Prelim MS-RA Bill 01

This document provides an itemized list of excavation work for the construction of a residence. It includes quantities for excavating different areas of the site to varying depths for purposes such as basement excavation, footing excavation, and retaining wall construction. A total of 18,431 cubic feet was excavated to depths between 0-1.5 meters and an additional unspecified quantity was excavated between 1.5-3 meters deep. The document provides detailed measurements for excavation in different zones of the construction site.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
20 views5 pages

Prelim MS-RA Bill 01

This document provides an itemized list of excavation work for the construction of a residence. It includes quantities for excavating different areas of the site to varying depths for purposes such as basement excavation, footing excavation, and retaining wall construction. A total of 18,431 cubic feet was excavated to depths between 0-1.5 meters and an additional unspecified quantity was excavated between 1.5-3 meters deep. The document provides detailed measurements for excavation in different zones of the construction site.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 5

Name of Work : Ongoing Construction of RESIDENCE FOR MR. ANTONY VENDHAN & MRS.

NIRMALA
AROKIA AT HESARGHATTA.

RUNNING BILL NO. - 01

Sl. No. Particulars Unit Nos. Length Breadth Depth Quantity

I Earth Work and Site protection

1 Mass Excavation in all kinds of soil but excluding soft rock and hard rock for Basement below ground level by
mechanical means including disposing the excavated earth to a place outside the project site not objected by civic
authorities by mechanical means to all leads, including loading, unloading etc.,complete. (Disposing excavated earth
out side the project site will be measured and paid seperately)
Note: Block levels at intervals as directed by the Architects should be jointly recorded by the contractor's
representative and the Architects / Engineer-in-charge before excavating the earth. Such levels shall be used for
calculating the quantity of earth excavated. Measurement will be according to IS 1200

Site Clearance to achieve formation level for CFT 1.00 54.12 101.68 0.50 2751.46
marking.

Total Qty. 2751.46

2 Excavation in all kinds of soil but excluding soft rock and hard rock for foundation of walls, steps, footings, rafts, plinth
beams, column pits and in trenches upto 1.50 mts depth below existing ground level including disposing the excess
earth up to a initial lead of 30 mtrs by manual/ mechanical means including loading and unloading, depositing the
earth well clear of the foundation,etc., complete. (Upto 1.5 mts. or 5'-0" depth)
Footing excavation for Columns upto 5'-0"
EXCAVATION IN ZONE - 01
F1 for C32 - Zone - 01 CFT 1.00 6.56 7.54 5.00 247.44
F1 for C29 - Zone - 01 (Part 1) CFT 1.00 7.49 7.57 5.00 283.44
F2 for C30 - Zone - 01 (Part 2) CFT 1.00 6.89 8.53 5.00 293.70
F2 for C31 - Zone - 01 (Part 1) CFT 1.00 6.89 8.53 5.00 293.70
F1A for C35 - Zone - 01 (Part 2) CFT 1.00 2.11 4.41 5.00 46.56
F1 for C28 - Zone - 01 CFT 1.00 6.56 7.54 5.00 247.44
EXCAVATION IN ZONE - 02
F2A for C11 - Zone - 02 CFT 1.00 6.89 6.89 5.00 237.22
F3 for C17 - Zone - 02 CFT 1.00 7.22 9.51 5.00 343.19
F2 for C23 - Zone - 02 CFT 1.00 8.53 6.89 5.00 293.70
CF1 for C12 & C13 - Zone - 02 (Part 1) CFT 1.00 12.79 6.89 5.00 440.56
CF1 for C14 - Zone - 02 (Part 2) CFT 1.00 8.86 10.66 5.00 472.02
F3 for C18 - Zone - 02 (Part 1) CFT 1.00 7.22 10.01 5.00 361.18
CF2,3 for SC,C24 & C22 - Zone - 02 (Part 2) CFT 1.00 17.64 9.86 5.00 869.33
F2 for C25 - Zone - 02 (Part 3) CFT 1.00 6.89 8.53 5.00 293.70
F3 for C15 - Zone - 02 (Part 1) CFT 1.00 11.40 7.25 5.00 413.30
F2 for C16 - Zone - 02 (Part 2) CFT 1.00 6.89 8.53 5.00 293.70
F3 for C19 - Zone - 02 (Part 1) CFT 1.00 11.23 7.87 5.00 442.17
F3 for C20 - Zone - 02 (Part 2) CFT 1.00 7.22 9.51 5.00 343.19
F2 for C21 - Zone - 02 (Part 3) CFT 1.00 6.89 6.25 5.00 215.19
F3A for C26 - Zone - 02 (Part 1) CFT 1.00 7.87 7.87 5.00 309.84
F3A for C27 - Zone - 02 (Part 2) CFT 1.00 9.33 7.89 5.00 368.06
EXCAVATION IN ZONE - 03
F3 for C10 - Zone - 03 CFT 1.00 9.51 7.22 5.00 343.19
F2A for C9 - Zone - 03 CFT 1.00 6.89 6.89 5.00 237.22
F3 for C8 - Zone - 03 CFT 1.00 9.51 7.22 5.00 343.19
F4 for C7 - Zone - 03 (Part 1) CFT 1.00 6.90 10.41 5.00 359.34
F4 for C6 - Zone - 03 (Part 2) CFT 1.00 8.70 6.89 5.00 299.69
Free Space Zone - 03(Part 3) CFT 1.00 1.76 6.89 5.00 60.77
F1 for C5 - Zone - 03 (Part 1) CFT 1.00 7.54 7.00 5.00 264.15
Sl. No. Particulars Unit Nos. Length Breadth Depth Quantity

EXCAVATION IN ZONE - 03 for RETAINING


WALL AND COLUMN FOOTING C1, C2, C3 &
C4
Retaining Wall - Zone - 03 (Part - 1) CFT 1.00 10.06 22.45 5.00 1129.45
Retaining Wall - and F2, F2 & F2 for C1, C2 & CFT 1.00 33.54 9.58 5.00 1606.03
C3 - Zone - 03 (Part - 2)
Retaining Wall - and F1 for C4 - Zone - 03 CFT 1.00 11.57 93.84 5.00 5430.51
(Part - 3)
EXCAVATION IN ZONE - 01 for SSM
RETAINING WALL
SSM Retaining Wall - Zone - 01 (Part - 1) CFT 1.00 5.67 3.12 5.00 88.41
SSM Retaining Wall - Zone - 01 (Part - 2) CFT 1.00 20.62 3.12 5.00 321.28
EXCAVATION IN ZONE - 02 for SSM
RETAINING WALL
SSM Retaining Wall - Zone - 02 (Part - 1) CFT 1.00 15.01 3.12 5.00 233.79
SSM Retaining Wall - Zone - 02 (Part - 2) CFT 1.00 10.55 3.12 5.00 164.35
EXCAVATION IN ZONE - 03 for SSM
RETAINING WALL
SSM Retaining Wall - Zone - 03 (Part - 1) CFT 1.00 11.68 3.12 5.00 181.92
SSM Retaining Wall - Zone - 03 (Part - 2) CFT 1.00 16.65 3.12 5.00 259.40

Total Qty. 18431.36

3 Excavation in all kinds of soil but excluding soft rock and hard rock for foundation of walls, steps, footings, rafts, plinth
beams, column pits and in trenches from 1.5m to 3m depth below existing ground level including disposing the excess
earth up to a initial lead of 30 mtrs by manual/ mechanical means including loading and unloading, depositing the
earth well clear of the foundation,etc., complete.. (from 1.5 to 3.0 mts. or 5'-0" to 10'-0" depth)
Footing excavation for Columns below 5'-0" and up to 7'-0"
EXCAVATION IN ZONE - 01
F1 for C32 - Zone - 01 CFT 1.00 6.56 7.54 2.00 98.98
F1 for C29 - Zone - 01 (Part 1) CFT 1.00 7.49 7.57 2.00 113.38
F2 for C30 - Zone - 01 (Part 2) CFT 1.00 6.89 8.53 2.00 117.48
F2 for C31 - Zone - 01 (Part 1) CFT 1.00 6.89 8.53 2.00 117.48
F1A for C35 - Zone - 01 (Part 2) CFT 1.00 2.11 4.41 2.00 18.62
F1 for C28 - Zone - 01 CFT 1.00 6.56 7.54 2.00 98.98
EXCAVATION IN ZONE - 02
F2A for C11 - Zone - 02 CFT 1.00 6.89 6.89 2.00 94.89
F3 for C17 - Zone - 02 CFT 1.00 7.22 9.51 2.00 137.28
F2 for C23 - Zone - 02 CFT 1.00 8.53 6.89 2.00 117.48
CF1 for C12 & C13 - Zone - 02 (Part 1) CFT 1.00 12.79 6.89 2.00 176.22
CF1 for C14 - Zone - 02 (Part 2) CFT 1.00 8.86 10.66 2.00 188.81
F3 for C18 - Zone - 02 (Part 1) CFT 1.00 7.22 10.01 2.00 144.47
CF2,3 for SC,C24 & C22 - Zone - 02 (Part 2) CFT 1.00 17.64 9.86 2.00 347.73
F2 for C25 - Zone - 02 (Part 3) CFT 1.00 6.89 8.53 2.00 117.48
F3 for C15 - Zone - 02 (Part 1) CFT 1.00 11.40 7.25 2.00 165.32
F2 for C16 - Zone - 02 (Part 2) CFT 1.00 6.89 8.53 2.00 117.48
F3 for C19 - Zone - 02 (Part 1) CFT 1.00 11.23 7.87 2.00 176.87
F3 for C20 - Zone - 02 (Part 2) CFT 1.00 7.22 9.51 2.00 137.28
F2 for C21 - Zone - 02 (Part 3) CFT 1.00 6.89 6.25 2.00 86.08
F3A for C26 - Zone - 02 (Part 1) CFT 1.00 7.87 7.87 2.00 123.94
F3A for C27 - Zone - 02 (Part 2) CFT 1.00 9.33 7.89 2.00 147.22
EXCAVATION IN ZONE - 03
F3 for C10 - Zone - 03 CFT 1.00 9.51 7.22 2.00 137.28
F2A for C9 - Zone - 03 CFT 1.00 6.89 6.89 2.00 94.89
F3 for C8 - Zone - 03 CFT 1.00 9.51 7.22 2.00 137.28
F4 for C7 - Zone - 03 (Part 1) CFT 1.00 6.90 10.41 2.00 143.74
F4 for C6 - Zone - 03 (Part 2) CFT 1.00 8.70 6.89 2.00 119.88
Sl. No. Particulars Unit Nos. Length Breadth Depth Quantity

Free Space Zone - 03(Part 3) CFT 1.00 1.76 6.89 2.00 24.31
F1 for C5 - Zone - 03 (Part 1) CFT 1.00 7.54 7.00 2.00 105.66
EXCAVATION IN ZONE - 03 for RETAINING
WALL AND COLUMN FOOTING C1, C2, C3 &
C4
Retaining Wall - Zone - 03 (Part - 1) CFT 1.00 10.06 22.45 2.00 451.78
Retaining Wall - and F2, F2 & F2 for C1, C2 & CFT 1.00 33.54 9.58 2.00 642.41
C3 - Zone - 03 (Part - 2)
Retaining Wall - and F1 for C4 - Zone - 03 CFT 1.00 11.57 93.84 2.00 2172.21
(Part - 3)
EXCAVATION IN ZONE - 01 for SSM
RETAINING WALL
SSM Retaining Wall - Zone - 01 (Part - 1) CFT 1.00 5.67 3.12 2.00 35.36
SSM Retaining Wall - Zone - 01 (Part - 2) CFT 1.00 20.62 3.12 2.00 128.51
EXCAVATION IN ZONE - 02 for SSM
RETAINING WALL
SSM Retaining Wall - Zone - 02 (Part - 1) CFT 1.00 15.01 3.12 2.00 93.52
SSM Retaining Wall - Zone - 02 (Part - 2) CFT 1.00 10.55 3.12 2.00 65.74
EXCAVATION IN ZONE - 03 for SSM
RETAINING WALL
SSM Retaining Wall - Zone - 03 (Part - 1) CFT 1.00 11.68 3.12 2.00 72.77
SSM Retaining Wall - Zone - 03 (Part - 2) CFT 1.00 16.65 3.12 2.00 103.76

Total Qty. 7372.55

II Plain Cement Concrete Work

12 Providing and laying 100mm thick plain cement concrete 1:4:8 below foundations/footings using coarse graded
aggregate of 40mm and down size, good quality river sand, machine mixing, compaction by wooden or cast iron
rammers, curing, lead, lift etc., complete.
EXCAVATION IN ZONE - 01
F1 for C32 - Zone - 01 CFT 1.00 6.56 7.54 0.33 16.33
F1 for C29 - Zone - 01 (Part 1) CFT 1.00 7.49 7.57 0.33 18.71
F2 for C30 - Zone - 01 (Part 2) CFT 1.00 6.89 8.53 0.33 19.38
F2 for C31 - Zone - 01 (Part 1) CFT 1.00 6.89 8.53 0.33 19.38
F1A for C35 - Zone - 01 (Part 2) CFT 1.00 2.11 4.41 0.33 3.07
F1 for C28 - Zone - 01 CFT 1.00 6.56 7.54 0.33 16.33
EXCAVATION IN ZONE - 02
F2A for C11 - Zone - 02 CFT 1.00 6.89 6.89 0.33 15.66
F3 for C17 - Zone - 02 CFT 1.00 7.22 9.51 0.33 22.65
F2 for C23 - Zone - 02 CFT 1.00 8.53 6.89 0.33 19.38
CF1 for C12 & C13 - Zone - 02 (Part 1) CFT 1.00 12.79 6.89 0.33 29.08
CF1 for C14 - Zone - 02 (Part 2) CFT 1.00 8.86 10.66 0.33 31.15
F3 for C18 - Zone - 02 (Part 1) CFT 1.00 7.22 10.01 0.33 23.84
CF2,3 for SC,C24 & C22 - Zone - 02 (Part 2) CFT 1.00 17.64 9.86 0.33 57.38
F2 for C25 - Zone - 02 (Part 3) CFT 1.00 6.89 8.53 0.33 19.38
F3 for C15 - Zone - 02 (Part 1) CFT 1.00 11.40 7.25 0.33 27.28
F2 for C16 - Zone - 02 (Part 2) CFT 1.00 6.89 8.53 0.33 19.38
F3 for C19 - Zone - 02 (Part 1) CFT 1.00 11.23 7.87 0.33 29.18
F3 for C20 - Zone - 02 (Part 2) CFT 1.00 7.22 9.51 0.33 22.65
F2 for C21 - Zone - 02 (Part 3) CFT 1.00 6.89 6.25 0.33 14.20
F3A for C26 - Zone - 02 (Part 1) CFT 1.00 7.87 7.87 0.33 20.45
F3A for C27 - Zone - 02 (Part 2) CFT 1.00 9.33 7.89 0.33 24.29
EXCAVATION IN ZONE - 03
F3 for C10 - Zone - 03 CFT 1.00 9.51 7.22 0.33 22.65
F2A for C9 - Zone - 03 CFT 1.00 6.89 6.89 0.33 15.66
F3 for C8 - Zone - 03 CFT 1.00 9.51 7.22 0.33 22.65
Sl. No. Particulars Unit Nos. Length Breadth Depth Quantity

F4 for C7 - Zone - 03 (Part 1) CFT 1.00 6.90 10.41 0.33 23.72


F4 for C6 - Zone - 03 (Part 2) CFT 1.00 8.70 6.89 0.33 19.78
Free Space Zone - 03(Part 3) CFT 1.00 1.76 6.89 0.33 4.01
F1 for C5 - Zone - 03 (Part 1) CFT 1.00 7.54 7.00 0.33 17.43
EXCAVATION IN ZONE - 03 for RETAINING
WALL AND COLUMN FOOTING C1, C2, C3 &
C4
Retaining Wall - Zone - 03 (Part - 1) CFT 1.00 10.06 22.45 0.33 74.54
Retaining Wall - and F2, F2 & F2 for C1, C2 & CFT 1.00 33.54 9.58 0.33 106.00
C3 - Zone - 03 (Part - 2)
Retaining Wall - and F1 for C4 - Zone - 03 CFT 1.00 11.57 93.84 0.33 358.41
(Part - 3)
EXCAVATION IN ZONE - 01 for SSM
RETAINING WALL
SSM Retaining Wall - Zone - 01 (Part - 1) CFT 1.00 5.67 3.12 0.33 5.83
SSM Retaining Wall - Zone - 01 (Part - 2) CFT 1.00 20.62 3.12 0.33 21.20
EXCAVATION IN ZONE - 02 for SSM
RETAINING WALL
SSM Retaining Wall - Zone - 02 (Part - 1) CFT 1.00 15.01 3.12 0.33 15.43
SSM Retaining Wall - Zone - 02 (Part - 2) CFT 1.00 10.55 3.12 0.33 10.85
EXCAVATION IN ZONE - 03 for SSM
RETAINING WALL
SSM Retaining Wall - Zone - 03 (Part - 1) CFT 1.00 11.68 3.12 0.33 12.01
SSM Retaining Wall - Zone - 03 (Part - 2) CFT 1.00 16.65 3.12 0.33 17.12

Total Qty. 1216.47

EI EXTRA ITEM

EI-01 Providing and laying consolidated thickness of 150mm to 200mm using hardstone/ boulders size not more 175mm for
Rubble SOLING below foundations, floors, ramps, pavings etc., hand packed in position with smaller chips and binded
with stone dust / sand / moorum, rammed, compacted etc., complete. (9" THICK RUBBLE SOLING BELOW ALL
FOOTINGS)
EXCAVATION IN ZONE - 01
F1 for C32 - Zone - 01 CFT 1.00 6.56 7.54 0.75 37.12
F1 for C29 - Zone - 01 (Part 1) CFT 1.00 7.49 7.57 0.75 42.52
F2 for C30 - Zone - 01 (Part 2) CFT 1.00 6.89 8.53 0.75 44.06
F2 for C31 - Zone - 01 (Part 1) CFT 1.00 6.89 8.53 0.75 44.06
F1A for C35 - Zone - 01 (Part 2) CFT 1.00 2.11 4.41 0.75 6.98
F1 for C28 - Zone - 01 CFT 1.00 6.56 7.54 0.75 37.12
EXCAVATION IN ZONE - 02
F2A for C11 - Zone - 02 CFT 1.00 6.89 6.89 0.75 35.58
F3 for C17 - Zone - 02 CFT 1.00 7.22 9.51 0.75 51.48
F2 for C23 - Zone - 02 CFT 1.00 8.53 6.89 0.75 44.06
CF1 for C12 & C13 - Zone - 02 (Part 1) CFT 1.00 12.79 6.89 0.75 66.08
CF1 for C14 - Zone - 02 (Part 2) CFT 1.00 8.86 10.66 0.75 70.80
F3 for C18 - Zone - 02 (Part 1) CFT 1.00 7.22 10.01 0.75 54.18
CF2,3 for SC,C24 & C22 - Zone - 02 (Part 2) CFT 1.00 17.64 9.86 0.75 130.40
F2 for C25 - Zone - 02 (Part 3) CFT 1.00 6.89 8.53 0.75 44.06
F3 for C15 - Zone - 02 (Part 1) CFT 1.00 11.40 7.25 0.75 61.99
F2 for C16 - Zone - 02 (Part 2) CFT 1.00 6.89 8.53 0.75 44.06
F3 for C19 - Zone - 02 (Part 1) CFT 1.00 11.23 7.87 0.75 66.33
F3 for C20 - Zone - 02 (Part 2) CFT 1.00 7.22 9.51 0.75 51.48
F2 for C21 - Zone - 02 (Part 3) CFT 1.00 6.89 6.25 0.75 32.28
F3A for C26 - Zone - 02 (Part 1) CFT 1.00 7.87 7.87 0.75 46.48
F3A for C27 - Zone - 02 (Part 2) CFT 1.00 9.33 7.89 0.75 55.21
Sl. No. Particulars Unit Nos. Length Breadth Depth Quantity

EXCAVATION IN ZONE - 03
F3 for C10 - Zone - 03 CFT 1.00 9.51 7.22 0.75 51.48
F2A for C9 - Zone - 03 CFT 1.00 6.89 6.89 0.75 35.58
F3 for C8 - Zone - 03 CFT 1.00 9.51 7.22 0.75 51.48
F4 for C7 - Zone - 03 (Part 1) CFT 1.00 6.90 10.41 0.75 53.90
F4 for C6 - Zone - 03 (Part 2) CFT 1.00 8.70 6.89 0.75 44.95
Free Space Zone - 03(Part 3) CFT 1.00 1.76 6.89 0.75 9.12
F1 for C5 - Zone - 03 (Part 1) CFT 1.00 7.54 7.00 0.75 39.62
EXCAVATION IN ZONE - 03 for RETAINING
WALL AND COLUMN FOOTING C1, C2, C3 &
C4
Retaining Wall - Zone - 03 (Part - 1) CFT 1.00 10.06 22.45 0.75 169.42
Retaining Wall - and F2, F2 & F2 for C1, C2 & CFT 1.00 33.54 9.58 0.75 240.90
C3 - Zone - 03 (Part - 2)
Retaining Wall - and F1 for C4 - Zone - 03 CFT 1.00 11.57 93.84 0.75 814.58
(Part - 3)
EXCAVATION IN ZONE - 01 for SSM
RETAINING WALL
SSM Retaining Wall - Zone - 01 (Part - 1) CFT 1.00 5.67 3.12 0.75 13.26
SSM Retaining Wall - Zone - 01 (Part - 2) CFT 1.00 20.62 3.12 0.75 48.19
EXCAVATION IN ZONE - 02 for SSM
RETAINING WALL
SSM Retaining Wall - Zone - 02 (Part - 1) CFT 1.00 15.01 3.12 0.75 35.07
SSM Retaining Wall - Zone - 02 (Part - 2) CFT 1.00 10.55 3.12 0.75 24.65
EXCAVATION IN ZONE - 03 for SSM
RETAINING WALL
SSM Retaining Wall - Zone - 03 (Part - 1) CFT 1.00 11.68 3.12 0.75 27.29
SSM Retaining Wall - Zone - 03 (Part - 2) CFT 1.00 16.65 3.12 0.75 38.91

Total Qty. 2764.70