Working Drawing
Working Drawing
@
AMENU EDEM ANI
NSUKKA L.G.A
ENUGU STATE
CONSULT CLIENT.
J.C SOLIDROCK CONCEPT
CIVIL ENGINEERS AND ENGINEERING CONSULTANCY MR. AMEDU NNAEMEKA
AMEDU
PROPERTY MANAGERS
REAL ESTATE
FEBUARY 2024
39 UNITY ESTATE OFF MARYLAND, ENUGU.
+2347030127290
2000
18000
PROPOSED BUILDING
1000
30000
8200 1000
15000
SITE ANALYSIS
AREA OF PLOT ----- 540msq
10750
AREA OF BUILDING----242.95msq
PERCENTAGE COVERAGE---44.9%
SITE PLAN
CONSULTANT PROJECT DRAWING TITLE DRAWN
J.C SOLIDROCK CONCEPT PROPOSED GUEST HOUSE SCHEDULE J.C SOLIDROCK CONCEPT
NOTE
GENERAL CONTRACTOR
CIVIL ENGINEERING WORKS
SHEET
SUPERVISION & PROCUREMENT SCALE DATE NO
ARCHIECTURAL BLUEPRINT
STRUCTURAL DESIGNS FEBURARY CHECKED
ETC 1:100 2024 S-01
07030127290 ARCH. CHIDI
2
1 2 3 4 5 6 7
15975
3825 2000 850 4050 1425 3825
A A
3825
3825
B B
1425
1425
C C
1800
1800
D D
14700
14700
1 1
825
825
E E
2100
2100
F F
600
600
G G
4125
4125
H H
3825 2000 850 4050 1425 3825
15975
1 2 3 4 5 6 7
2
ROOF PLAN
CONSULTANT PROJECT DRAWING TITLE DRAWN
J.C SOLIDROCK CONCEPT PROPOSED GUEST HOUSE SCHEDULE J.C SOLIDROCK CONCEPT
NOTE
GENERAL CONTRACTOR
CIVIL ENGINEERING WORKS
SHEET
SUPERVISION & PROCUREMENT SCALE DATE NO
ARCHIECTURAL BLUEPRINT
STRUCTURAL DESIGNS FEBURARY CHECKED
ETC 1:100 2024 S-01
07030127290 ARCH. CHIDI
2
1 2 3 4 5 6 7
15975
3825 2000 850 4050 1425 3825
600 675 600 600 600
1725 2175 875 900 1450 900 825 225
1200 825 1200 825
A A
825
825
3600 1775 1200
3250
1650
600
CHANGING T/B
ROOM STORE
3600
1200
3825
3600
3600
3825
600 1000 1025600 1200
LAUNDRY
2175
B B
1425
1200
1425
VER. LOBBY 13350
225
C 1200
C
RESTROOM
1575
1800
1800
3600
675
D D
3675
14700
14700
ROOM 2
1
3000
1
825
825
4500
RECEPTION
8325
2700
2625
2100
2100
OFFICE
350
1200 900 1200 1125 2450 10001
1200
F T/B F
600
600
G G
6600
MINI BAR
4125
4125
3900
ROOM 1
2100
3825
1425
3600
T/B
H H
1800 800 900 1200 1800 1500 1125 1200 825
600 600 600 600 600
225 625 525 225 450
3825 2000 850 4050 1425 3825
15975
1 2 3 4 5 6 7
2
GROUND FLOOR PLAN
CONSULTANT PROJECT DRAWING TITLE DRAWN
J.C SOLIDROCK CONCEPT PROPOSED GUEST HOUSE SCHEDULE J.C SOLIDROCK CONCEPT
NOTE
GENERAL CONTRACTOR
CIVIL ENGINEERING WORKS
SHEET
SUPERVISION & PROCUREMENT SCALE DATE NO
ARCHIECTURAL BLUEPRINT
STRUCTURAL DESIGNS FEBURARY CHECKED
ETC 1:100 2024 S-01
07030127290 ARCH. CHIDI
2
1 2 3 4 5 6 7
15975
3825 2000 850 4050 1425 3825
1200
A 3600 1775 3250 A
2100
2600
4200
4400
3825
3600
3825
T/B
ROOM 6
2850 ROOM 7
STORE 2
B B
13950
1425
1425
1200
2175 LOBBY
1500
T/B
C C
1800
1800
D D
3675
14700
14700
ROOM 8
1 1
825
825
4500
RELAXATION
4000
E E
8325
ROOM 4 4200
3600
2100
2100
2625
1200
F T/B F
600
600
3825
G G
6600
ROON 10
4125
4125
3900
ROOM 9
2100
T/B
3600
1875 T/B
H H
3825 2000 850 4050 1425 3825
15975
1 2 3 4 5 6 7
2
1ST & 2ND FLOOR PLAN
CONSULTANT PROJECT DRAWING TITLE DRAWN
J.C SOLIDROCK CONCEPT PROPOSED GUEST HOUSE SCHEDULE J.C SOLIDROCK CONCEPT
NOTE
GENERAL CONTRACTOR
CIVIL ENGINEERING WORKS
SHEET
SUPERVISION & PROCUREMENT SCALE DATE NO
ARCHIECTURAL BLUEPRINT
STRUCTURAL DESIGNS FEBURARY CHECKED
ETC 1:100 2024 S-01
07030127290 ARCH. CHIDI
-
---
5000
5000
600
3000
14900
150
9300
3000
150
3000
450 150
600
Depth of foundation to be determined
on site after soil test and investigation.
300mm consolidated hardcore filling.
Also, the foundation depth depends on
150mm thick well compacted laterite filling.
the soil bearing capacity
225/675mm foundation footing.
75mm concrete blinding.
SECTION 1
CONSULTANT PROJECT DRAWING TITLE DRAWN
J.C SOLIDROCK CONCEPT PROPOSED GUEST HOUSE SCHEDULE J.C SOLIDROCK
NOTE CONCEPT
GENERAL CONTRACTOR
CIVIL ENGINEERING WORKS
SHEET
SUPERVISION & PROCUREMENT SCALE DATE NO
ARCHIECTURAL BLUEPRINT
STRUCTURAL DESIGNS FEBUARY CHECKED
ETC 1:100 2024 S-01
07030127290 ARCH. CHIDI
-
---
Depth of foundation to be determined
on site after soil test and investigation.
300mm consolidated hardcore filling.
Also, the foundation depth depends on
the soil bearing capacity 150mm thick well compacted laterite filling.
225/675mm foundation footing.
75mm concrete blinding.
SECTION 2
CONSULTANT PROJECT DRAWING TITLE DRAWN
J.C SOLIDROCK CONCEPT PROPOSED GUEST HOUSE SCHEDULE J.C SOLIDROCK
NOTE CONCEPT
GENERAL CONTRACTOR
CIVIL ENGINEERING WORKS
SHEET
SUPERVISION & PROCUREMENT SCALE DATE NO
ARCHIECTURAL BLUEPRINT
STRUCTURAL DESIGNS FEBUARY CHECKED
ETC 1:100 2024 S-01
07030127290 ARCH. CHIDI
SOUTH VIEW
CONSULTANT PROJECT DRAWING TITLE DRAWN
J.C SOLIDROCK CONCEPT PROPOSED GUEST HOUSE SCHEDULE
J.C SOLIDROCK
NOTE CONCEPT
GENERAL CONTRACTOR
CIVIL ENGINEERING WORKS
SHEET
SUPERVISION & PROCUREMENT SCALE DATE NO
ARCHIECTURAL BLUEPRINT
STRUCTURAL DESIGNS FEBUARY CHECKED
ETC 1:100 2024 S-01
07030127290 ARCH. CHIDI
NORTH VIEW
CONSULTANT PROJECT DRAWING TITLE DRAWN
J.C SOLIDROCK CONCEPT PROPOSED GUEST HOUSE SCHEDULE
J.C SOLIDROCK
NOTE CONCEPT
GENERAL CONTRACTOR
CIVIL ENGINEERING WORKS
SHEET
SUPERVISION & PROCUREMENT SCALE DATE NO
ARCHIECTURAL BLUEPRINT
STRUCTURAL DESIGNS FEBUARY CHECKED
ETC 1:100 2024 S-01
07030127290
07030127290
ARCH. CHIDI
EAST VIEW
CONSULTANT PROJECT DRAWING TITLE DRAWN
J.C SOLIDROCK CONCEPT PROPOSED GUEST HOUSE SCHEDULE
J.C SOLIDROCK
NOTE CONCEPT
GENERAL CONTRACTOR
CIVIL ENGINEERING WORKS
SHEET
SUPERVISION & PROCUREMENT SCALE DATE NO
ARCHIECTURAL BLUEPRINT
STRUCTURAL DESIGNS FEBUARY CHECKED
ETC 1:100 2024 S-01
07030127290 ARCH. CHIDI
WEST VIEW
CONSULTANT PROJECT DRAWING TITLE DRAWN
J.C SOLIDROCK CONCEPT PROPOSED GUEST HOUSE SCHEDULE
J.C SOLIDROCK
JOSHUA
NOTE CONCEPT
CHISIMDI
GENERAL CONTRACTOR
CIVIL ENGINEERING WORKS
SHEET
SUPERVISION & PROCUREMENT SCALE DATE NO
ARCHIECTURAL BLUEPRINT
STRUCTURAL DESIGNS FEBUARY CHECKED
ETC 1:100 2024 S-01
07030127290 ARCH. CHIDI
DOORS AND WINDOWS SCHEDULE
1200
900 750
2100
2100
2100
ITEM
A|2 n0s 0ff A 26 n0s 0ff 20 n0s 0ff
1200mm X 2100mm Double swing, double leaf 1200mm X 2100mm Double swing, double leaf 900mm X 1200mm Single swing, double leaf
DESCRIPTION fancy metal panelled door fancy metal panelled door fancy metal panelled door
Steel. Steel. Steel.
600
900 600
900
1425
1800
ITEM
A|12 n0s 0ffA|32 n0s 0ff C|20 n0s 0ff
DESCRIPTION 1800mm X 1200mm Powder coated Panelled 1000mm X 1200mm Powder coated Panelled
Casement Aluminium Window. Casement Aluminium Window.
1 2 3 4 5 6 7
15975 NOTES
3825 2000 850 4050 1425 3825
CT1 CT1 CT1 CT1 CT1 CT1
A A
3825
3825
CT1 CT1 CT1 CT1
CT1
B B
CT1
1425
1425
CT1 CT1 CT1
C CT1
C REVISION INITIAL DATE
CT1
1800
1800
CT1 CT1 PROJECT
D D
14700
14700
825
825
E E
PROPOSED COMMERCIAL DEVELOPMENT
FOR
CT1 MR. AMEDU NNAEMEKA AMEDU
2100
2100
AT
AMENU EDEM ANI, NSUKKA L.G.A
ENUGU STATE
CT1
F F
600
600
CT1
G CT1
G
CT1 CT1 CT1
4125
4125
H H
CT1 CT1
CT1
3825 2000 850 4050 1425 3825
15975
1 2 3 4 5 6 7
FOUNDATION LAYOUT
1 2 3 4 5 6 7
15975 NOTES
3825 2000 850 4050 1425 3825
BM 1 - (450 x 225)
A A
BM 11 - (450 x 225)
BM 10 - (450 x 225)
BM 13 - (450 x 225)
BM 14 - (450 x 225)
BM 16 - (450 x 225)
BM 9 - (450 x 225)
3825
3825
3825
BM 2 - (450 x 225)
B B
1425
1425
BM 3 - (450 x 225)
C C REVISION INITIAL DATE
BM 12 - (450 x 225)
1800
1800
BM 4 - (450 x 225)
D D
14700
14700
PROJECT
BM 15 - (450 x 225)
825
825
BM 5 - (450 x 225)
E E PROPOSED COMMERCIAL DEVELOPMENT
FOR
2100
2100
MR. AMEDU NNAEMEKA AMEDU
AT
AMENU EDEM ANI, NSUKKA L.G.A
ENUGU STATE
BM 6 - (450 x 225)
F F
600
600
BM 7 - (450 x 225)
G G
4125
4125
BM 8 - (450 x 225)
H H
3825 2000 850 4050 1425 3825
15975
1 2 3 4 5 6 7
GENERAL ARRANGEMENT OF BEAMS
NOTES
REVISION INITIAL DATE
PROJECT
PROPOSED COMMERCIAL DEVELOPMENT
FOR
MR. AMEDU NNAEMEKA AMEDU
AT
AMENU EDEM ANI, NSUKKA L.G.A
ENUGU STATE
SECTION 1-1 8Y12-01-150C/C
SECTION 2-2 8Y12-01-150C/C
500
400
1 1 2
400
500
8Y12-01-150C/C 8Y12-01-150C/C
650 650 750 750
BASE TYPE 1 2NO THUS BASE TYPE 2 04NO THUS
C0LUMN BASE REINFORCEMENT DETAILS
NOTES
REVISION INITIAL DATE
PROJECT
PROPOSED COMMERCIAL DEVELOPMENT
FOR
MR. AMEDU NNAEMEKA AMEDU
AT
AMENU EDEM ANI, NSUKKA L.G.A
ENUGU STATE
SECTION 1-1 8Y12-01-150C/C
SECTION 2-2 8Y12-01-150C/C
500
400
1 1 2
400
500
8Y12-01-150C/C 8Y12-01-150C/C
650 650 750 750
BASE TYPE 1 2NO THUS BASE TYPE 2 04NO THUS
C0LUMN BASE REINFORCEMENT DETAILS
NOTES
2Y12 - 71
3Y16 - 73
2Y12 - 68
2Y12 - 67
2Y16 - 70
150
7
3Y16 - 54
2Y12 - 55
450
2Y16 - 01
11
2Y16 - 16
2Y12 - 08
2Y16 - 13
2Y12 - 02
2Y16 - 07
2Y16 - 18
2Y16 - 19
2Y16 - 17
2Y12 -- 10
2Y12 - 04
2Y12 - 14
2Y12 - 05
69
2Y12
225
356 956
7
150
150
4
1
450
56
03
1425 3825
225
225
4
956 500 500 1225 1225 356 356 956
1
12Y8 - 56 - 300
12Y8 - 3 - 300 6Y8 - 6 - 300 15Y8 - 9 - 300 4Y8 - 12 - 300 12Y8 - 15 - 300
3825
3825 2000 4900 1425 3825
2Y12 - 78
4Y16 - 80
3Y16 - 77
2Y16 - 74
2Y12 - 75
REVISION INITIAL DATE
150
4Y16 - 57
2Y12 - 58
8
450
76
PROJECT
225
150
1012 1312
8
450
2Y12 - 21
2Y12 - 23
2Y12 - 27
2Y16 - 32
2Y12 - 33
3Y16 - 26
3Y16 - 37
2Y16 - 38
2Y16 - 20
3Y16 - 36
2Y12 -- 30
29
2Y16 - 35
2Y12 - 24
4050 5250
5
MR. AMEDU NNAEMEKA AMEDU
150
AT
2
22
4050 ENUGU STATE
225
956 500 500 1225 1225 356 356 956
2
12Y8 - 22 - 300 6Y8 - 25 - 300 15Y8 - 28 - 300 4Y8 - 31 - 300 12Y8 - 34 - 300
3825 2000 4900 1425 3825
2Y16 - 81
2Y16 - 91
2Y16 - 90
2Y12 - 82
2Y16 - 87
2Y12 - 88
2Y16 - 84
2Y12 - 85
2Y12 - 61
2Y16 - 66
2Y16 - 60
2Y16 - 63
2Y12 - 64
150
9
450
83
150
2Y16 - 51
2Y16 - 39
2Y12 - 43
2Y16 - 52
2Y16 - 53
2Y12 - 40
2Y16 - 42
46
2Y16 - 48
2Y12 - 49
6
2Y12 -- 45
450
225
62 956 806 806 731
9
2Y12
956 713
6
3
450
5Y12 - 78 - 300 T2
14Y12 - 22 - 300 B2
10Y12 - 19 - 300 B2
4Y12 - 64 - 300 T2
13Y12 - 18 - 300 B1
10Y12 - 27 - 300 B2
6Y12 - 52 - 300 T2
4Y12 - 75 - 300 T2
12Y12 - 51 - 300 T1
7Y12 - 70 - 300 T2
13Y12 - 16 - 300 B1
9Y12 - 44 - 300 T1
24Y12 - 25 - 300 B1
5Y12 - 37 - 300 T2
12Y12 - 34 - 300 T1
4Y12 - 62 - 300 T2
26Y12 - 01 - 300 B1
6Y12 - 66 - 300 T2
4Y12 - 30 - 300 T2
18Y12 - 14 - 300 B1
5Y12 - 20 - 300 B2
17Y12 - 28 - 300 B1
6Y12 - 36 - 300 T1
5Y12 - 39 - 300 T2
4Y12 - 40 - 300 T1
5Y12 - 43 - 300 T2
6Y12 - 45 - 300 T2
2Y12 - 46 - 300 T2
14700
4Y12 - 63 - 300 T2
64
63
62
18
01
16
3825
3825
35 7Y12 - 35 - 300 T2
19 52
17 17 01 12Y12 - 17 - 300 B2
29 4Y12 - 29 - 300 T2
51
34
4Y12 - 54 - 300 T2 54
10Y12 - 68 - 300 T2
66
72 7Y12 - 04 - 300 B2
70
2000
2000
04
25
27 37
05 13Y12 - 05 - 300 B1
68
45 30
36
28 28 28
73 12Y12 - 73 - 300 T1
5Y12 - 55 - 300 T2 55
44
850
850
17Y12 - 06 - 300 B1
75
25
7Y12 - 77 - 300 T2
74
7Y12 - 74 - 300 T2
77
06
15975
15975
39
22
25
07 13Y12 - 07 - 300 B2
4050
4050
7Y12 - 23 - 300 B1 23
24 24 31 4Y12 - 31 - 300 T2
7Y12 - 60 - 300 T2 60 46 38
53 11Y12 - 82 - 300 T2
16Y12 - 38 - 300 T1
9Y12 - 87 - 300 T2
84
83
80
5Y12 - 08 - 300 B2
1425
1425
14
08
9Y12 - 57 - 300 T2 57 41
10
20
87
85
48 09 13Y12 - 09 - 300 B1
21 81 32
56
47
40
13Y12 - 86 - 300 T1 86 21
82
5Y12 - 89 - 300 T2
91
89
88 12Y12 - 88 - 300 T1
90
14Y12 - 11 - 300 B2 11
14
02
15 5Y12 - 15 - 300 B2
10
12
3825
3825
9Y12 - 59 - 300 T2 59 43
50
5Y12 - 61 - 300 T2 61 03 13Y12 - 03 - 300 B2
13
33 4Y12 - 33 - 300 T2
58
49
42
95
93
94
92
14700
7Y12 - 48 - 300 T2
7Y12 - 50 - 300 T2
4Y12 - 56 - 300 T1
4Y12 - 67 - 300 T1
13Y12 - 12 - 300 B2
17Y12 - 24 - 300 B1
18Y12 - 21 - 300 B1
18Y12 - 10 - 300 B1
18Y12 - 13 - 300 B1
13Y12 - 02 - 300 B1
12Y12 - 58 - 300 T1
12Y12 - 49 - 300 T1
12Y12 - 42 - 300 T1
4Y12 - 32 - 300 T2
4Y12 - 94 - 300 T2
4Y12 - 92 - 300 T2
4Y12 - 47 - 300 T1
7Y12 - 53 - 300 T2
5Y12 - 91 - 300 T2
4Y12 - 81 - 300 T1
6Y12 - 95 - 300 T2
6Y12 - 93 - 300 T2
5Y12 - 41 - 300 T2
2Y12 - 83 - 300 T2
9Y12 - 84 - 300 T1
5Y12 - 69 - 300 T1
9Y12 - 71 - 300 T1
6Y12 - 80 - 300 T2
17Y12 - 90 - 300 T1
PROJECT
NOTES
REVISION
PROPOSED COMMERCIAL DEVELOPMENT
MR. AMEDU NNAEMEKA AMEDU
AMENU EDEM ANI, NSUKKA L.G.A
ENUGU STATE
AT
FOR
INITIAL
DATE
NOTES
10 no EQ. TREADS AT 300mm EACH (2100) 1200 full landing 225
floor slab reinforcement
05
11 no EQ. RISERS AT 150mm
05
05
05
07
05
05
05
05
05
10
05
100
2-2
05
04 04 04 04 05
5Y1207:200B
10Y1008:300 T/B
07
1
REVISION INITIAL DATE
150
1025 1025
8Y1006:300 T/B
PROJECT
8 no EQ. TREADS AT 300mm EACH (2100) 7Y1205:150B
1200
PROPOSED COMMERCIAL DEVELOPMENT
225 1200 7R1204:150 B/T FOR
09 150
MR. AMEDU NNAEMEKA AMEDU
07 07
AT
floor slab reinforcement AMENU EDEM ANI, NSUKKA L.G.A
8 no EQ. RISERS AT 150mm
7Y1203:150 B/T
3600
ENUGU STATE
04 04 04
05
EACH(1200mm) 7Y1202:150 B/T
3000
05
05
05 11
09
05
05
7Y1201:150 B/T
05
05
05
05
300
1
875
2
7Y1205:150B
05 11 05
1-1
600
4Y1207:200B
2400
C E
STAIRCASE REINFORCEMENT DETAILS
NOTES
AS6
AAC6
AS6
AAC6
AS3
AS3
AS5
AS5
AAC3
AAC5
AS6
AAC6
AS2
AS2
AS2 REVISION INITIAL DATE
AS2
AAC2
AAC2
PROJECT
PROPOSED COMMERCIAL DEVELOPMENT
FOR
AS2 MR. AMEDU NNAEMEKA AMEDU
AT
AS2
AMENU EDEM ANI, NSUKKA L.G.A
AAC2
ENUGU STATE
AS1
AS1
AAC1
AS5
AS5
AAC5
NOTES
AS2
AS2 AS2
AS2 AAC2
STORE 2
AS3
AS3
AAC3
AAC2
REVISION INITIAL DATE
PROJECT
PROPOSED COMMERCIAL DEVELOPMENT
FOR
AS2
MR. AMEDU NNAEMEKA AMEDU
AS2 AT
AMENU EDEM ANI, NSUKKA L.G.A
AAC2
AS5
AS5
AS5
AS5
ENUGU STATE
AAC5
AAC5
AS4
AS4
AAC4
AS1
AS1
AAC1
ST SAP SAP ST
FROM THE MAIN
MAIN GATE
NOTES
VALVE
MAIN GATE
VALVE
50mm Ø C.W.S RISER PIPE
100mm Ø SOIL STACK PIPE
50mm Ø C.W.S RISER PIPE
100mm Ø SOIL STACK PIPE
REVISION INITIAL DATE
MAIN GATE
VALVE PROJECT
PROPOSED COMMERCIAL DEVELOPMENT
FOR
MR. AMEDU NNAEMEKA AMEDU
AT
AMENU EDEM ANI, NSUKKA L.G.A
ENUGU STATE
MAIN GATE
VALVE