Open navigation menu
Close suggestions
Search
Search
en
Change Language
Upload
Sign in
Sign in
Download free for days
0 ratings
0% found this document useful (0 votes)
20 views
Training Record 1
Uploaded by
irasool261
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content,
claim it here
.
Available Formats
Download as PDF or read online on Scribd
Download now
Download
Save Training Record 1 For Later
Download
Save
Save Training Record 1 For Later
0%
0% found this document useful, undefined
0%
, undefined
Embed
Share
Print
Report
0 ratings
0% found this document useful (0 votes)
20 views
Training Record 1
Uploaded by
irasool261
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content,
claim it here
.
Available Formats
Download as PDF or read online on Scribd
Download now
Download
Save Training Record 1 For Later
Carousel Previous
Carousel Next
Save
Save Training Record 1 For Later
0%
0% found this document useful, undefined
0%
, undefined
Embed
Share
Print
Report
Download now
Download
You are on page 1
/ 9
Search
Fullscreen
< : H SABIC HOUSING PROJECT on ning K ALJAAR, YANBU Contract # EPC-LS-17-sapic-o1 |!NTHCO- (KIC) OF MEETING :|QC - 2 tes |DESCRIPTION a One vrRTOH RogeD-AN FOR STAUATAN oF [DATE/TIME 20 Mnpen-20D —_(J'00R}\ [LOCATION KIC, ALJAAR Office, Site Office, Conference Room ATTENDEES No. Name Designation Signature 1 | Gresiay PE Cae Qem 40 2 [Mohd hme Pall | GAloc noe be 2 | Smeran Yolde de CA(bO Frey 4 | Tea Payee Qc. jis feerer. Tz na s_ | Amyno Aa OA /Bc em) |= | 6 Mo SADIO AHMED Civil Ske ena noes 10 a 12 13 14 as& KHONAINIINTERNATIONAL COLTD, SABIC HOUSING PROJECT AL JAAR, YANBU cK KHONAINI INTERNATIONAL CO.LTD. DEV’T. & HOUSING PROJECT DIVISION JUBAIL, SAUDI ARABIA SABIC HOUSING PROJECT AL-JAAR, YANBU STANDARD TEST METHOD FOR INSTALLATION OF GYPSUM BOARD QUALITY CONTROL ORIENTATION PROGRAM CONDUCTED BY: Mr. Sreejith. PS, QA/QC Manager IHONAINL INTERNATIONAL CO.L3D, SABICHOUSING PROJECT AL JAAR, YANBU «-KHONAIN! INTERNATIONAL COLTD, 2 SARIC HOUSING PROJECT AL JAAR, YANBU SCOPE OF STUDY The aim of this method is to execute the scope of work, provide and maintain an effective quality control in compliance with SABIC Standard and good practices in all stages of activities for gypsum board. HONAIN! IVTERNATIONAL CoLLTD, SABIC HOUSING PROJECT AL JAAR, YANBUKYONAIN INTERNATIONAL. CO.L7O, 3 SABIC HOUSING PROJECT AL JAAR, YANBU 1. SCOPE OF STUDY 2. SCOPE OF WORK 3. REFERENCES 4, RESPONSIBILITIES 5. MATERIALS, EQUIPMENT & TOOLS a. Material delivery b. Material storage c. Materials . Equipment /Tools: 6. SITE INSTALLATION WORKS: . Site survey . Settings Out Frame work |. Inspection and testing ._ Installation of Gypsum Board Organization, Responsibilities & Supervision pean gee HONAINI INTERNATIONAL COLLTO, SABIC HOUSING PROJECT ALIAAR, YANBUK KHONAINUINTERNATIONAL COLLTD, 4 SSABICHOUSING PROJECT AL JAAR, YANBU Scope of Work: This method statement covers all sequence of the framing system on both wall and ceiling prior to installation of gypsum board where ever needed all throughout completion of the project. 3, References: 1.SES -NO; A-01-FO1 (Rev-03), DATED SEPT. 2015 2.Approved Shop Drawings. 4, Responsibilities: © Construction Manager: The responsibilities of the Construction Manager is to ensure that his team is effectively following the work as per the schedule and in compliance with the specification, approved materials, drawings and all relevant approved documents. © Site Engineer: His responsibility is to execute and monitor that the work is executed is in compliance with the specification, approved material, approved drawings and relevant documents and the work schedule, 5. Materials, Equipment & Tools a. Material delivery All approved materials will be delivered to site and stored in safe covered storage Until its inspection and approval for installation, Material data sheet & delivery note to be provided to main contractor (KICL) during delivery of material to request inspection. AHIONAINI INTERNATIONAL CouLTD, SABICHOUSING PROJECT AL JAAR, YANBU& IONAINI INTERNATIONAL CO.LTD, 5 SABIC HOUSING PROJECT AL JAAR, YANBU b. Material Storage: Gypsum panel products shall be stored in a warehouse or other suitable structure where they will not be exposed to inclement weather or to temperatures that frequently exceed 125°F (52°C). Stocks of gypsum panel products shall be stored supported evenly on a firm, dry, level, and structurally sound floor. Stocks of gypsum panel products shall be limited to a maximum height of 17 feet (5 m). Gypsum panel products shall always be stored flat. Gypsum panel products shall not be stored in areas of excessive humidity nor shall they be stored beneath overhead equipment which may have a tendency to drip grease, oil, or water. Exposure of gypsum panel products to rain and other high moisture levels may result in water stains, discoloration, mold, and sag. This sensitivity of most gypsum panel products to adverse moisture conditions requires that gypsum panel products NOT be stored outdoors without complete protection from the weather. The plastic covering provided for product protection during shipment on rail flatcars or flatbed trucks is not suitable for storage of the gypsum panels and shall be removed upon arrival at the destination prior to warehouse storage. Failure to remove this plastic covering can result in damage to the gypsum panels due to moisture, condensation, wet product, and/or mold. Framing members shall be located within the building envelope and shielded from direct contact with moisture from the ground and outdoor climate. Materials Moisture resistant gypsum board (12mm) Regular Gypsum board (12mm) Perimeter angle (2Smrmx25mmx.S4mm x 3m) Furring channel (22mm x 35mm x22mm x 12mm x 54mm) Runner (75mm x .54mm x 3.0 m) Stud (75mm x 54mm x 3.0m) Screws (11mm and 25mm) Wire connecting clips (for furring channel) AMONAINI INTERNATIONAL. CO.LTD, SABIC HOUSING PROJECT AL JAAR, YANBU Kig KHONAIN INTERNATIONAL cD.LTD, 6 SABIC HOUSING PROJECT AL [AAR, YANBU 4. Equipment /Tools: metal cutting saw powered screw Powder-Actuated Tool (Hilti Gun) drill with bit for concrete and metal jig saw metal cutting scissors sprit level chalk line t square hammer utility knife Cabie drum Handsaw 6, Site Installation works: 1. Site survey: The receipt of the shop drawings approved by SABIC/Consultant, the site will be surveyed and any discrepancy found will be notified KIC for clarification 2. Setting Out: Setting out & marking will be done as per approved shop drawing. Surveyor will carry out the lay out markings as per the approved drawing in concurrence with the schedule of works. Ceiling heights of values areas shall be marked based on the benchmark provided by KIC. For the wall (pipe chase), mark the distance according to the size of the pipe chase 3. Frame Work: a. Ceiling: From the datum the ceiling level is marked and the wall angle is fixed Position of the ceiling hangers are marked at 1200 mm centers both directionally. Hangers will be fixed on the structural soffit as per the approved shop drawing along the main carrier/channe! Hanger spacing shall not exceed 1200mm The bottom of the hanger is fixed to the carrying channel by using self-tapping screws. To the carrying channels the furring channels are fixed perpendicularly at 600 mm centers. The furring channels are fixed by using self-tapping screws. The bottom level of the furring will be level of the wall angle fixed. KHONAINT INTERNATIONAL COLD, SSABIC ROUSING PROJECT ALJAAR, YANBU && KONI INTERNATIONAL CO.-TD, : 7 SABIC HOUSING PROJECT AL JAAR, YANBU b. Wall: ‘* From the provided concrete upstand for the pipe chase measure the required approved distance on both ends mark with chalk line for the position of the bottom runner. Project 90 degrees up to the ceiling level to position the top runner. © Fix the bottom runner and Top runner. ‘* Cut stud to a neat fit into the required height of the wall, * Locate the studs into the runner as marked spacing (verify as per approved drawing), twist into position and fixed with self-tapping screw. * Locate and fix the stud bracket or support * Fix the horizontal runner at 600 mm spacing starting to the bottom channel by self- tapping screws, * Stud partition wall must fit or coincide to the dimension of gypsum board to be installed in this manner; we can avoid cutting the board. = Inspection and Testing Upon completion of framework, respective areas shall be offered for KIC and SABIC PMT inspection. inspection request will be raised. Framing system shall be inspected together with the block-outs for electrical & mechanical items prior to installing of gypsum board. Provide a MEP clearance and there should be hold points before next activities, 5. Installation of Gypsum board: * For wall, install board vertically & provide board length which will minimize end joints. * For ceiling. The gypsum board is fixed to the framing by staggering adjacent layer of the boards and perpendicular to the furring channel. * Install exposed gypsum board with face side out. Do not install imperfect, damaged or damp board. After attaching one board to frame fix it by screwing using powered screw driver. The gap or space between boards is not more than 1.5 mm. * Do not place tapered edges against cut edges or ends. * Maximum spacing of fasteners for gypsum board to be 400 mm. * For the required opening for electrical work, mark the board using pencil on the actual dimension of opening &cut it using cutting machine. KHONAIN] INTERNATIONAL.CO.LTD, SABICHOUSING PROJECT AL JAAR, YANBU &KIONAIN1 INTERNATIONAL COLTD, 8 SABIC HOUSING PROJECT ALJAAR, YANBU * Completed work should not be more than 1.5 mm difference at joints, not more than 3 mm in deviation from true plane, plumb level. 6. Organization, Responsibilities, & Supervision * Project Manager -The overall command responsible for all phases of work. * Construction Manager -The overall in charge of work production, + Q.C. Manager - Supervise the overall activity of the work as regards to quality & conformity to the specifications of the material, * Q.C. Engineer - Keeping the shop drawing and supervise the storage of the ) materials to be used, * Q.C. Inspector - Checking the materials and ensure the work is done to the highest standard procedure set by the Client. * Q.C Assistant - Assisting the work in all discipline as it may arise. * Foreran/Lead man - Directing his people on the procedure and work methodology of the work (gypsum works), + Store Keeper - Responsible for the inventory, delivery, & keeping of the materials to be used. * Installer-responsible for the installation of framing works and gypsum board + Helper- assist the installer. RHONAINI INTERNATIONAL. COL:TD, SSABICHOUSING PROJECT AL JAAR, YANBU
You might also like
Method Statement-Fit-Out Works
PDF
100% (2)
Method Statement-Fit-Out Works
18 pages
Method Statement Suspended Ceiling
PDF
100% (10)
Method Statement Suspended Ceiling
20 pages
Ga 216 07 PDF
PDF
No ratings yet
Ga 216 07 PDF
24 pages
AWCI Trade Guidelines October 2018
PDF
No ratings yet
AWCI Trade Guidelines October 2018
88 pages
Org - Gypsum.ga 216 07
PDF
100% (1)
Org - Gypsum.ga 216 07
24 pages
METHOD STATEMENT Gypsum Board Ceiling Gypsum Partitions Ceiling Tiles
PDF
0% (1)
METHOD STATEMENT Gypsum Board Ceiling Gypsum Partitions Ceiling Tiles
10 pages
Site Construction Methodology Gypsum Boa
PDF
100% (2)
Site Construction Methodology Gypsum Boa
75 pages
7-Method Statement For Gypsum Partition
PDF
86% (7)
7-Method Statement For Gypsum Partition
9 pages
6.gypsum Work
PDF
100% (1)
6.gypsum Work
7 pages
Section 09260 Gypsum Board Assemblies
PDF
No ratings yet
Section 09260 Gypsum Board Assemblies
10 pages
Method Statement For False Ceiling Works Gypsum Board, Beam Grid, Ceiling Tiles & Baffles
PDF
No ratings yet
Method Statement For False Ceiling Works Gypsum Board, Beam Grid, Ceiling Tiles & Baffles
9 pages
09 25 00 - Gypsum and Cement Board Partitions
PDF
No ratings yet
09 25 00 - Gypsum and Cement Board Partitions
6 pages
Method Statement Gypsum Board
PDF
100% (1)
Method Statement Gypsum Board
6 pages
7 Gypsumboard
PDF
No ratings yet
7 Gypsumboard
8 pages
Gypsum Board Installation to Wall
PDF
No ratings yet
Gypsum Board Installation to Wall
5 pages
Method Statement of Drywall Installation For Gypsum Boards
PDF
100% (1)
Method Statement of Drywall Installation For Gypsum Boards
7 pages
Gypsum l3 Modularized Course Planner
PDF
No ratings yet
Gypsum l3 Modularized Course Planner
12 pages
Mos - Ceiling Works With Metal Furring
PDF
100% (1)
Mos - Ceiling Works With Metal Furring
6 pages
ITCC in Riyadh Residential Complex J10-13300 09250-1 Gypsum Board
PDF
No ratings yet
ITCC in Riyadh Residential Complex J10-13300 09250-1 Gypsum Board
5 pages
Gypsum Board Assemblies Spec
PDF
No ratings yet
Gypsum Board Assemblies Spec
6 pages
SW1 Specifications Final
PDF
No ratings yet
SW1 Specifications Final
23 pages
Right View: Proposed Office Building
PDF
No ratings yet
Right View: Proposed Office Building
1 page
Method Statment Full Fitout Busardoh
PDF
No ratings yet
Method Statment Full Fitout Busardoh
12 pages
PB14_Gypboard®Kool
PDF
No ratings yet
PB14_Gypboard®Kool
2 pages
Project Specs
PDF
No ratings yet
Project Specs
7 pages
Method Statement Partition Works
PDF
No ratings yet
Method Statement Partition Works
3 pages
TRUSS BL - 27-11 B Truss Eng
PDF
No ratings yet
TRUSS BL - 27-11 B Truss Eng
34 pages
Dry Wall, Ceiling, and Painting Works
PDF
100% (1)
Dry Wall, Ceiling, and Painting Works
29 pages
PB01 Gypboard Plain
PDF
No ratings yet
PB01 Gypboard Plain
2 pages
Gypsum False Ceiling
PDF
No ratings yet
Gypsum False Ceiling
4 pages
Gypsum Board Ceiling Installation Guide
PDF
No ratings yet
Gypsum Board Ceiling Installation Guide
2 pages
Guidelines For Ceiling Framing Works
PDF
No ratings yet
Guidelines For Ceiling Framing Works
3 pages
SECTION 09260 Gypsum Wallboard System
PDF
No ratings yet
SECTION 09260 Gypsum Wallboard System
6 pages
PB16_Gyproc® Glasroc X Board
PDF
No ratings yet
PB16_Gyproc® Glasroc X Board
2 pages
Saic M 1035
PDF
No ratings yet
Saic M 1035
4 pages
Work Method Statement - GYPSUM FALSE CEILING
PDF
67% (3)
Work Method Statement - GYPSUM FALSE CEILING
3 pages
09 50 00 Gypsum Board
PDF
No ratings yet
09 50 00 Gypsum Board
14 pages
G B D O J: Ypsum Oard Irection AND Ffsetting Oints
PDF
No ratings yet
G B D O J: Ypsum Oard Irection AND Ffsetting Oints
3 pages
Method Statement For Installation of Cable Tray or Trunking
PDF
No ratings yet
Method Statement For Installation of Cable Tray or Trunking
9 pages
09 40 00 Metal Furring
PDF
No ratings yet
09 40 00 Metal Furring
7 pages
202500003179__1_090000.pdf
PDF
No ratings yet
202500003179__1_090000.pdf
33 pages
MSDS - GYPSUM AND MR BOARD
PDF
No ratings yet
MSDS - GYPSUM AND MR BOARD
4 pages
Saic M 1037
PDF
100% (1)
Saic M 1037
3 pages
Trunking MOS
PDF
No ratings yet
Trunking MOS
1 page
Cladding Wall Tiles
PDF
No ratings yet
Cladding Wall Tiles
11 pages
7 Method Statement For Gypsum Partition
PDF
No ratings yet
7 Method Statement For Gypsum Partition
9 pages
Specification Writing
PDF
No ratings yet
Specification Writing
5 pages
WHDC Ceiling Layout & Estimate
PDF
No ratings yet
WHDC Ceiling Layout & Estimate
34 pages
Chapter I. A: Rchitecture Wooden Work
PDF
No ratings yet
Chapter I. A: Rchitecture Wooden Work
17 pages
Installation Method Statement for Cable Tray Ladder
PDF
No ratings yet
Installation Method Statement for Cable Tray Ladder
5 pages
Section 09250
PDF
No ratings yet
Section 09250
9 pages
Ceiling GypsumCeiling 20190514
PDF
No ratings yet
Ceiling GypsumCeiling 20190514
11 pages
Ceiling of Finishing Work
PDF
100% (2)
Ceiling of Finishing Work
21 pages
PB01_Gypboard® Plain
PDF
No ratings yet
PB01_Gypboard® Plain
2 pages
Constr-001 Method Statements DATA TRAY INSTALLATION
PDF
No ratings yet
Constr-001 Method Statements DATA TRAY INSTALLATION
8 pages
Job Discription
PDF
No ratings yet
Job Discription
4 pages
LORDNIÑO PAMINTUAN CV - 2MB
PDF
No ratings yet
LORDNIÑO PAMINTUAN CV - 2MB
28 pages
Syed Waleed Sabir
PDF
No ratings yet
Syed Waleed Sabir
28 pages
General Equipment Layout
PDF
No ratings yet
General Equipment Layout
2 pages
Plumbing QCI Waqar Ahmad
PDF
No ratings yet
Plumbing QCI Waqar Ahmad
12 pages
Muhammad Imtiaz - QC Inspector Plumbing
PDF
No ratings yet
Muhammad Imtiaz - QC Inspector Plumbing
31 pages
Exhibition
PDF
No ratings yet
Exhibition
1 page
Qc Initial Survey Rev
PDF
No ratings yet
Qc Initial Survey Rev
1 page
Schedule of Bank Charges v9
PDF
No ratings yet
Schedule of Bank Charges v9
1 page
Muhammad Khizar - QA-QC Precast Inspector
PDF
No ratings yet
Muhammad Khizar - QA-QC Precast Inspector
17 pages
Label Diagram 1st Term Science Grade 5
PDF
No ratings yet
Label Diagram 1st Term Science Grade 5
1 page
Iso 90012015 Awareness Training 4 638
PDF
No ratings yet
Iso 90012015 Awareness Training 4 638
1 page
Iso 90012015 Awareness Training 7 638
PDF
No ratings yet
Iso 90012015 Awareness Training 7 638
1 page
Iso 90012015 Awareness Training 5 638
PDF
No ratings yet
Iso 90012015 Awareness Training 5 638
1 page
Training Record 2
PDF
No ratings yet
Training Record 2
9 pages
Employee Record 2
PDF
No ratings yet
Employee Record 2
11 pages
Kic Itp M 100 13
PDF
No ratings yet
Kic Itp M 100 13
1 page
Kic-Isf-t-00792-Itp & Inspection Checklist For Waterproofing (Underground Structures)
PDF
No ratings yet
Kic-Isf-t-00792-Itp & Inspection Checklist For Waterproofing (Underground Structures)
1 page
Kicic M 2101 001
PDF
No ratings yet
Kicic M 2101 001
1 page