0% found this document useful (0 votes)
19 views

Working Drawing

The document is a proposal for a guest house to be built on a 540 square meter plot of land in Nsukka, Enugu State, Nigeria. It includes a site plan, roof plan, and floor plan. The proposed building will cover 44.9% of the plot and have a total area of 242.95 square meters. It will include 8 rooms labeled A through H, a changing room, store, and toilet/bathroom. The total estimated cost is 30,000 Nigerian naira.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
19 views

Working Drawing

The document is a proposal for a guest house to be built on a 540 square meter plot of land in Nsukka, Enugu State, Nigeria. It includes a site plan, roof plan, and floor plan. The proposed building will cover 44.9% of the plot and have a total area of 242.95 square meters. It will include 8 rooms labeled A through H, a changing room, store, and toilet/bathroom. The total estimated cost is 30,000 Nigerian naira.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 37

PROPOSED GUEST HOUSE

@
AMENU EDEM ANI
NSUKKA L.G.A
ENUGU STATE
CONSULT CLIENT.
J.C SOLIDROCK CONCEPT
CIVIL ENGINEERS AND ENGINEERING CONSULTANCY MR. AMEDU NNAEMEKA
AMEDU
PROPERTY MANAGERS
REAL ESTATE
FEBUARY 2024
39 UNITY ESTATE OFF MARYLAND, ENUGU.
+2347030127290
2000

18000
PROPOSED BUILDING
1000

30000
8200 1000
15000
SITE ANALYSIS
AREA OF PLOT ----- 540msq

10750
AREA OF BUILDING----242.95msq
PERCENTAGE COVERAGE---44.9%
SITE PLAN
CONSULTANT PROJECT DRAWING TITLE DRAWN
J.C SOLIDROCK CONCEPT PROPOSED GUEST HOUSE SCHEDULE J.C SOLIDROCK CONCEPT
NOTE
GENERAL CONTRACTOR
CIVIL ENGINEERING WORKS
SHEET
SUPERVISION & PROCUREMENT SCALE DATE NO
ARCHIECTURAL BLUEPRINT
STRUCTURAL DESIGNS FEBURARY CHECKED
ETC 1:100 2024 S-01
07030127290 ARCH. CHIDI
2
1 2 3 4 5 6 7
15975
3825 2000 850 4050 1425 3825
A A
3825

3825
B B
1425

1425
C C
1800

1800
D D
14700

14700
1 1
825

825
E E
2100

2100
F F
600

600
G G
4125

4125
H H
3825 2000 850 4050 1425 3825
15975
1 2 3 4 5 6 7
2
ROOF PLAN
CONSULTANT PROJECT DRAWING TITLE DRAWN
J.C SOLIDROCK CONCEPT PROPOSED GUEST HOUSE SCHEDULE J.C SOLIDROCK CONCEPT
NOTE
GENERAL CONTRACTOR
CIVIL ENGINEERING WORKS
SHEET
SUPERVISION & PROCUREMENT SCALE DATE NO
ARCHIECTURAL BLUEPRINT
STRUCTURAL DESIGNS FEBURARY CHECKED
ETC 1:100 2024 S-01
07030127290 ARCH. CHIDI
2
1 2 3 4 5 6 7
15975
3825 2000 850 4050 1425 3825
600 675 600 600 600
1725 2175 875 900 1450 900 825 225
1200 825 1200 825
A A
825

825
3600 1775 1200
3250
1650
600

CHANGING T/B
ROOM STORE
3600
1200
3825

3600

3600

3825
600 1000 1025600 1200

600 1425 6001125 600 1200


ROOM 3
KITCHEN
2000

LAUNDRY
2175
B B
1425

1200

1425
VER. LOBBY 13350
225

C 1200
C
RESTROOM
1575
1800

1800
3600

675
D D

3675
14700

14700
ROOM 2
1
3000

1
825

825
4500
RECEPTION

825600 1500 6001125 600 1425 600


E E

8325
2700
2625
2100

2100
OFFICE

350
1200 900 1200 1125 2450 10001

1200
F T/B F
600

600
G G

6600
MINI BAR

4125

4125
3900
ROOM 1

2100
3825

1425
3600
T/B
H H
1800 800 900 1200 1800 1500 1125 1200 825
600 600 600 600 600
225 625 525 225 450
3825 2000 850 4050 1425 3825
15975
1 2 3 4 5 6 7
2
GROUND FLOOR PLAN
CONSULTANT PROJECT DRAWING TITLE DRAWN
J.C SOLIDROCK CONCEPT PROPOSED GUEST HOUSE SCHEDULE J.C SOLIDROCK CONCEPT
NOTE
GENERAL CONTRACTOR
CIVIL ENGINEERING WORKS
SHEET
SUPERVISION & PROCUREMENT SCALE DATE NO
ARCHIECTURAL BLUEPRINT
STRUCTURAL DESIGNS FEBURARY CHECKED
ETC 1:100 2024 S-01
07030127290 ARCH. CHIDI
2
1 2 3 4 5 6 7
15975
3825 2000 850 4050 1425 3825
1200
A 3600 1775 3250 A
2100

2600

ROOM 5 T/B T/B


1200 3600

4200
4400
3825

3600

3825
T/B
ROOM 6
2850 ROOM 7
STORE 2
B B
13950
1425

1425
1200

2175 LOBBY
1500

T/B
C C
1800

1800
D D

3675
14700

14700
ROOM 8
1 1
825

825
4500

RELAXATION
4000

E E

8325
ROOM 4 4200
3600
2100

2100
2625

1200
F T/B F
600

600
3825
G G

6600
ROON 10
4125

4125
3900
ROOM 9

2100
T/B
3600
1875 T/B
H H
3825 2000 850 4050 1425 3825
15975
1 2 3 4 5 6 7
2
1ST & 2ND FLOOR PLAN
CONSULTANT PROJECT DRAWING TITLE DRAWN
J.C SOLIDROCK CONCEPT PROPOSED GUEST HOUSE SCHEDULE J.C SOLIDROCK CONCEPT
NOTE
GENERAL CONTRACTOR
CIVIL ENGINEERING WORKS
SHEET
SUPERVISION & PROCUREMENT SCALE DATE NO
ARCHIECTURAL BLUEPRINT
STRUCTURAL DESIGNS FEBURARY CHECKED
ETC 1:100 2024 S-01
07030127290 ARCH. CHIDI
-
---
5000

5000
600
3000

14900
150

9300
3000

150
3000

450 150

600
Depth of foundation to be determined
on site after soil test and investigation.
300mm consolidated hardcore filling.
Also, the foundation depth depends on
150mm thick well compacted laterite filling.
the soil bearing capacity
225/675mm foundation footing.
75mm concrete blinding.
SECTION 1
CONSULTANT PROJECT DRAWING TITLE DRAWN
J.C SOLIDROCK CONCEPT PROPOSED GUEST HOUSE SCHEDULE J.C SOLIDROCK
NOTE CONCEPT
GENERAL CONTRACTOR
CIVIL ENGINEERING WORKS
SHEET
SUPERVISION & PROCUREMENT SCALE DATE NO
ARCHIECTURAL BLUEPRINT
STRUCTURAL DESIGNS FEBUARY CHECKED
ETC 1:100 2024 S-01
07030127290 ARCH. CHIDI
-
---
Depth of foundation to be determined
on site after soil test and investigation.
300mm consolidated hardcore filling.
Also, the foundation depth depends on
the soil bearing capacity 150mm thick well compacted laterite filling.
225/675mm foundation footing.
75mm concrete blinding.
SECTION 2
CONSULTANT PROJECT DRAWING TITLE DRAWN
J.C SOLIDROCK CONCEPT PROPOSED GUEST HOUSE SCHEDULE J.C SOLIDROCK
NOTE CONCEPT
GENERAL CONTRACTOR
CIVIL ENGINEERING WORKS
SHEET
SUPERVISION & PROCUREMENT SCALE DATE NO
ARCHIECTURAL BLUEPRINT
STRUCTURAL DESIGNS FEBUARY CHECKED
ETC 1:100 2024 S-01
07030127290 ARCH. CHIDI
SOUTH VIEW
CONSULTANT PROJECT DRAWING TITLE DRAWN
J.C SOLIDROCK CONCEPT PROPOSED GUEST HOUSE SCHEDULE
J.C SOLIDROCK
NOTE CONCEPT
GENERAL CONTRACTOR
CIVIL ENGINEERING WORKS
SHEET
SUPERVISION & PROCUREMENT SCALE DATE NO
ARCHIECTURAL BLUEPRINT
STRUCTURAL DESIGNS FEBUARY CHECKED
ETC 1:100 2024 S-01
07030127290 ARCH. CHIDI
NORTH VIEW
CONSULTANT PROJECT DRAWING TITLE DRAWN
J.C SOLIDROCK CONCEPT PROPOSED GUEST HOUSE SCHEDULE
J.C SOLIDROCK
NOTE CONCEPT
GENERAL CONTRACTOR
CIVIL ENGINEERING WORKS
SHEET
SUPERVISION & PROCUREMENT SCALE DATE NO
ARCHIECTURAL BLUEPRINT
STRUCTURAL DESIGNS FEBUARY CHECKED
ETC 1:100 2024 S-01
07030127290
07030127290
ARCH. CHIDI
EAST VIEW
CONSULTANT PROJECT DRAWING TITLE DRAWN
J.C SOLIDROCK CONCEPT PROPOSED GUEST HOUSE SCHEDULE
J.C SOLIDROCK
NOTE CONCEPT
GENERAL CONTRACTOR
CIVIL ENGINEERING WORKS
SHEET
SUPERVISION & PROCUREMENT SCALE DATE NO
ARCHIECTURAL BLUEPRINT
STRUCTURAL DESIGNS FEBUARY CHECKED
ETC 1:100 2024 S-01
07030127290 ARCH. CHIDI
WEST VIEW
CONSULTANT PROJECT DRAWING TITLE DRAWN
J.C SOLIDROCK CONCEPT PROPOSED GUEST HOUSE SCHEDULE
J.C SOLIDROCK
JOSHUA
NOTE CONCEPT
CHISIMDI
GENERAL CONTRACTOR
CIVIL ENGINEERING WORKS
SHEET
SUPERVISION & PROCUREMENT SCALE DATE NO
ARCHIECTURAL BLUEPRINT
STRUCTURAL DESIGNS FEBUARY CHECKED
ETC 1:100 2024 S-01
07030127290 ARCH. CHIDI
DOORS AND WINDOWS SCHEDULE
1200
900 750
2100

2100
2100
ITEM
A|2 n0s 0ff A 26 n0s 0ff 20 n0s 0ff
1200mm X 2100mm Double swing, double leaf 1200mm X 2100mm Double swing, double leaf 900mm X 1200mm Single swing, double leaf
DESCRIPTION fancy metal panelled door fancy metal panelled door fancy metal panelled door
Steel. Steel. Steel.
600
900 600

900
1425

1800
ITEM
A|12 n0s 0ffA|32 n0s 0ff C|20 n0s 0ff
DESCRIPTION 1800mm X 1200mm Powder coated Panelled 1000mm X 1200mm Powder coated Panelled
Casement Aluminium Window. Casement Aluminium Window.
1 2 3 4 5 6 7
15975 NOTES
3825 2000 850 4050 1425 3825
CT1 CT1 CT1 CT1 CT1 CT1
A A
3825

3825
CT1 CT1 CT1 CT1
CT1
B B
CT1
1425

1425
CT1 CT1 CT1
C CT1
C REVISION INITIAL DATE
CT1
1800

1800
CT1 CT1 PROJECT
D D
14700

14700
825

825
E E
PROPOSED COMMERCIAL DEVELOPMENT
FOR
CT1 MR. AMEDU NNAEMEKA AMEDU
2100

2100
AT
AMENU EDEM ANI, NSUKKA L.G.A
ENUGU STATE
CT1
F F
600

600
CT1
G CT1
G
CT1 CT1 CT1
4125

4125
H H
CT1 CT1
CT1
3825 2000 850 4050 1425 3825
15975
1 2 3 4 5 6 7
FOUNDATION LAYOUT
1 2 3 4 5 6 7
15975 NOTES
3825 2000 850 4050 1425 3825
BM 1 - (450 x 225)
A A
BM 11 - (450 x 225)
BM 10 - (450 x 225)

BM 13 - (450 x 225)

BM 14 - (450 x 225)

BM 16 - (450 x 225)
BM 9 - (450 x 225)
3825

3825
3825
BM 2 - (450 x 225)
B B
1425

1425
BM 3 - (450 x 225)
C C REVISION INITIAL DATE
BM 12 - (450 x 225)
1800

1800
BM 4 - (450 x 225)
D D
14700

14700
PROJECT

BM 15 - (450 x 225)
825

825
BM 5 - (450 x 225)
E E PROPOSED COMMERCIAL DEVELOPMENT
FOR
2100

2100
MR. AMEDU NNAEMEKA AMEDU
AT
AMENU EDEM ANI, NSUKKA L.G.A
ENUGU STATE
BM 6 - (450 x 225)
F F
600

600
BM 7 - (450 x 225)
G G
4125

4125
BM 8 - (450 x 225)
H H
3825 2000 850 4050 1425 3825
15975
1 2 3 4 5 6 7
GENERAL ARRANGEMENT OF BEAMS
NOTES
REVISION INITIAL DATE
PROJECT
PROPOSED COMMERCIAL DEVELOPMENT
FOR
MR. AMEDU NNAEMEKA AMEDU
AT
AMENU EDEM ANI, NSUKKA L.G.A
ENUGU STATE
SECTION 1-1 8Y12-01-150C/C
SECTION 2-2 8Y12-01-150C/C
500

400
1 1 2

400
500

8Y12-01-150C/C 8Y12-01-150C/C
650 650 750 750
BASE TYPE 1 2NO THUS BASE TYPE 2 04NO THUS
C0LUMN BASE REINFORCEMENT DETAILS
NOTES
REVISION INITIAL DATE
PROJECT
PROPOSED COMMERCIAL DEVELOPMENT
FOR
MR. AMEDU NNAEMEKA AMEDU
AT
AMENU EDEM ANI, NSUKKA L.G.A
ENUGU STATE
SECTION 1-1 8Y12-01-150C/C
SECTION 2-2 8Y12-01-150C/C
500

400
1 1 2

400
500

8Y12-01-150C/C 8Y12-01-150C/C
650 650 750 750
BASE TYPE 1 2NO THUS BASE TYPE 2 04NO THUS
C0LUMN BASE REINFORCEMENT DETAILS
NOTES

2Y12 - 71
3Y16 - 73
2Y12 - 68
2Y12 - 67

2Y16 - 70
150

7
3Y16 - 54

2Y12 - 55

450
2Y16 - 01

11
2Y16 - 16

2Y12 - 08

2Y16 - 13
2Y12 - 02

2Y16 - 07

2Y16 - 18

2Y16 - 19
2Y16 - 17

2Y12 -- 10
2Y12 - 04

2Y12 - 14
2Y12 - 05

69
2Y12

225
356 956

7
150
150

4
1

450

4Y8 - 69 - 300 12Y8 - 72 - 300


450

56
03
1425 3825
225
225

4
956 500 500 1225 1225 356 356 956
1

12Y8 - 56 - 300
12Y8 - 3 - 300 6Y8 - 6 - 300 15Y8 - 9 - 300 4Y8 - 12 - 300 12Y8 - 15 - 300
3825
3825 2000 4900 1425 3825

2Y12 - 78
4Y16 - 80

3Y16 - 77
2Y16 - 74

2Y12 - 75
REVISION INITIAL DATE

150
4Y16 - 57

2Y12 - 58

8
450
76
PROJECT
225

150
1012 1312

8
450
2Y12 - 21

2Y12 - 23

2Y12 - 27

2Y16 - 32

2Y12 - 33
3Y16 - 26

3Y16 - 37

2Y16 - 38
2Y16 - 20

3Y16 - 36

2Y12 -- 30
29
2Y16 - 35

2Y12 - 24

59 PROPOSED COMMERCIAL DEVELOPMENT


13Y8 - 76 - 300 17Y8 - 79 - 300 FOR
225
2Y12

4050 5250

5
MR. AMEDU NNAEMEKA AMEDU
150

AT
2

13Y8 - 59 - 300 AMENU EDEM ANI, NSUKKA L.G.A


450

22
4050 ENUGU STATE
225
956 500 500 1225 1225 356 356 956
2

12Y8 - 22 - 300 6Y8 - 25 - 300 15Y8 - 28 - 300 4Y8 - 31 - 300 12Y8 - 34 - 300
3825 2000 4900 1425 3825

2Y16 - 81

2Y16 - 91
2Y16 - 90
2Y12 - 82

2Y16 - 87
2Y12 - 88
2Y16 - 84

2Y12 - 85
2Y12 - 61

2Y16 - 66
2Y16 - 60

2Y16 - 63
2Y12 - 64

150

9
450
83

150
2Y16 - 51
2Y16 - 39

2Y12 - 43

2Y16 - 52

2Y16 - 53
2Y12 - 40

2Y16 - 42

46

2Y16 - 48

2Y12 - 49

6
2Y12 -- 45

450
225
62 956 806 806 731

9
2Y12

225 12Y8 - 83 - 300 10Y8 - 86 - 300 9Y8 - 89 - 300


150

956 713

6
3
450

3825 3225 2925


41 12Y8 - 62 - 300 9Y8 - 65 - 300
225 3825 2850
712 1012 1012 356 356 956
3

9Y8 - 41 - 300 13Y8 - 44 - 300 4Y8 - 47 - 300 12Y8 - 50 - 300


2850 4050 1425 3825
BEAM REINFORCEMENT DETAILS
SLAB REINFORCEMENT DETAILS

5Y12 - 78 - 300 T2

14Y12 - 22 - 300 B2

10Y12 - 19 - 300 B2

4Y12 - 64 - 300 T2

13Y12 - 18 - 300 B1

10Y12 - 27 - 300 B2

6Y12 - 52 - 300 T2
4Y12 - 75 - 300 T2

12Y12 - 51 - 300 T1

7Y12 - 70 - 300 T2

13Y12 - 16 - 300 B1

9Y12 - 44 - 300 T1

24Y12 - 25 - 300 B1

5Y12 - 37 - 300 T2

12Y12 - 34 - 300 T1

4Y12 - 62 - 300 T2

26Y12 - 01 - 300 B1

6Y12 - 66 - 300 T2

4Y12 - 30 - 300 T2
18Y12 - 14 - 300 B1
5Y12 - 20 - 300 B2
17Y12 - 28 - 300 B1
6Y12 - 36 - 300 T1
5Y12 - 39 - 300 T2
4Y12 - 40 - 300 T1
5Y12 - 43 - 300 T2
6Y12 - 45 - 300 T2
2Y12 - 46 - 300 T2

14700

4125 600 2100 825 1800 1425 3825

4Y12 - 63 - 300 T2

64

63

62
18

01
16
3825

3825
35 7Y12 - 35 - 300 T2
19 52
17 17 01 12Y12 - 17 - 300 B2

29 4Y12 - 29 - 300 T2

51

34
4Y12 - 54 - 300 T2 54

7Y12 - 72 - 300 T2 69 65 12Y12 - 65 - 300 T1


71 67

10Y12 - 68 - 300 T2

66
72 7Y12 - 04 - 300 B2

70
2000

2000
04
25
27 37
05 13Y12 - 05 - 300 B1

68
45 30

36
28 28 28
73 12Y12 - 73 - 300 T1
5Y12 - 55 - 300 T2 55

44
850

850
17Y12 - 06 - 300 B1
75

25
7Y12 - 77 - 300 T2

74
7Y12 - 74 - 300 T2
77

7Y12 - 76 - 300 T1 76 26 5Y12 - 26 - 300 B2


78

06
15975

15975
39
22

25
07 13Y12 - 07 - 300 B2
4050

4050
7Y12 - 23 - 300 B1 23
24 24 31 4Y12 - 31 - 300 T2
7Y12 - 60 - 300 T2 60 46 38
53 11Y12 - 82 - 300 T2

6Y12 - 85 - 300 T2 79 12Y12 - 79 - 300 T1

16Y12 - 38 - 300 T1
9Y12 - 87 - 300 T2
84
83

80
5Y12 - 08 - 300 B2
1425

1425
14

08

9Y12 - 57 - 300 T2 57 41
10

20
87

85

48 09 13Y12 - 09 - 300 B1
21 81 32
56

47

40

13Y12 - 86 - 300 T1 86 21
82

5Y12 - 89 - 300 T2
91

89

88 12Y12 - 88 - 300 T1
90
14Y12 - 11 - 300 B2 11
14

02

15 5Y12 - 15 - 300 B2
10

12
3825

3825

9Y12 - 59 - 300 T2 59 43
50
5Y12 - 61 - 300 T2 61 03 13Y12 - 03 - 300 B2
13

33 4Y12 - 33 - 300 T2
58

49

42
95

93
94

92

4125 600 2100 825 1800 1425 3825

14700

7Y12 - 48 - 300 T2
7Y12 - 50 - 300 T2
4Y12 - 56 - 300 T1
4Y12 - 67 - 300 T1
13Y12 - 12 - 300 B2
17Y12 - 24 - 300 B1

18Y12 - 21 - 300 B1
18Y12 - 10 - 300 B1

18Y12 - 13 - 300 B1

13Y12 - 02 - 300 B1
12Y12 - 58 - 300 T1

12Y12 - 49 - 300 T1

12Y12 - 42 - 300 T1

4Y12 - 32 - 300 T2
4Y12 - 94 - 300 T2

4Y12 - 92 - 300 T2
4Y12 - 47 - 300 T1
7Y12 - 53 - 300 T2

5Y12 - 91 - 300 T2

4Y12 - 81 - 300 T1
6Y12 - 95 - 300 T2

6Y12 - 93 - 300 T2

5Y12 - 41 - 300 T2
2Y12 - 83 - 300 T2
9Y12 - 84 - 300 T1

5Y12 - 69 - 300 T1
9Y12 - 71 - 300 T1
6Y12 - 80 - 300 T2
17Y12 - 90 - 300 T1
PROJECT

NOTES
REVISION
PROPOSED COMMERCIAL DEVELOPMENT
MR. AMEDU NNAEMEKA AMEDU
AMENU EDEM ANI, NSUKKA L.G.A
ENUGU STATE

AT

FOR

INITIAL
DATE
NOTES
10 no EQ. TREADS AT 300mm EACH (2100) 1200 full landing 225
floor slab reinforcement
05
11 no EQ. RISERS AT 150mm

floor slab reinforcement 05


05 05
EACH(1500mm)

05
05
05
07
05
05
05
05
05
10
05
100

2-2
05
04 04 04 04 05

5Y1207:200B
10Y1008:300 T/B
07

1
REVISION INITIAL DATE
150
1025 1025
8Y1006:300 T/B
PROJECT
8 no EQ. TREADS AT 300mm EACH (2100) 7Y1205:150B

1200
PROPOSED COMMERCIAL DEVELOPMENT
225 1200 7R1204:150 B/T FOR
09 150
MR. AMEDU NNAEMEKA AMEDU
07 07
AT
floor slab reinforcement AMENU EDEM ANI, NSUKKA L.G.A
8 no EQ. RISERS AT 150mm

7Y1203:150 B/T

3600
ENUGU STATE
04 04 04
05
EACH(1200mm) 7Y1202:150 B/T

3000
05
05
05 11
09
05
05
7Y1201:150 B/T
05
05
05
05

300

1
875

2
7Y1205:150B
05 11 05
1-1
600

4Y1207:200B
2400
C E
STAIRCASE REINFORCEMENT DETAILS
NOTES
AS6
AAC6
AS6
AAC6
AS3
AS3
AS5
AS5

AAC3
AAC5

AS6
AAC6
AS2
AS2
AS2 REVISION INITIAL DATE
AS2
AAC2
AAC2
PROJECT
PROPOSED COMMERCIAL DEVELOPMENT
FOR
AS2 MR. AMEDU NNAEMEKA AMEDU
AT
AS2
AMENU EDEM ANI, NSUKKA L.G.A
AAC2
ENUGU STATE

AS1
AS1

AAC1
AS5
AS5
AAC5
NOTES
AS2
AS2 AS2
AS2 AAC2
STORE 2
AS3
AS3
AAC3

AAC2
REVISION INITIAL DATE
PROJECT
PROPOSED COMMERCIAL DEVELOPMENT
FOR
AS2
MR. AMEDU NNAEMEKA AMEDU
AS2 AT
AMENU EDEM ANI, NSUKKA L.G.A
AAC2
AS5
AS5

AS5
AS5

ENUGU STATE
AAC5

AAC5
AS4
AS4
AAC4

AS1
AS1

AAC1
ST SAP SAP ST
FROM THE MAIN
MAIN GATE
NOTES
VALVE
MAIN GATE
VALVE
50mm Ø C.W.S RISER PIPE
100mm Ø SOIL STACK PIPE
50mm Ø C.W.S RISER PIPE
100mm Ø SOIL STACK PIPE
REVISION INITIAL DATE
MAIN GATE
VALVE PROJECT
PROPOSED COMMERCIAL DEVELOPMENT
FOR
MR. AMEDU NNAEMEKA AMEDU
AT
AMENU EDEM ANI, NSUKKA L.G.A
ENUGU STATE
MAIN GATE
VALVE

50mm Ø C.W.S RISER PIPE


100mm Ø SOIL STACK PIPE
NOTES
50mm Ø C.W.S RISER PIPE
100mm Ø SOIL STACK PIPE
REVISION INITIAL DATE
PROJECT
5 0m
m PROPOSED COMMERCIAL DEVELOPMENT
Ø FOR
1 C.
00m W. MR. AMEDU NNAEMEKA AMEDU
m S
AT
AMENU EDEM ANI, NSUKKA L.G.A
R IS
Ø
S ER ENUGU STATE
O PI
IL PE
ST A
C
K
PI
PE

50mm Ø C.W.S RISER PIPE


50mm Ø C.W.S RISER PIPE

100mm Ø SOIL STACK PIPE


100mm Ø SOIL STACK PIPE
GENERAL SPECIFICATION FOR PLUMBING FITTINGS