Wk11 - Time Cost Optimisation
Wk11 - Time Cost Optimisation
The planning of project is concerned with modelling the work of the project.
It also concerns the availability of the various resources used on the project.
If any of the key resources change significantly the result will either be a
need to accelerate work or accept delay.
Variances to the baseline plan programme will occur and if agreed by the
client and contractor are termed changes. However, where agreement is not
reached then it becomes a claim.
Today’s world is becoming evermore litigious. No two projects are the same,
nor are two claims exactly the same.
Project acceleration
The starting point for investigating the causes of delay in the project is during
the implementation phase of the project life-cycle – this retrospective
analyses will attempt to evaluate:
Whether the project could feasibly be completed within the time and cost
constraints of the client including the procurement path;
The role and preparation of programmes, histograms and resource schedules
prepared by the contractor to meet the client’s requirements
The path played by Critical path Analyses (CPA) in planning the works
The obligation and entitlement of the client, contractor and sub-contractors as
detailed in the contract, with special regard to those provisions relating to time;
The procedures for reporting on progress and for dealing with problems in a timely
fashion so as not to lead to the work being delayed.
Application in the Built Environment
To ensure that for a shorter duration for doing work there is an addition in
overall cost…
Cost
Activity duration
Crash Duration (CD) Normal Duration (ND)
Crashing Rate
Determine the increase in costs for each activity per day [i.e. the crashing rate],
where…
(i) 18 days
(ii)15 days
Activity Normal Time Crash Time Normal Cost Crash Cost
[Days] [Days] [£] [£]
1-2 6 4 7630 9200
1-3 7 4 6072 8349
1-4 7 5 8832 11040
2-5 6 3 5520 7590
3-4 6 3 6624 9108
3-5 8 5 6808 9361
4-5 5 3 5152 6440
4-6 6 4 7912 9890
5-6 4 3 7176 8073
Method
4
6
1 3 5
2
(i) Critical Path and Overall Project
Duration
4 6 days
7 days 6
6 days 5 days
6 days
6 days
2
Overall project duration =
Crash by 1 day the least cost
activity on the Critical path
4 6 days
7 days 6
6 days 4 days
6 days
6 days
2
Overall project duration =
NB has the Critical Path changed?
Repeat until the overall project
duration = 18 days
4 6 days
7 days 6
6 days 3 days
6 days
6 days
2
Overall project duration = 18 days
Additional cost = £2806
(ii) Repeat until the overall
project duration = 15 days
4 6 days
7 days 6
5 days 3 days
6 days
6 days
2
Overall project duration = 15 days
Additional cost = £2484
Exercise 1
1 2 5 6
3 9
4 7
8