Soil: Particle Size Ditribution: Contractor Client Supervisor

This document contains the results of a particle size distribution test and a liquid, plastic, and linear shrinkage limit test on a stabilized sub-base sample from the rehabilitation of the Olwiyo–Pakwach Road in Uganda. The particle size distribution test found that the sample contained 0-15% clay, 15-53% silt, and 33.7-49.1% sand and met the specification requirements. The liquid, plastic, and linear shrinkage limit test determined the water content needed for the soil to transition between states of consistency.

Uploaded by

Odong Joel
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
26 views7 pages

Soil: Particle Size Ditribution: Contractor Client Supervisor

This document contains the results of a particle size distribution test and a liquid, plastic, and linear shrinkage limit test on a stabilized sub-base sample from the rehabilitation of the Olwiyo–Pakwach Road in Uganda. The particle size distribution test found that the sample contained 0-15% clay, 15-53% silt, and 33.7-49.1% sand and met the specification requirements. The liquid, plastic, and linear shrinkage limit test determined the water content needed for the soil to transition between states of consistency.

Uploaded by

Odong Joel
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 7

Contractor Client Supervisor

UGANDA NATIONAL
UGANDA
ROADS AUTHORITY
NATIONAL ROADS
CONSTRUCTION AND
AUTHORITY
NEC/CRSG - JV SUPERVISION UNIT

REHABILITATION OF OLWIYO – PAKWACH ROAD (62.5Km)

Procurement Refrence Number: UNRA/Works/2020-2021/00130

SOIL: PARTICLE SIZE DITRIBUTION


Ref: BS 1377:2
Lab Ref. No.: SB 002 Date Sampled: 30.11.2023
Location: KM 47+360 - 48+600 LHS Date Tested: 3.12.2023
Layer/Depth SUB BASE Tested by: Winny/Ibra

Sample Description: STABILISED SUB BASE WITH CEMENT Material Source: INSITU CRR+CEM II 42.5N

Initial sample mass, g (A) : 6544 Dry mass before washing, g (B) : 6521

Moisture content (%) 0.4 Dry mass after washing, g (C): 6154

Total dry mass

Mass retained Cumulative Specification


Sieve size (mm) % retained % passing Specification upper limit Remarks
(g) mass Retained lower limit
75 0.0 0.0 0.0 100.0
63 0.0 0.0 0.0 100.0
50 0.0 0.0 0.0 100.0
37.5 0.0 0.0 0.0 100.0 Container No. MAR QQB
28 207.0 207.0 3.2 96.8 Mass of wet soil + TIN (a) 614.0 667.0
20 924.0 1131.0 14.2 82.7 Mass of dry soil + TIN (b) 612.0 664.8
14 649.0 1780.0 10.0 72.7 Mass of container (c ) 53.0 55.0
10 587.0 2367.0 9.0 63.7 Mass of moisture (d = a-b) 2.0 2.2
6.3 695.0 3062.0 10.7 53.0 Mass of dry soil (e = b-c) 559.0 609.8
5 254.0 3316.0 3.9 49.1 MC (w =100X(d)/(e) 0.4 0.4
2 1010.0 4326.0 15.5 33.7 Average Moisture content 0.4
1.18 346.0 4672.0 5.3 28.3
0.600 415.0 5087.0 6.4 22.0
0.425 235.0 5322.0 3.6 18.4
0.300 220.0 5542.0 3.4 15.0
0.212 187.0 5729.0 2.9 12.1
0.150 94.0 5823.0 1.4 10.7
0.075 282.0 6105.0 4.3 6.4
Pan 47.0 6152.0 0.7
GM 2.416

PERCENTGE PASSING VS SEIVE SIZE


100.0

90.0

80.0
Total Percent Passing(%)

70.0

60.0

50.0

40.0

30.0

20.0

10.0

0.0
0.01 0.1 1 10 100
Sieve Size (mm)

For the Contractor's For the Supervisor's

Materials Technician: Materials Engineer: Materials Technician: Materials Engineer:


Contractor Client Supervisor
UGANDA UGANDA NATIONAL
NATIONAL ROADS AUTHORITY
ROADS CONSTRUCTION AND
NEC/CRSG - JV AUTHORITY SUPERVISION UNIT

REHABILITATION OF OLWIYO – PAKWACH ROAD (62.5Km)

Procurement Refrence Number: UNRA/Works/2020-2021/00130

DETERMINIATION OF LIQUID, PLASTIC & LINEAR SHRINKAGE LIMIT

BS 1377-2:1990
Lab Ref. No.: SB 002 Date Sampled: 30.11.2023
Location: KM 47+360 - 48+600 LHS Date Tested: 1.12.2023
Layer/Depth SUB BASE Tested by: Martha/RONALD
STABILISED SUB BASE WITH
Sample Description: Material Source: INSITU CRR+CEM II 42.5N
CEMENT
LIQUID LIMIT PLASTIC LIMIT
TEST NO. 1 2 3 4 1 2 Average
Initial dial gauge reading mm 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Final dial gauge reading mm 15.0 15.1 17.0 17.5 21.4 21.7 24.5 24.0
Average penetration mm 15.1 17.3 21.5 24.3
Container No. MA HG AF HI CO SK TN FA
Mass of wet soil + container (a) 62.70 52.69 58.97 53.96 56.74 57.88 53.36 59.48
Mass of dry soil + container (b) 50.79 43.17 47.84 43.90 46.01 46.86 43.17 47.74
Mass of container (c ) 11.16 11.02 11.18 10.59 11.61 11.33 10.92 10.89
Mass of moisture (d = a-b) 11.9 9.5 11.1 10.1 10.7 11.0 10.2 11.7
Mass of dry soil (e = b-c) 39.6 32.2 36.7 33.3 34.4 35.5 32.3 36.9
Moisture content (w =100X(d)/(e) 30.1 29.6 30.4 30.2 31.2 31.0 31.6 31.9
Average Moisture content 29.8 30.3 31.1 31.7
32.0 Natural moisture content
%
30.0
Sample Preparation
28.0 a) as received
26.0 b) air dried o
C
c) washed on 0.425 mm
24.0
d) oven dried o
C
Penetration

22.0 e) unknown
20.0 Proportion pasiing 0.425 mm
%
18.0
Liquid limit;
16.0 LL 30.8 %
14.0
Plastic limit
PL NP %
12.0
29.0 29.5 30.0 30.5 31.0 31.5 32.0 32.5 33.0 33.5 34.0 Plastic Index
Moisture Content PI NP %
LINEAR SHRINKAGE
Shrinkage Mould No. XX
Mass of wet soil + Mould (a) 255.49 Mass of moisture (d = a-b) 17.01
Mass of dry soil + Mould (b) 238.48 Mass of dry soil (e = b-c) 53.97
Mass of Mould (c ) 184.51 Moisture content (w =100X(d)/e 31.5
Initial length Lo mm 140 mm Oven-dried length LD mm 138.8 mm
Linear shrinkage, LS = 100X(1-LD/Lo) 0.9 % Shrinkage Product, SP=LSX %<425 μm

For the Contractor's For the Supervisor's


Materials Technician: Materials Engineer: Materials Technician: Materials Engineer:
Contractor Client Supervisor

UGANDA NATIONAL
UGANDA
ROADS AUTHORITY
NATIONAL ROADS
CONSTRUCTION AND
AUTHORITY
SUPERVISION UNIT
NEC/CRSG - JV
REHABILITATION OF OLWIYO – PAKWACH ROAD (62.5Km)

Procurement Refrence Number: UNRA/Works/2020-2021/00130

MAXIMUM DRY DENSITY (MDD) COMPACTION


REF: BS 1377: Part 4 - 1990
Lab Ref. No.: SB 002 RFI No. Date Sampled: 30.11.2023
Location: KM 47+360 - 48+600 LHS Date Tested: 30.11.2023
Layer/Depth SUB BASE Tested by: DANIEL/JOHN

Sample Description: STABILISED SUB BASE WITH CEMENT Material Source: INSITU CRR+CEM II 42.5N

Bulk density determination


TEST No 1 2 3 4 5
WATER ADDED, g 170 290 410 530 650
WEIGHT OF MOULD+SAMPLE 10160 10379 10565 10410 10330
WEIGHT OF MOULD 4790 4790 4790 4790 4790
WEIGHT OF SAMPLE 5370 5589 5775 5620 5540
VOLUME OF MOULD 2305 2305 2305 2305 2305
WET DENSITY 2.330 2.425 2.505 2.438 2.403
Moisture determination
CONTAINER No EMII AC MSK SSH DEII
WT OF WET SOIL+TIN 5,702.0 6,043.0 6,230.0 6,060.0 5,983.0
WT OF DRY SOIL+TIN 5,553.2 5,792.0 5,888.0 5,647.2 5,528.0
WT OF TIN 474.0 473.0 480.0 468.0 485.0
WT OF MOISTURE 148.8 251.0 342.0 412.8 455.0
WT OF DRY SOIL 5,079.2 5,319.0 5,408.0 5,179.2 5,043.0
MOISTURE CONTENT 2.9 4.7 6.3 8.0 9.0
AVERAGE MOISTURE CONTENT 2.9 4.7 6.3 8.0 9.0
DRY DENSITY 2.263 2.315 2.356 2.258 2.205

Dry Density VS Moisture Content


2.37
2.36
2.35
2.34
2.33
2.32
2.31
2.3
Dry Density

2.29
2.28
2.27
2.26
2.25
2.24
2.23
2.22
2.21
2.2
2 3 4 5 6 7 8 9 10

Moisture Content

OMC: 6.0 %

MDD: 2.360 g/cm3

For the Contractor's For the Supervisor's

Materials Technician: Materials Engineer: Materials Technician: Materials Engineer:


CONTRACTOR JV CLIENT SUPERVISOR

Uganda National Roads Uganda National Roads Authority


Authority (UNRA) Construction and Supervision Unit
NEC/CRSG

Rehabilitation of Olwiyo – Pakwach Road (62.5Km)


UNCONFINED COMPRESSIVE STRENGTH TEST FOR STABILISED MATERIALS

Test method BS 1924-2:1990

Sample ref. SB-001 Sampling date 20.11.2023


Location KM 47+820 - 48+020 LHS TRIAL SECTION 1 Stabiliser agent CEM II 42.5N
Layer details Sub-Base Technician EVANS/CRIMIA
Materials Description Stablised CRR with Cement

Casting date 20.11.2023 Testing date 04.12.2023

Diameter of mould(mm) 100 Cement content Used (%) 2%

Height of the mould (mm) 200

Volume, V (cmᶟ) 1571


Maximum Dry Density of Stablised
2.308 Optimum moisture Content (%) 7.4
material, ρ (g/cmᶟ)

Conditioning 14 days Air tight curing 7 days Air tight curing & 7days soaking in water

Test number 1 2 3 4 5 6

Mass of compacted specimen Before


g 3774 3794 3739 3788 3764 3771
Curing m1
Mass of compacted specimen After Curing
g 3764 3781.4 3739 3831.4 3812.4 3833.6
m2

Bulk density ρb1 Before curing g/cm 3


2.402 2.415 2.380 2.411 2.396 2.400

Bulk density ρb2 After curing g/cm 3


2.396 2.407 2.380 2.439 2.427 2.440

Initial Moisture Content & Density Determination Before Curing

Moisture container No. EJ BENZ


Mass of container g 48.0 52.0
Mass of wet sample + container g 540.0 699.0
Mass of dry sample + container g 511.5 663.0
Moisture content % 6.1 5.9
Average moisture content W % 6.0
Dry density ρd1 g/cm3 2.266 2.278 2.245 2.274 2.260 2.264
Moisture Content & Density Determination After Curing

Moisture container No. N TI P M B DAX


Mass of container g 462.8 469.2 450.6 466.0 468.8 475.0
Mass of wet sample + container g 4190.4 4239.4 4165.2 4270.6 4216.2 4213.8
Mass of dry sample + container g 3988.2 4037.0 3988.0 4028.0 3957.2 3965.8
Moisture content % 5.7 5.7 5.0 6.8 7.4 7.1
Average moisture content W % 5.7 5.7 5.0 6.8 7.4 7.1
Dry density ρd2 g/cm3 2.266 2.278 2.266 2.283 2.259 2.278
UNCONFINED COMPRESSIVE STRENGTH
Maximum Load (p) KN 21.48 25.55 10.53 18.18 18.67 18.86
Correction factor 1.00 1.00 1.00 1.00 1.00 1.00

UCS (p/A) MPa 2.73 3.25 1.34 2.31 2.38 2.40

Average UCS MPa 2.44 2.36

UCS ratio % 96.8


Remarks:

FOR CONTRACTOR FOR SUPERVISOR


Materials Technician Materials Engineer Materials Technician Materials Engineer
Contractor Client Supervisor

UGANDA
UGANDA NATIONAL ROADS
NATIONAL
AUTHORITY CONSTRUCTION AND
ROADS
SUPERVISION UNIT
AUTHORITY

NEC/CRSG - JV

REHABILITATION OF OLWIYO – PAKWACH ROAD (62.5Km)

Procurement Refrence Number: UNRA/Works/2020-2021/00130

Location KM 47+360 - 48+600 LHS Test Ref No SB 002 TRIAL SECTION Sampling Date 30.11.2023
Layer SUB BASE Material source INSITU CRR+CEM II 42.5N Reporting date
S. No. Test Details Units Results Specification limits
1 PARTICLE SIZE DITRIBUTION - Min. Max
50.0 100 - -
37.5 100 - -
20.0 83 - -
5.0 49 - -
Sieve size (mm) 2.0 34 - -
0.425 18 - -
0.075 6
Grading Modulus - 2.42
Maximum Particle Size mm 50.0
Liquid Limit % 30.8
Plastic Limit % NP
3 Atterberg Limits Plasticity Index - NP
Linear Shrinkage % 8.1
Shrinkage Product - 149
Maximum Dry Density g/cm3 2.360
4 Moisture-Density Relationship
Optimum Moisture Content % 6.0
UCS Dry % 1.5 MPa
5 UCS UCS Wet %
Ratio UCS Wet/UCS Dry % 75%

Remarks:

Contractor's Materials Eng. Supervisor's Materials Eng.

Date:
CONTRACTOR JV CLIENT SUPERVISOR

Uganda National Roads Uganda National Roads Authority Construction


NEC/CRSG
Authority and Supervision Unit

Rehabilitation of Olwiyo – Pakwach Road (62.5Km)


Determination of Field Density of Soils by Sand Replacement Method

Test Method: BS 1377 : Part 9 : 1990

RFI No.: FDT-SB-001 Date tested: 20.11.2023

Location (Ch.): KM 47+820 48+020 LHS Conducted by(Contractor's designated Technici RONALD

Layer Description: STABILISED SUB BASE( TRIAL SECTION) Test Attended by(Eng's Materials Technician): DANIEL

Material Source: INSITU CRR+CEM II 42.5N Absolute min. # of tests/Sec/layer

Tray no.

FDT Spot locations (Ch.) 47+830 47+850 47+870 47+890 47+910 47+930 47+950

Offset from CL (m) 4.9 2.7 1.0 3.4 5.4 2.2 0.9

Layer Thickness: 235.0 250.0 230.0 230.0 210.0 250.0 260.0

Mass of calibrated sand+cylinder(g): 24000 23500 23500 23500 23500 22500 23500

Mass of calibrated sand left in cylinder+cylind 10740 9213 10431 10916 10646 8758 11052

Mass of residual calibrated sand left in cone(g 2746 2748 2747 2753 2779 2734 2761

Mass of calibrated sand left in hole(g): 10514 11539 10322 9831 10075 11008 9687

Density of calibrated sand (g/cm³): 1.331 1.331 1.331 1.331 1.331 1.331 1.331

Volume of hole (cm³): 7899 8669 7755 7386 7569 8270 7278

Mass of wet sample from the hole(g): 18519 20895 18516 17724 18421 20413 17606

Wet Density (g/cm³): 2.344 2.410 2.388 2.400 2.434 2.468 2.419

Determination of Moisture Content

Container No. BOX VIP ZXX TFV KK FEB PSV TAP MAY UBJ TEZ TT JAN BOX1

Mass of container + wet sample(g):M1 2878.0 2614.0 3404.0 2972.0 3251.0 3227.0 2264.0 2243.0 2306.0 2415.0 3007.0 3223.0 2598.0 3126.0

Mass of container + dry sample(g):M2 2766 2508.8 3273.8 2869.8 3142.8 3110.2 2204 2170.0 2221.4 2329.6 2901.0 3103.6 2514.8 2419.6
moisture content

Mass of container(g):M3 489.0 465.0 482.0 468.0 465.0 479.0 474.0 477.0 468.0 469.0 473.0 470.0 472.0 481.0

Mass of water(g):M4=M1-M2 112 105.2 130.2 102.2 108.2 116.8 60 73 84.6 85.4 106 119.4 83.2 706.4

Mass of dry sample(g):M5=M2-M3 2277 2043.8 2791.8 2401.8 2677.8 2631.2 1730 1693.0 1753.4 1860.6 2428 2633.6 2042.8 1938.6

Moisture content(%):M6=M4/M5*100 4.9 5.1 4.7 4.3 4.0 4.4 3.5 4.3 4.8 4.6 4.4 4.5 4.1 36.4

Average Moisture Content(%) 5.0 4.5 4.2 3.9 4.7 4.4 4.1

Avg. Field Moisture Content (%) 4.3

Max. Dry Density g/cm3 MDD 2.308 2.308 2.308 2.308 2.308 2.308 2.308

Optimum Moisture Content(%) OMC 7.4 7.4 7.4 7.4 7.4 7.4 7.4

Dry Density(g/cm³)= Wetdensity*100/(100+M6) 2.232 2.307 2.290 2.310 2.324 2.363 2.324

Rel.Field Moisture Content (%): 68.0 60.3 57.3 52.6 63.6 60.1 55.0

Rel. Compaction (%): 96.7 100.0 99.2 100.1 100.7 102.4 100.7

Av Compaction (%): 100.6

Av FMC/OMC (%): 57.5

Remarks

For the Contractor For the Supervisor

Checked by: Checked by:

Materials Technician Materials Technician.

Materials Engineer Materials Engineer

Signature & date Signature & date


CONTRACTOR JV CLIENT SUPERVISOR

Uganda National Roads Uganda National Roads Authority Construction


NEC/CRSG
Authority and Supervision Unit

Rehabilitation of Olwiyo – Pakwach Road (62.5Km)


Determination of Field Density of Soils by Sand Replacement Method

Test Method: BS 1377 : Part 9 : 1990

RFI No.: FDT-SB-001 Date tested: 20.11.2023

Location (Ch.): KM 47+820 48+020 LHS Conducted by(Contractor's designated Technici RONALD

Layer Description: STABILISED SUB BASE( TRIAL SECTION) Test Attended by(Eng's Materials Technician): DANIEL

Material Source: INSITU CRR+CEM II 42.5N Absolute min. # of tests/Sec/layer

Tray no.

FDT Spot locations (Ch.) 47+970 47+990 48+010

Offset from CL (m) 2.8 5.0 3.8

Layer Thickness: 240.0 210.0 220.0

Mass of calibrated sand+cylinder(g): 23500 23500 23500

Mass of calibrated sand left in cylinder+cylind 11303 10004 11354

Mass of residual calibrated sand left in cone(g 2746 2748 2747

Mass of calibrated sand left in hole(g): 9451 10748 9399

Density of calibrated sand (g/cm³): 1.331 1.331 1.331

Volume of hole (cm³): 7101 8075 7062

Mass of wet sample from the hole(g): 17503 19744 17178

Wet Density (g/cm³): 2.465 2.445 2.433

Determination of Moisture Content

Container No. CCM2 SS BUS MSK BOB SOP

Mass of container + wet sample(g):M1 2989.0 2714.0 2715.0 2844.0 3181.0 3001.0

Mass of container + dry sample(g):M2 2892.2 2622.2 2630 2746.8 3089.4 2920.0
moisture content

Mass of container(g):M3 489.0 467.0 485.0 479.0 473.0 476.0

Mass of water(g):M4=M1-M2 96.8 91.8 85 97.2 91.6 81

Mass of dry sample(g):M5=M2-M3 2403.2 2155.2 2145 2267.8 2616.4 2444.0

Moisture content(%):M6=M4/M5*100 4.0 4.3 4.0 4.3 3.5 3.3

Average Moisture Content(%) 4.1 4.1 3.4

Avg. Field Moisture Content (%) 4.3

Max. Dry Density g/cm3 MDD 2.308 2.308 2.308

Optimum Moisture Content(%) OMC 7.4 7.4 7.4

Dry Density(g/cm³)= Wetdensity*100/(100+M6) 2.367 2.348 2.352

Rel.Field Moisture Content (%): 56.0 55.7 46.0

Rel. Compaction (%): 102.6 101.7 101.9

Av Compaction (%): 100.6

Av FMC/OMC (%): 57.5

Remarks

For the Contractor For the Supervisor

Checked by: Checked by:

Materials Technician Materials Technician.

Materials Engineer Materials Engineer

Signature & date Signature & date