04 - Inspection Checklist - Flow Test Checklist For UPVC Pipe and Fittings

This document contains information about Multiample Construction Sdn Bhd, including their company number and address in Selangor Darul Ehsan, Malaysia. It also includes a plumbing inspection checklist with 7 items to check such as the point of discharge, media used, cleanliness of pipes, and visual leaks. The inspector indicates whether each item is acceptable or not and if the contractor is allowed to proceed to the next stage of work.

Uploaded by

fitriaiman92
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
328 views

04 - Inspection Checklist - Flow Test Checklist For UPVC Pipe and Fittings

This document contains information about Multiample Construction Sdn Bhd, including their company number and address in Selangor Darul Ehsan, Malaysia. It also includes a plumbing inspection checklist with 7 items to check such as the point of discharge, media used, cleanliness of pipes, and visual leaks. The inspector indicates whether each item is acceptable or not and if the contractor is allowed to proceed to the next stage of work.

Uploaded by

fitriaiman92
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 1

MULTIAMPLE CONSTRUCTION SDN BHD (Co.No.

882407-k)
No. 4 , Jalan Wawasan Ampang 4/6 , Bandar Baru Ampang ,
68000 Ampang , Selangor Darul Ehsan .
[email protected]

Location :
Block : Level :
Drawing Ref : Date/Time:

Date of Inspection:
Time:
Item Description Contractor Suncon Consultant

1 Point of discharge:
Yes
a) W.C No Yes No Yes No

Yes
b) Basin / Sink No Yes No Yes No

Yes
c) Floor Tap No Yes No Yes No

Yes
2 Media used: Water No Yes No Yes No

Yes
3 Cleanliness of pipes No Yes No Yes No

Yes
4 Flow of media No Yes No Yes No

Yes
5 Blockages No Yes No Yes No
Yes
6 Visual leaks No Yes No Yes No
Yes
7 Other (please take) No Yes No Yes No
Reason for Failure/Re-inspection

ALLOWED to proceed with the next stage of work NOT ALLOWED to proceed with the next stage of work

YES NO
Non-Conformance Report Raised NCR no.:

Name/Signature of
Designation: Date:
Works Package Contractor:
Contractor
Representative

Name/Signature of
Designation: Date:
Supervising Contractor:
Main Contractor
Representative

Name/Signature of
Designation: Date:
Supervising Consultant:
Client’s Consultant
Representative
Please (√) off where appropriate *Status Of Inspection: = Acceptable , X = Not Acceptable, – = Not Applicable