer 1st Layer
1st Layer
AND IT IS DESIGNED FOR G+2 FLOORS
3'-421" 2'-712 " R4b R11-9"x1'-6" 7'-7 12" 14' 14' 14' 7'-721" 18'-3"
9"x2'-0"
9'-6"
9"x1'-6"
18' 6'-1 12" X 21 X24 X26
CF2 9"x1'-6" 9"x1'-6" 9"x1'-6" 9"x1'-6" 9"x1'-6" 9"x1'-6" ROOF LEVEL
10'

9"x1'-6" LS OF ROOF BEAM -R3,R7,R8,R13


7'-6" F4 8'-6"
7'-9"
R47-9"x1'-6"

LS OF ROOF BEAM -R9,R14a,R17,R19,R20,R23 2'-6"


F2
R31

LS OF ROOF BEAM -R6,R10 3-Y16(thro) 3-Y16(thro)


R48-9"x1'-6"

3-Y16(thro) 3-Y16(thro)
6' LB-9"x1'-3" S3
GB1
14'

1st Layer 1st Layer

GB1 GB1 ROOF LEVEL


2nd Layer 2nd Layer

5' GB2
R44-9"x1'-6"

R30-9"x1'-6"

R29-9"x1'-6"

F3 GB2 GB2 GB2 GB2


3.66 2'-6"
5' 5' 5'
R46-9"x1'-6"

F1 F1 F1 18'(8Y-4"c/c)
S3
3'-721"

18'(8Y-4"c/c)
3'-9"

CF2 F1 1
2'-10 2" 7' F2 6' F10 H10 N10 Q10 T10
T14 U14 V14 X14
S2
4 12" 1' 1' NOTES: R4b R10-9"x1'-6" R10-9"x1'-6" R10-9"x1'-6" R10-9"x1'-6" R10-9"x1'-6" 3-Y16 (cut) 3-Y16 (cut)
2'-10 12"

11 GB0 3-Y20(thro) 3-Y20(thro) 3-Y20 (thro) 3-Y16 (thro) 3-Y16(thro) 3-Y16 (thro) 3-Y16(thro)
R31-9"x1'-3"

412" 412" 412 " 4 12"


R49-9"x1'-6"

2nd Layer 2nd Layer


UP A2 S2
2'-1012 "

2'-102 "

3-Y16 (thro) 3-Y16 (thro) 3-Y16 (thro) 3-Y16 (thro) 3-Y16 (thro) 1st Layer 1st Layer 1st Layer 1st Layer 2nd Layer 1st Layer 2nd Layer
S2 A1
7'-6"

2'-6"

3'-6"
1

9 5'-3" 3'-3"

LB-9"x1'-3"
412"

412"

412"

412"
1st Layer 1st Layer 1st Layer 1st Layer 1st Layer

GB2 3'-3" 5'-3"


8'-6"

1'-3"
6'

412" 18'-9" 18'-9"


3'

C2 9" COLUMN DETAILS 1. ALL DIMENSIONS AND LEVELS ARE IN MILLI METERS &
CANTILEVER BEAM 1 9'-3"(8Y-7"c/c) 18'(8Y-6"c/c) 9'-3"(8Y-7"c/c) 8'-1 12"(8Y-7"c/c)
5'(8Y-6"c/c) 16'-6"(8Y-4"c/c) 7'-9"(8Y-4"c/c)
9"x1'-6" 9"x1'-6" A2 A3 S2 2'-6" S2
5'

5'

5'

13'-102 "(8Y-7"c/c)
412 "

412 "

412 "

412 "

42 "
5'

712 "

712 "

10 S2 ROOF BEAM
3'

C6
1

6'

6'-1021"

LS OF ROOF BEAM -R45,R47,R49


C6
7'

C2 C2 C2 1'-9" 2' 3-Y16 (thro) 3-Y16 (thro)


3-Y16 (cut) 3-Y20 (cut) 2'-6" S2
C2 C2 METERS. 16
3-Y16 (thro)
1st Layer
2-Y12 (cut)
2nd Layer
3-Y16 (thro)
1st Layer
3-Y16 (thro)
1st Layer
3-Y16 (cut)
2nd Layer
1st Layer 1st Layer
1st Layer
3-Y20(cut)
1st Layer
1st Layer

S2 ROOF BEAM S2
2'-712 " 2'-6" 2'-6" 2'-6" C3 C2 GB0 R4b 14'-712 " 10' 19'-112" 14'-712 " 8'-1021" 6'-412" 18'-3" 9'-6" S3
3'-9" GB2 SILL BEAM 75 THICK 9"x2'-0" 9"x1'-6" 3-Y12 (thro) 3-Y12 (thro) S2 A4 A3 S2
4'-12"

9"x1'-6" 9"x1'-6" 9"x1'-6" 9"x1'-6" 9"x1'-6" 9"x1'-6" 3-Y12(thro) 2-Y12(thro) 3-Y12 (thro) 2-Y12(thro) 3-Y12 (thro) 2-Y12(thro) 3-Y12 (thro) 2-Y12(thro) 2-Y12(thro) 2-Y12(thro) 3-Y12 (thro) 2-Y12(thro)
7'-9"

2. CONTRACTOR TO PHYSICALLY VERIFY SITE CONDITIONS S1


1

1'-412 " 6'-4 12" LS OF ROOF BEAM -R7,R8,R15,R16,R18,R21,R22 1st Layer 2nd Layer 1st Layer 2nd Layer 1st Layer 2nd Layer 1st Layer 2nd Layer 1st Layer 2nd Layer 1st Layer 2nd Layer 1st Layer 2nd Layer
LS OF ROOF BEAM -R12 S3
9"
R38-9"x1'-6"

6' 6' 6' 6' SIZE 9"x1'-3" SIZE 9"x1'-6" SIZE 9"x1'-6" SIZE 9"x1'-6" SIZE 9"x1'-6" R9-9"x1'-6" S2
R42-9"x1'-6"

1
3'-10 2" 3' BEFORE COMMENCEMENT OF WORK & CONFIRM WITH GB2 GB2 GB1 18'(8Y-7"c/c)
1
17'-9 2"(8Y-7"c/c)
1
18'-22 "(8Y-7"c/c) 18'(8Y-7"c/c) 18'(8Y-7"c/c) 18'(8Y-7"c/c) 18'(8Y-7"c/c) S1
F2 F2 F2 F2 2'-6"(8Y-7"c/c)
R48-9"x1'-6"

R33-9"x1'-6"
R47-9"x1'-6"

R46-9"x1'-6"

3'-3" 2'-10 2"

8
2'-712 "

2'-712 "

2'-72 "

2'-712 "

1
1

15 B12 C12 D12 F12 H 12 N12 Q 12 T12


1

412" 421" 412 " 412" THE OWNER'S REPRESENTATIVE. ANY DISCREPANCY TO 1
R36-9"x1'-6"

Y8 1' c/c B24 C24 3-Y12 (thro) 2-Y12(thro) 3-Y12 (thro) 3-Y12 (thro) 2-Y12(thro) 3-Y12 (thro) 2-Y12(thro) 3-Y12 (thro) 2-Y12(thro) 3-Y12 (thro) 2-Y12(thro)
R44-9"x1'-6"

R9-9"x1'-6" 3-Y12 (thro) 2-Y12(thro) 2-Y12(thro)


R45-9"x1'-6"

R31-9"x1'-6"

3-Y16 (cut)
MIX MIX MIX MIX MIX R8-9"x1'-6" 3" 1 1 3-Y16 (cut) 3-Y16 (cut) 3-Y16 (cut) 2nd Layer 2nd Layer 2nd Layer
S1
3'-3"

M20 M20 M20 M20 M20 R8-9"x1'-6" R8-9"x2'-0" 3-Y16 (cut) 1st Layer 2nd Layer 1st Layer 1st Layer 2nd Layer 1st Layer 2nd Layer 1st Layer 2nd Layer 1st Layer 1st Layer

GB2 3-Y16 (cut)


2nd Layer
2nd Layer
3-Y16 (thro) 3-Y16 (thro) 3-Y16 (thro) 2nd Layer
3-Y16 (thro) 2nd Layer
3-Y16 (thro) 3-Y16 (thro)
3- Y10(thro) S1
412"

412"

42"

412"

2nd Layer

BE BROUGHT TO THE NOTICE OF THE ENGINEER. GB1 GB1 2'-9" 3'-3" 2-Y16 (cut) 3-Y16 (thro)
2nd Layer

9 GB1 3'-3" 5'-3" 18'-612 " 18'-1112 "


1

1st Layer 1st Layer 1st Layer 1st Layer 1st Layer 1st Layer
18'-9" 3'-3" 18'-9" 18'-9" 18'-9" 18'-9"
GB2 GB1 GB1 7
3'-3" 3'-3" 5'-3" 2nd Layer
3'-3" LB-9"1'-3"
6'

6'

6'

6'

GB2 3'-3" 1st Layer


9"x1'-6" 9"x1'-6" 9"x1'-6" LS OF ROOF BEAM -R46 9"x1'-6" 9"x1'-6" LS OF ROOF BEAM -R46 9"x1'-6" 9"x1'-6" 9"x1'-6" at landing level
SECOND FLOOR FLIGHT TYPE - A3-A4
R30-9"x1'-6"

LS OF ROOF BEAM -R46 STAIRCASE 2 LAYOUT


R29-9"x1'-6"

1 1
16'-6"(8Y-6"c/c) 5'(8Y-7"c/c) 8'-12 "(8Y-7"c/c) 9'-3"(8Y-7"c/c) 18'(8Y-6"c/c) 9'-3"(8Y-7"c/c) 8'-12 "(8Y-7"c/c) 5'(8Y-4"c/c)
C2 6-Y16+ Y12 10-Y16+ Y12
3. ALL LEVELS TO BE CONFIRMED BY THE CONTRACTOR 14
CANTILEVER BEAM
1 1 16'-6"(8Y-6"c/c) LB-9"1'-3"
C3 C2 C3 F3 8-Y12 8-Y12 Y12
MAIN.REINF. 10-Y16
Y12 LB-Landing Level beam
6'-1012 "

7' F2 6' MAIN.REINF. MAIN.REINF. MAIN.REINF. 4-Y12 MAIN.REINF. 4-Y12 GB1 CANTILEVER BEAM 9" BRICK WORK 1 1
1'-9" 3-Y16 (thro) 3-Y16 (cut)
1'-9"
3-Y16 (thro) 3-Y16 (thro) 3-Y16 (thro)
1'-9"
3-Y16 (thro) 3-Y16 (cut) 2' 3-Y16 (thro) 3-Y16 (thro) 3-Y16 (thro)
1'-9" 3-Y16 (cut)
1'-9" 2-Y16+1-Y12(thro) 3-Y12(thro)
2-Y16+1-Y12(thro)
3-Y12(thro)
2-Y16+1-Y12(thro)
3-Y12(thro)
2-Y16+1-Y12(thro)
3-Y12(thro)
2-Y16+1-Y12(thro)
3-Y12(thro)
2-Y16+1-Y12(thro) 3-Y12(thro) 2-Y16+1-Y12(thro)
3-Y12(thro) UP
at landing level
FLIGHT TYPE - A3-A4
BEFORE COMMENCEMENTOF WORKS WITH RESPECT TO
1st Layer
1st Layer 2nd Layer 1st Layer 2nd Layer 1st Layer 1st Layer
3-Y16 (thro) 1st Layer 1st Layer 1st Layer 1st Layer 1st Layer 1st Layer 1st Layer

3' 3' 3' 3' 6


1st Layer 1st Layer 1st Layer 2nd Layer 2nd Layer 2nd Layer 2nd Layer 2nd Layer 2nd Layer 2nd Layer
Y12 Y12 Expansion joint 25mm Gap 1st Layer
2nd Layer

6'-1 12" 8'-1021" 19'-112" 14'-712 " 8'-1012 " 5'-412 "
6'-721"

Y12 Y12 CANTILEVER BEAM 18' 10' A1 A4


3'-6"

R7-9"x1'-6" 9"x1'-6" 1 1
18'-3"
TIES Y8-6" c/c TIES Y8-6" c/c TIES Y8-6" c/c TIES Y8-6" c/c TIES Y8-6" c/c EXISTING ROADS/BUILDINGS. APPROVAL IN WRITING GB0 R7-9"x2'-0" R7-9"x1'-6" 9"x1'-6" 9"x1'-6" 9"x1'-6" 9"x1'-6" 9"x1'-6" 9"x1'-6" 9"x1'-6"
9"x1'-6"
18'(8Y-4"c/c)
2'-6"(8Y-7"c/c)
17'-92 "(8Y-4"c/c) 18'-22 "(8Y-4"c/c) 18'(8Y-4"c/c) 18'(8Y-4"c/c) 18'(8Y-4"c/c) 18'(8Y-4"c/c)

CF2 CF3 9' 412" 2'-6"


3'

9" GB1 LS OF ROOF BEAM -R14


5'-9"

3'-1 12" 8'-6"


4" 4" 4 12" 412 " 412 " 4 12" 412 " 4 12" 4 12" 412 "
FROM THE ENGINEER-IN-CHARGE. GB2
LS OF ROOF BEAM -R26 2-Y16+1-Y12(thro) 3-Y12(thro) 2-Y16+1-Y12(thro) 3-Y12(thro) 2-Y16+1-Y12(thro) 3-Y12(thro) 2-Y16+1-Y12(thro) 3-Y12(thro) 2-Y16+1-Y12(thro) 3-Y12(thro) 2-Y16+1-Y12(thro) 3-Y12(thro) 2-Y16+1-Y12(thro) 3-Y12(thro)
STAIRCASE 1 LAYOUT 2'-6"
412"

412"

1st Layer 2nd Layer 2nd Layer 1st Layer 2nd Layer 2nd Layer 2nd Layer 1st Layer 2nd Layer 2nd Layer
LB-Landing Level beam LANDING
6'

GB2
1st Layer 1st Layer 1st Layer 1st Layer

S1
7'

3'-3" 2'-102 "

8
R48-9"x1'-6"

CF1 2'-6"
1

R45-9"x1'-6"
2'-10 2 "

U24 V24 X24 18'-9" 3'-3" 18'-612 " 18'-11 12" 18'-9" 18'-9" 18'-9" 18'-9"
Floor finish D 23 G 23 L23 P23 T23
1

4 12" SIZE 9"x1'-3" SIZE 9"x1'-6" SIZE 9"x1'-6" SIZE 9"x1'-6" SIZE 9"x1'-6" R6-9"x1'-6" (TYP)
2'-72 "

4. GRADE OF CONCRETE SHALL BE MADE M30, STEEL OF R6-9"x1'-6" R6-9"x1'-3" LS OF ROOF BEAM -R48
1'-10 12" 3'-3" 1'-1012 "

1' 1' 13 R6-9"x1'-3" R6-9"x1'-6" 9"x1'-6"


R44-9"x1'-6"

LS OF ROOF BEAM -R48


2'-1 2"

9"x1'-6" 9"x1'-6" 9"x1'-6" 9"x1'-6" 9"x1'-6" 9"x1'-6" 9"x1'-6"


C3 C2

S1
3-Y16 (cut)
GB1
1

3-Y20(thro) 3-Y20(thro) 3-Y20 (thro) LS OF ROOF BEAM -R48 S2


GB1 GB1 GB1 FFL +4'-6" 3-Y16(thro) 3-Y16(thro) 3-Y16(thro) 2nd Layer
3-Y16(thro) 3-Y16(thro)
R49-9"x1'-6"
412 "

412 "

412 "

GB1 GB1 5 1st Layer 1st Layer 1st Layer


2'-112 "

1st Layer 1st Layer 1st Layer 1st Layer 1st Layer

C2 7 GRADE Fe-500. GB0 R4b 2'-9"


R46-9"x1'-6"

C6 C6 30d
R47-9"x1'-6"

S2
12 CANTILEVER BEAM
R5-9"x1'-6" 9'-3"(8Y-6"c/c) 16'-6"(8Y-4"c/c) 7'-9"(8Y-4"c/c) S2
3' 6-Y10; Y8-150 c/c Stirrups 1 1
8'-6"

6"
13'-22 "(8Y-6"c/c) 13'-4"(8Y-6"c/c) 13'-4"(8Y-6"c/c) 13'-2 2"(8Y-4"c/c) 5'(8Y-6"c/c)
3'-6" MIX M20 MIX M20 MIX M20 MIX M20 MIX M20 GB2
3'-3"

3'-3"

4 12" 30d
7'

1' GB2 4
9'

1' 5. USE PPC CEMENT CONFORMING TO IS:1489 AND STEEL GB2

S2
R38-9"x1'-6"

3-Y16(thro) 3-Y16(thro) 3-Y16(thro) 3-Y16(thro) 3-Y16(thro) 3-Y16 (cut) 3-Y20 (cut) S2


FIRST FLOOR 3-Y16 (cut)
412"

412"

412"

GB2 GB2 3-Y20(cut)


R36-9"x1'-6"

CANTILEVER BEAM 1st Layer 1st Layer 1st Layer 1st Layer 1st Layer 1st Layer 1st Layer
R42-9"x1'-6"

R33-9"x1'-6"

2nd Layer

C2 C6 C6 6 6-Y16+ 10-Y16+ CONFORMING TO IS:1786 FLOOR BEAM 1st Layer


S2 S3 LB-9"1'-3"
R30-9"x1'-6"

at landing level
7'-6" 7'-6" 7'-6" 7'-6"
6'-0"

MAIN.REINF. 10-Y16 10'-712 "


Y12 Y12 Y12 Y12
MAIN.REINF. 8-Y12 MAIN.REINF. 8-Y12 MAIN.REINF. 4-Y12 MAIN.REINF. UP 14'-2 " 1
14'-4" 14'-3 " 1
14'-2 " 1
5'-10 " 1 18'-3" 9'-6"
2'-7 2 "

2'-10 2"
1

R4b
R29-9"x1'-6"

2 2 2 2
1

4-Y12 GB2 GB1 R4c-9"x1'-3" R4c-9"x1'-3" R4c-9"x1'-3" R4c-9"x1'-3" R4c-9"x1'-3"


9"x1'-6" 9"x1'-6" 9"x1'-6" 9"x1'-6" 9"x1'-6" 9"x1'-6" 9"x2'-0"
LS OF ROOF BEAM -R25
9"x1'-6"
S3 LB-9"1'-3"
at landing level 2'-6" LB: Y20-3 Top
6. CLEAR COVER:SLABS-20mm; BEAMS-25mm;
10'

LS OF ROOF BEAM -R24


5'-9"

Y12 Y12
GB1
10'-1012"

7' F4 F4 F4 F4 Y12 Y12


GB1 GB1 LS OF ROOF BEAM -R13 LB: Y16-3 Top
S1
Y20-3 Bottom
4'-1 12"

4'-1 12"

4'-1 2"

4'-1 12"

4'-3" F3 GB0 GB1 GB1 GB1


1

4'-6" 412" 421" 412 " 412" 7' F2 6' TIES Y8-6" c/c
4" 4"
TIES Y8-6" c/c TIES Y8-6" c/c TIES Y8-6" c/c TIES Y8-6" c/c COLUMNS-40mm; FOOTINGS-50mm. GB1 GB1 C26 E23 K23 O23 S23 U23 V23 X 23 2'-6"
Y16-3 Bottom
Y8-4" c/c Stirrups
Y8-4" c/c Stirrups

412 " 4 12" 4 12 " 4 12" 4 12" 421" 4 12" 412 " S1
7'-6"

7'-6"

7'-6"

7'-6"

NGL +0'-0" GRADE BEAM 3-Y16(thro) 3-Y16(cut) 3-Y16(thro) 3-Y16(thro) 3-Y16(thro) 3-Y16(thro) 3-Y16(thro) 3-Y20(cut) 3-Y20(cut) 3-Y16 (thro)
S2
R4b-9"x1'-3"
3'-6"

7. DEVELOPMENT LENGTH SHALL BE 50 TIMES DIA OF "6-'1x"9-a4R


1st Layer 1st Layer 1st Layer 1st Layer 1st Layer 1st Layer 1st Layer
412"

412"

42"

412"

5 2'-9" 2nd Layer 2nd Layer


2'-112 "

2nd Layer
2'-9"
1

1
42" SIZE SIZE SIZE SIZE SIZE GB2 GB2 GB2 GB2 11 TITLE: CONSULTANT: LVL
3'

C5 C3 C3 C5 9" 9"x1'-3" 9"x1'-6" 9"x1'-6" 9"x1'-6" 9"x1'-6" REINFORCEMENT. 11'-712 "(8Y-6"c/c) 14'(8Y-6"c/c) 11'(8Y-6"c/c) 9'-3"(8Y-6"c/c) 16'-6"(8Y-4"c/c) 7'-9"(8Y-4"c/c) S2 CONSULTANT:
1'-3"
412 "

412 "

GB1 GB1 LVL


7'

6'

4 3-Y16 (thro) 3-Y16 (thro) 3-Y16 (cut) 3-Y16 (thro) 3-Y16 (cut) 3-Y16 (thro) 3-Y16 (thro) 3-Y16 (thro) 3-Y20(cut) 3-Y16 (thro) CONSULTANT:
CONSULTANT:
AAKASH Designers
8. FRAME IS ANALYSED USING IS:1893-2000, IS:875-1987 & 10 1st Layer 1st Layer
2nd Layer
1st Layer
2nd Layer
1st Layer 1st Layer 1st Layer
2nd Layer
1st Layer

3'-9" 3'-9" 3'-9" 3'-9" C3 C2 GROUND FLOOR


MIX M20 MIX M20 MIX M20 MIX M20 MIX M20 GB1 GB1 GB1 GB1 3 PCC 3" THK 13' 18'-1012 " 15'-112" 11'-9" 10'-721" 18'-3" 9'-6"
DESIGNED BY IS:456-2002. GB0 GB2 R3-9"x1'-6" R3-9"x2'-0" R4-9"x1'-6" 9"x1'-6" 9"x1'-6" 9"x1'-6" 9"x1'-6" 9"x1'-6" 9"x1'-6" 9"x1'-6" AAKASH Designers AAKASH Designers S2
FLIGHT TYPE - A1-A2
Karaikal
4'-6"

S1
LS OF ROOF BEAM -R28
CONSULTANT: Cell : 98423 48148
MAIN.REINF. 6-Y16+ 10-Y16+
7'-9"

3'
10'-1021"

3'-6" MAIN.REINF. 8-Y12 MAIN.REINF. Y12 Y12


MAIN.REINF. MAIN.REINF. Y12 Y12
GB1 S2 FLIGHT TYPE - A1-A2
R45-9"x1'-6"

8-Y12 10-Y16 Karaikal Karaikal


9. PILE FOUNDATION IS ADOPTED AS PER SOIL REPORT GB1 A27 C27

S1
4-Y12 4-Y12 TYP.CONNECTIUON DETAILS
R30-9"x1'-6"

9"

AAKASH Designers Cell : 98423 48148 Cell : 98423 48148


R49-9"x1'-6"

2'-0"

F3 F4 AAKASH Designers 5-Y20 (thro) 5-Y16 (thro) PROJECT:


"6-'1x"9-74R

7'-6" Y12 Y12 Y12 Y12


AND IT IS DESIGNED FOR G+2 FLOORS GB1 2 TYP. LINTEL & SUNSHADE DETAIL
5-Y20 (thro) 3-Y20 (thro)
R29-9"x1'-6"

GB2
2nd Layer 5-Y16 (thro) 3-Y20 (thro)

7'
1st Layer

2'-0"

2'-0"
F2 6' F2 6' F2 6' GB2 GB2
4Legged 10Y-8" c/c 2Legged 10Y-6" c/c

TIES Y8-4" c/c TIES Y8-4" c/c TIES Y8-4" c/c TIES Y8-4" c/c TIES Y8-4" c/c R2-9"x1'-6" R2-9"x1'-3" GB1
R42-9"x1'-6"

R2-9"x1'-3" R2-9"x1'-6"
5-Y16 (thro) 3-Y20 (thro)

Karaikal PROJECT: PROPOSED CONSTRUCTION OF HOSTEL


GB2 GB1 GB1 GB1 GB2 R2-9"x1'-6"
5-Y20 (thro) 3-Y20 (thro)
R38-9"x1'-6"

1
30'-42 "(4-LEGGED 10Y-8"c/c)
R36-9"x1'-6"

R33-9"x1'-6"

4" 4" 4 12" 4 12" 412 " 412 " 412 " 412 " 4 12" 4 12" HEIGHT OF FLOOR FROM NGL UPTO +0.75
GB2 PROJECT: PROJECT: BUILDING AT VEDARNAYAM
3'-9"

9 Karaikal Cell : 98423 48148 GB1


3'-6"

PROPOSED CONSTRUCTION OF HOSTEL


4 12" GB2 GB2
2Legged 10Y-6" c/c

1
1' 1' GB2
3'

4Legged 10Y-8" c/c

42"
3'

3'

9" COLUMN MARKD. C1 C2 C3 C4 C5 GB0 5-Y20 (thro) 5-Y16 (thro) PROPOSED CONSTRUCTION OF HOSTEL BUILDING AT BUILDING AT VEDARNAYAM
Cell : 98423 48148
7'-6"

1st Layer 2nd Layer


PROJECT:
412 "

412 "

412 "

412 "

412 "

32'-412 "
6'-10 12 "

P2a-9"x2"-0"
10'

VEDARNAYAM
6'

6'

6'

3 GB2
7'

F2 6' F2 6' F2 6' F2 6' PROPOSED CONSTRUCTION OF HOSTEL BUILDING AT VEDARNAYAM


2'-0"x2'-0" PROPOSED CONSTRUCTION OF HOSTEL BUILDING AT
C6 C6 GB0 P1,P2,P3,P4-2'-0x2"-0" VEDARNAYAM
4'-6"

C2 C7 C3
412" 421" 412 " 412 "
3'

3'

3'

3'

3'-712 " 3'-6" 3'-9" 3'-712" 3'-712 "


42"

412"

412"

42"
6'

6'

6'

6'

2
3'-3" 2'-102 "

8 1
1

C6 C6 C6 C6 GB2
GB2 GB2 GB2 GB2 GB2 GB2 GB2 R1-9"x1'-6" R1-9"x1'-6" R1-9"x1'-6" R1-9"x1'-6" R1-9"x1'-6" R1-9"x1'-6" R1-9"x1'-6" R1-9"x1'-6"
GB2 GB2 7
1 1 1 1
2'-42 " 2'-42" 2'-4 2" 3'-72 " GB2
10'

F2 GB2 GB2
F1 5' F2 6' F2 6' 5' F1 5' F1 5' 5' 6' 5' 6
F1 F1 F1 SIZE 9"x2'-0" SIZE 9"x2'-0" SIZE 1'-0" DIA GB2 GB1 9'-10 12 " 18'-3" 6'-4 12" 4'-3" 3'-412 "1'-3" 5'-512 " 1'-8"2'-10 12" 2'-9" 7' 2'-1 12" 4'-10 12" 2'-9" 4'-7" 5'-5" 1'-3" 7'-6" 5'-10 12" 18'-4 12"
GB2 GB1
1
2'-6"

1
2'-6"

1
2'-6"

1
2'-6"

1
2'-6"

2'-6"

5'-9"

4 2" 1' 1' 42" 42 " 42 " 42" 1


GB1
3'

3'

42"
3'

9" MIX MIX MIX X V U T S RQ P O N M L K J H G F E D C B


M20 M20 M20
412 "

412 "

412 "

412 "

42 "

412 "

412 "

412 "

412 "

GB0
5'

6'

6'

5'

5'

5'

5'

6'

5'

1
C2 C2 C2 C2 C2 C3 SECOND FLOOR
C2 C6 C6 5
MAIN.REINF. 10-Y12
2'-1 2"

10-Y16 8-Y16
1

1
2'-102 " 2'-1 2"
1
2'-12 "
1
2'-1 2"
1
2'-12 "
1 MAIN.REINF. MAIN.REINF. GB1 GB1 GB1 GB1 GB1
2'-6" GB2 GB2 GB2
3' 3' 3'-412 " GB2 GB1 GB2 4
TIES Y8-6" c/c TIES Y8-6" c/c TIES Y8-6" c/c GB2 GB2 GB2 GB2
9'-1012 " 18'-3" 6'-4 12" 4'-3" 3'-4 12"1'-3" 5'-5 12" 1'-8"2'-10 12" 2'-9" 2'-112 " 4'-1012 " 2'-9" 5'-10 12" 18'-4 12 " GB2
7' 4'-7" 5'-5" 1'-3" 7'-6" 6" 6" 6" 6"
GB0 GB1
GB1 GB1 GB1 GB2
1'-0" DIA
10'-1012 "

SIZE 9"x2'-0" SIZE 9"x2'-0" SIZE SIZE 2'-0" DIA SIZE 2'0"x2'-0" NOTES:
X V U T S RQ P O N M L K J H G F E D C B Ld=50d 1'-6"(min.) GB2
D

GB1
MIX MIX MIX MIX MIX GB0 CLIENT:
1.ALL DIMENSIONS AND LEVELS ARE IN FOOT & INCHES, UNLESS NOTED OTHERWISE.
Ld FIRST FLOOR
M20 M20 M20 M20 M20
GB2 GB2 GB2 GB2
PROJECT:
FOOTING LAYOUT MAIN.REINF. 10-Y12 MAIN.REINF. 10-Y16 MAIN.REINF. 8-Y16 MAIN.REINF. 9-Y20 MAIN.REINF. 9-Y20 2.CONTRACTOR TO PHYSICALLY VERIFY SITE CONDITIONS BEFORE COMMENCEMENT OF
3
GB2 GB2 WORK & CONFIRM WITH THE OWNER'S REPRESENTATIVE. ANY DISCREPANCY TO PROPOSED CONSTRUCTION OF HOSTEL BUILDING AT VEDARNAYAM
4'-6"

TIES Y8-6" c/c TIES Y8-6" c/c TIES Y8-6" c/c TIES Y8-6" c/c TIES Y8-6" c/c GB2
6" 6" 6" 6" GB2 BE BROUGHT TO THE NOTICE OF THE ENGINEER.
6"

PCC 1:4:8 SIZE 9"x2'-0" SIZE 9"x2'-0" SIZE 1'-0" DIA SIZE 2'-0" DIA SIZE 2'0"x2'-0"
6"
2 3. ALL LEVELS TO BE CONFIRMED BY THE CONTRACTOR BEFORE COMMENCEMENT OF
GB1 GB1 GB1 GB1 GB1
GB2 GB2 WORKS WITH RESPECT TO EXISTING ROADS/BUILDINGS. APPROVAL IN WRITING
MIX M20 MIX M20 MIX M20 MIX M20 MIX M20 GB2 GB2 GB2
QUARRY DUST GROUND FLOOR FROM THE ENGINEER-IN-CHARGE.
6"

GB1 GB1 GB1 GB1


10'

6"
MAIN.REINF. 10-Y12 MAIN.REINF. 10-Y16 MAIN.REINF. 8-Y16 MAIN.REINF. 9-Y20 MAIN.REINF. 12-Y20 TITLE: CONSULTANT:
FOOTING LAYOUT 6" 6" TITLE: DIRECTION: 4. GRADE OF CONCRETE SHALL BE MADE M20, STEEL OF GRADE Fe-500.
TIES Y8-4" c/c TIES Y8-4" c/c TIES Y8-4" c/c TIES Y8-4" c/c TIES Y8-4" c/c
COLUMN DETAILS 5. USE PPC CEMENT CONFORMING TO IS:1489 AND STEEL CONFORMING TO IS:1786
TYPICAL SECTION OF FOOTING F1
6" 6" 6" 6"
1
COLUMN MARKD. C6 C7 C8 C9 C10 GB1 GB2 GB1 GB1 GB1 GB1 GB1 GB2 6. CLEAR COVER:SLABS-20mm; BEAMS-25mm; COLUMNS-40mm; FOOTINGS-50mm. ROOF BEAM LAYOUT
DRAWN RAMESH DATE 17.07.2023 SHEET NO. 02 7. DEVELOPMENT LENGTH SHALL BE 50 TIMES DIA OF REINFORCEMENT.
AAKASH Designers
NOTES: Karaikal
CHECKED RAVIVERMAN SCALE NTS REV. NIL 1
9'-102 " 18'-3" 6'-42"
1
4'-3"
1
3'-4 2"1'-3" 5'-5 2" 1'-8"
1
2'-10 2 "2'-9"
1
7'
1
2'-12 " 4'-102 " 2'-9"
1
4'-7" 5'-5" 1'-3" 7'-6"
1
5'-10 2 " 18'-42 "
1
8. FRAME IS ANALYSED USING IS:1893-2000, IS:875-1987 & DESIGNED BY IS:456-2002.
Cell : 98423 48148
CLIENT: APPROVED KUMARAN DRG. NO. HOSTEL
9. THE SBC IS TAKEN FROM SOIL REPORT. THE FOOTING IS DESIGNED FOR G+2 FLOORS.
1.ALL DIMENSIONS AND LEVELS ARE IN FOOT & INCHES, UNLESS NOTED OTHERWISE. X V U T S RQ P O N M L K J H G F E D C B

2.CONTRACTOR TO PHYSICALLY VERIFY SITE CONDITIONS BEFORE COMMENCEMENT OF PROJECT:


WORK & CONFIRM WITH THE OWNER'S REPRESENTATIVE. ANY DISCREPANCY TO PROPOSED CONSTRUCTION OF HOSTEL BUILDING AT VEDARNAYAM
GRADE BEAM LAYOUT
BE BROUGHT TO THE NOTICE OF THE ENGINEER.
NOTES:
3. ALL LEVELS TO BE CONFIRMED BY THE CONTRACTOR BEFORE COMMENCEMENT OF CLIENT:
1.ALL DIMENSIONS AND LEVELS ARE IN FOOT & INCHES, UNLESS NOTED OTHERWISE.
WORKS WITH RESPECT TO EXISTING ROADS/BUILDINGS. APPROVAL IN WRITING 2.CONTRACTOR TO PHYSICALLY VERIFY SITE CONDITIONS BEFORE COMMENCEMENT OF PROJECT:
FROM THE ENGINEER-IN-CHARGE. CONSULTANT: WORK & CONFIRM WITH THE OWNER'S REPRESENTATIVE. ANY DISCREPANCY TO PROPOSED CONSTRUCTION OF HOSTEL BUILDING AT VEDARNAYAM
TITLE: CONSULTANT: BE BROUGHT TO THE NOTICE OF THE ENGINEER.
4. GRADE OF CONCRETE SHALL BE MADE M20, STEEL OF GRADE Fe-500. AAKASH Designers 3. ALL LEVELS TO BE CONFIRMED BY THE CONTRACTOR BEFORE COMMENCEMENT OF
5. USE PPC CEMENT CONFORMING TO IS:1489 AND STEEL CONFORMING TO IS:1786 Karaikal WORKS WITH RESPECT TO EXISTING ROADS/BUILDINGS. APPROVAL IN WRITING
Cell : 98423 48148 FROM THE ENGINEER-IN-CHARGE.
6. CLEAR COVER:SLABS-20mm; BEAMS-25mm; COLUMNS-40mm; FOOTINGS-50mm. AAKASH Designers 4. GRADE OF CONCRETE SHALL BE MADE M20, STEEL OF GRADE Fe-500.
TITLE: CONSULTANT:
FOOTING LAYOUT AND DETAILS Karaikal
7. DEVELOPMENT LENGTH SHALL BE 50 TIMES DIA OF REINFORCEMENT. 5. USE PPC CEMENT CONFORMING TO IS:1489 AND STEEL CONFORMING TO IS:1786
Cell : 98423 48148 PROJECT:
8. FRAME IS ANALYSED USING IS:1893-2000, IS:875-1987 & DESIGNED BY IS:456-2002. 6. CLEAR COVER:SLABS-20mm; BEAMS-25mm; COLUMNS-40mm; FOOTINGS-50mm.
GRADE BEAM LAYOUT AAKASH Designers
PROPOSED CONSTRUCTION OF HOSTEL
7. DEVELOPMENT LENGTH SHALL BE 50 TIMES DIA OF REINFORCEMENT.
9. THE SBC IS TAKEN FROM SOIL REPORT. THE FOOTING IS DESIGNED FOR G+2 FLOORS. BUILDING AT VEDARNAYAM
8. FRAME IS ANALYSED USING IS:1893-2000, IS:875-1987 & DESIGNED BY IS:456-2002.
Karaikal
Cell : 98423 48148
9. THE SBC IS TAKEN FROM SOIL REPORT. THE FOOTING IS DESIGNED FOR G+2 FLOORS.