Manhole Ndp-Koordinat Existing

This document provides information about a fuel pump room labeled B-1. The fuel pump room is 9.36 square meters in size and its floor levels are marked as +FFL 25.350 and +SL 25.175. No other details are given in the document.

Uploaded by

firman zakir
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
28 views4 pages

Manhole Ndp-Koordinat Existing

This document provides information about a fuel pump room labeled B-1. The fuel pump room is 9.36 square meters in size and its floor levels are marked as +FFL 25.350 and +SL 25.175. No other details are given in the document.

Uploaded by

firman zakir
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

NOTE :

FUEL PUMP ROOM B-1


9.36 m2
+FFL 25.350
+ SL 25.175
HCSS -

ZOOM 7
FUEL PUMP ROOM B-2
9.36 m2
UNDERGROUND FUEL TANK 100m3 UNDERGROUND FUEL TANK 100m3 UNDERGROUND FUEL TANK 100m3 +FFL 25.350
(5.5M DEPTH) DETAIL TO STRUCTURAL (5.5M DEPTH) DETAIL TO STRUCTURAL (5.5M DEPTH) DETAIL TO STRUCTURAL + SL 25.175
ENGINEER'S DETAIL. ENGINEER'S DETAIL. ENGINEER'S DETAIL. HCSS -

DIESEL FUEL TRENCH 1M (H) X 1.2M (W) W/ CENTER DIVIDER

TRENCH FUEL
LV-08 296
LV-11 LV-13
MHE3
Ø150 PIPES
Ø150 PIPES
6 LV-09
MHE3
8 11 MHE3
LV-10
MHE3
14 LV-12
MHE3 MHE3
TL: 25.400
Ø150 PIPES
TL: 25.060 TL: 25.060 TL: 25.060 TL: 25.06 TL: 25.060
LV-14
ELV-08
ELV-08 Ø150 PIPES MHE3
IL: 22.884 IL: 21.785 IL: 23.945 IL: 23.945 IL: 23.945 IL: 23.945 TL: 25.060
MHE3
MHE3 ELV-09 45000 10350 8700 8400 8700 8400 8600 7137 IL: 23.945 7137
TL:
TL:25.400
25.400 DRIVEWAY LV-15
IL:
IL:22.650
22.650
6m WIDTH ELV-11 ELV-12 ELV-13 MHE3

16888
MHEB2 MHEB2 MHEB2 MHEB2 TL: 25.000
MHEB2
TL: 25.0 TL: 25.0
+RL 25.000 STAIRCASE 004 TL: 25.0 TL: 25.0
ELV RISER B FIBER ENTRYTL:003
25.0 ELV-14
IL: 23.945
Ø150 PIPES
Ø150 PIPES
Ø150 PIPES

IL: 22.180 IL: 24.5 IL: 24.5 IL: 24.5

2
11250 11250 11250 11250

2
FO-09 IL: 24.5 MHEB2
R.01
+ SL --.-- 20 m2 7.7 m2 6.2 m2 X = 2073.162 X = 2074.762
FO-08 FO-10 FO-11 TL: 25.0
1537 FO-07
MHO3 MHO2
HDC - ST 4 MHO3 ELVR B
MHO3
FE 3 FO-12
IL: 24.5
Y = 5047.249 FO-13 Y = 5047.249
TL: 24.94
1296 TL: 24.94 TL: 24.94 +FFL 25.775 +FFL 25.775 TL: 24.94 +FFL 25.775

1300
3750 3750 3750
IL: 21.950 3750 3750 3750 3750 3750 3750 3750 3750 IL: 22.80 3750 IL: 23.5 IL: 23.5 MHO2 MHO1 6041
MHO4 TILES NV EPX AC EPX - TL: 25.0 TL: 25.0

1300
TL: 25.0 IL: 23.5 IL: 23.5

TRENCH FUEL
IL: 22.0
XLV-16
= 2073.162
MHE1
X = 2074.762
ELV-48 ELV-47 Y = 5045.649
TL: 25.0 Y = 5045.649
MV-14 IL: 22.4

2099 LV-08
P MHC3
TL: 25.0
U-65 U-65 MHEB2
TL: 25.175
IL: 22.6
MHEB2
TL: 25.00
IL: 22.6 RWDP
TL: 25.0
ELV-15

MHEB2
TL: 25.0
IL: 23.450
FIRE LIFT LOBBY
75MMØSP
IL: 23.2 IL: 23.04

STAIRCASE 005 20 m2 RC APRON SUMP RWDP

BHI
ELV-08 20 m2
FLL 001 SUMP

U-65
U-65
DRIVEWAY ST 5
+FFL 25.775
-

TIXE
- m2 +FFL 25.475 TILES NV +FFL 25.175
METAL - HCSS -
+FFL 25.000
75MMØSP 75MMØSP 75MMØSP 75MMØSP 75MMØSP
75MMØSP 75MMØSP 75MMØSP 75MMØSP 75MMØSP
+ CL 25.000
HDC -
PRE-ACTION RISER BØ80 RISER EXIT
FE - CO2
CRAH 004 FE - CO2 Ø80 RISER EXIT

3.5 m2 F.A. RISER B (5KG) (5KG)


3.5 m2 Ø65 FCO 130 m2 FCO Ø65
PSV B AC 004
F.A.R. B
+FFL 25.775 Ø65 +FFL 25.775
EPX - +FFL 25.775 Ø65 Ø65 Ø65 MDF B
ELEC RISER B EPX -
AS EPX AC FCO 62 m2
12850

12 m2
ELR B
FCO MDF B
+FFL 25.775

KEY PLAN
+FFL 25.775
HD EPX AC
EPX -

STAIRCASE 003
20 m2

8 7 6 5 4 3 2 1

EXIT
1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

11300
ST 3
+FFL 25.775
TILES NV
DATA HALL 002

Ø80 WITH 2% SLOPE


817 m2

01
FIBER ENTRY 004 M002
6.2 m2 LV-19
+FFL 25.775
FE 4 MHE1
AS EPX AC

Ø80 WITH 2% SLOPE


+FFL 25.775 RC APRON TL: 25.0
IL: 22.4 ELV-16
EPX - ELV SERVER ROOM - m2
MHEB2
N 50 m2 - TL: 25.0

02
HOT AISLE CONTAINMENT (WIDTH:1.5M)

HOT AISLE CONTAINMENT (WIDTH:1.5M)

HOT AISLE CONTAINMENT (WIDTH:1.5M)

HOT AISLE CONTAINMENT (WIDTH:1.5M)

HOT AISLE CONTAINMENT (WIDTH:1.5M)

HOT AISLE CONTAINMENT (WIDTH:1.5M)

HOT AISLE CONTAINMENT (WIDTH:1.5M)

HOT AISLE CONTAINMENT (WIDTH:1.5M)


IL: 23.04
ELVSR +FFL 25.175 MHE2

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9
TL: 25.0
+FFL 25.925 HCSS - IL: 22.4
RC PLINTH FOR GENSET & POWER MODULE RCARPET AC
1920 m2 LV-17

BHI
-
+FFL 25.475 HOSE BIBE

03
HDC - FCC / ROCC / ECC ELEC RISER D Ø25

EXIT
140 m2 3 m2
FCC/ROCC/ECC 001 ELR D
R.01
AC RISER B +FFL 25.925 +FFL 25.775
12 m2 RCARPET AC

04
1537 TILES -
A.C.R B
2 NOS 1 ROW Ø150 PIPES

2 NOS 1 ROW Ø150 PIPES


FOR LV SYSTEM

FOR LV SYSTEM

LV-07
+FFL 25.775
37700

12000

MHE2 EPX -
TL: 25.200
IL: 22.884

9980
FOR LV SYSTEM
2 NOS 1 ROW Ø150 PIPES

FOR LV SYSTEM
2 NOS 1 ROW Ø150 PIPES

ELV RISER C

05
6.35 m2
LANDSCAPE ELVR C
297 m2

STAFF CAR PARKING (14 NOS)


MV-14 +FFL 25.775

U-65
+FFL 25.175 EPX AC
+ SL 25.000 MHC1
GRASS - TL: 25.0

06
IL: 23.450

FO-14
FO-14

MHO3
FE - CO2 FE - CO2 FE - CO2 FE - CO2
TL: 25.0
(5KG) (5KG) (5KG) (5KG) IL: 22.0

07
ELV-07

CRAH 003

DATA CENTRE-B
MHEB2
TL: 24.950 130 m2
IL: 22.650 75MMØSP
Ø65 AC 003 Ø65 LIFT LOBBY A
Ø65 +FFL 25.775 Ø65 37 m2

FCO AS EPX AC LL A VISITOR EXHIBITION ROOM


Ø65 FCO

08
Ø65 +FFL 25.775 41 m2
Ø80 MDF
RISER
C Ø80 RISER TILES AC -
27 m2
FCO CORRIDOR +FFL 25.775
MDF C 380 m2 CP AC
FCO

51600
9042
EXIT

EXIT
TIXE
+FFL 25.775 -
EPX -

09
+FFL 25.775
EPX AC
FO-06 FCO FCO FCO
12850

MHO4
TL: 25.0
Ø80 RISER CRAH 002 Ø80 RISER
IL: 22.0 Ø65 Ø65
130 m2
FCO

10
AC 002
METAL

Ø65 Ø65 +FFL 25.775


DETECTOR

AS EPX AC

SECURITY
CHECK
STAIRCASE 005 SECURITY
CONTROL
20 m2 PANEL
PH + OHB
ST1 FE - CO2
GVØ100 c/w CONTROL BOX

11
FE - CO2 FE - CO2
(5KG)

U-65
+FFL 25.475 (5KG) (5KG)
METAL -

CHARGER CHARGER CHARGER


ELECTRIC ELECTRIC ELECTRIC

PARKING PARKING PARKING


FUTURE
ELEC RISER A Ø50

LOT
12 m2 BHI ELV-17

24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
650MM WIDTH RC BOX DRAIN WITH HEAVY DUTY GRATING AT 6M C-C ELR A MHEB2
FT

FEMALE TOILET TL: 25.0

12
+FFL 25.775 MHEB2 IL: 23.04
13 m2 TL: 25.0
EPX - ENTRANCE
IL: 23.04 RAMP ELV-18
H

Ø80 WITH 2% SLOPE


DISABLE TOILET FT FT 001 26.8 m2

FUTURE
MHEB2
G 4 m2 +FFL 25.725
ELV-46 - TL: 25.0
MHE1
TL: 25.0

LOT
IL: 23.04

9980
EXIT EXIT DT 001 TILES MV IL: 22.4
EXIT FT +FFL 25.775 LV-19
+FFL 25.725 HCSS - LV-18

13
MAKE UP WATER PUMP RM B TILES AC MHE3
TL: 25.0
MAKE UP WATER PUMP RM A 19 m2
UNDERGROUND BLOWDOWN IL: 22.4
FT
4375

19 m2 MUWP B
2000 X 2000 RC TRENCH W

HOT AISLE CONTAINMENT (WIDTH:1.5M)

HOT AISLE CONTAINMENT (WIDTH:1.5M)

HOT AISLE CONTAINMENT (WIDTH:1.5M)

HOT AISLE CONTAINMENT (WIDTH:1.5M)

HOT AISLE CONTAINMENT (WIDTH:1.5M)

HOT AISLE CONTAINMENT (WIDTH:1.5M)

HOT AISLE CONTAINMENT (WIDTH:1.5M)

FUTURE
TIXE
-
PIPE 2X Ø200 MUWP A +FFL 25.475

HOT AISLE CONTAINMENT (WIDTH:1.5M)

LOT
EPX
EPX MV

U-65
R.01 +FFL 25.475 +FFL 25.775
1537 CLIMBER EPX MV
FT

S.P.R B
MEETING ROOM B

14
7.5 m2
RC FLOOR SLAB 0.6 m2
F

Ø80 WITH 2% SLOPE


MTGR B
20 m2 SAN. RISER B
LV-06 +FFL 25.775
- FT

CP AC
MHE2 +FFL 25.475
TL: 25.200
IL: 22.884 HDC -
PRE-ACTION RISER A
20KV MODULE

20KV MODULE

BHI
FT

3.6 m2
DATA HALL 001 SAN. RISER A
4662

ELV-06

MAKE UP WATER TANK A MAKE UP WATER TANK B RECEIVING OFFICE PSV A 817 m2 2.5 m2
MHEB2
212 m2 148 m2 +FFL 25.775 M001 S.P.R A FT

TL: 24.950 212 m2

EXIT
IL: 22.650 EPX -
MUW B MUW B +FFL 25.775 +FFL 25.775
MUW A
+FFL 25.475 +FFL 25.475 +FFL 25.775 AS EPX AC EPX - MEETING ROOM A

8 7 6 5 4 3 2 1
1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8
FT

HCSS AC 7.5 m2

D
HCSS - HCSS -
PPR PIPE PN16 Ø80mm MTGR A
+FFL 25.775
RISER TO ROOF TANK
19789

AC RISER A CP AC
12 m2
A.C.R. A
RWDP
SUMP Suhardi INSTALLATION CONNECT TO NDP 00 26/02/2024

11300
LIFT LOBBY B +FFL 25.775 ELEC RISER C (SOLAR)

BHI
HYDRANT RISER A
5000

LV-06
102 m2 EPX - 3 m2 TL: 25.0

EXIT
TIXE 3.6 m2

By Drawing Description Rev Date


LL B ELR C
+FFL 25.775
HR A FO-15
FO-15
IL: 23.2
+FFL 25.775
+FFL 25.775
HCSS MV FIBER ENTRY 001 EPX - MHO3
ELV-06 EPX - 6.2 m2 TL: 25.0
IL: 22.0
RWDP
FE 1
SUMP
C +FFL 25.775
EPX -
75MMØSP CRAH 001
MHC3
FCO Ø65 130 m2 Ø65 FCO
Ø65
TL: 25.775
IL: 23.750

MV-X
RC APRON
- m2
-
Ø80 RISER
5878
Ø65

Ø65 FE - CO2 Ø65 FCO


AC 001
+FFL 25.775
AS EPX AC FCO Ø65
FE - CO2
Ø80 RISER
MHEB2
ELV-19

COORDINATION DRAWING
5752

(5KG) TL: 25.0


(5KG)
RC PLINTH EXIT IL: 23.04

ZOOM 6
+FFL 25.775 LV-20
TRANSFORMER ROOM 228 m2
ELECTRICAL ROOM HCSS - 75MMØSP 75MMØSP
40 m2 55 m2 75MMØSP 75MMØSP MHE3
LANDSCAPE

4503
- FIBER ENTRY 002 TL: 25.0 TL: 25.0

FLOO
ELV RISER A

ROOMNA
53 m2 - - MHO3 IL: 22.4
+FFL 25.275 6.2 m2
IL: 23.2
CLIENT / LAND OWNER:
7.7 m2
RC PLINTH +FFL 25.275 TL: 25.150

ROOMNO
+FFL 25.275
WATER METER 2
+FFL 25.475

AREA
RFINISH
HDC - 1787

300
228 m2 HDC - HDC - IL: 23.400 ELVR A FE 2

FFL
+ SL 25.000
TURF - 3252 +FFL 25.775 +FFL 25.775
-

ME
FO-32
A EPX AC EPX - RWDP

VENT
+FFL 25.275
800

1970

HDC - ELV-37 SUMP X = 2078.967


A1 5802 5802 4996 6004 5500 5500 6596 3450 9550 RC APRON Y = 4983.865
- m2 MHEB2 X = 2075.828
TL: 25.0 Y = 4983.245
-
LOADING / UNLOADING BAYS
IL: 23.04 HOSE BIBE 3300

485
+FFL 25.175
1 3 4 5 7 9 10 12 13 -
15 Ø25

GDS IDC SERVICES


HCSS - ELV-45
FE 1
1286

Ø200mm
X 2 ROW
650MM WIDTH RC BOX DRAIN WITH HEAVY DUTY GRATING AT 6M C-C +FFL 25.000
MHEB2

W.E.F.

PVC PIPE
TL: 25.0

1043

3 NOS
HDC - IL: 23.04
MV-09 650MM WIDTH RC BOX DRAIN WITH HEAVY DUTY GRATING AT 6M C-C X = 2079.200

13553
MHC1
TL: 24.94 U-65 MHC1
TL: 25.0
U-65 X = 2076.061
Y = 4982.068
3360
Y = 4982.688

MAX POWER
IL: 21.4

OUTGOING
2464 IL: 20.850
2239

MAX POWER
RC PLINTH FOR BUFFER TANK FO-34

PROJECT MANAGEMENT CONSULTANT:

INCOMING
FO-30
FO-05
115 m2
FO-16
FO-16 SC
R.01
1 3 4 5 7 TL:MHO3 9 10 12 13 15 16 17 18 19 20 21 22 23 CVØ100
WATER METER 1
MHO1 - MHO1

ISH VENT
MHO2 MHO2
25.0 120625

TIE BREAKER
TL: 25.0 TL: 25.0 TL: 25.0 TL: 25.0

ME
+FFL 25.475 SECTAG

ROOMNO
1537 IL: 22.0 IL: 22.0 ROOMNAME

SECTAG
IL: 22.0

ROOMNA

FFL
IL: 22.0 IL: 22.0

AREA

FLOORFIN
HDC -
LV-39 AREA
LV-05

MHE3
5802 MHE2
5802TL: 25.0
LV-40
4996 6004 5500 5500 MHE3
6596
TL: 25.0
3450 Ø150 SPRINKLER
9550
FO-31
10350 8700 8400 MHE2
TL: 25.0
8700 8400 8600 7137 7137
LV-21
MHE3
TL: 25.0
MHE3
LV-21
ROOMNO
TL: 25.200 IL: 22.600 IL: 22.600 IL:
TL:21.400
25.0 FFL
IL: 22.600

INCOMING
PT. Geotechnical & Enviromental
IL: 22.940 IL: 22.4
LV-38 MV-06 FLOORFINISH VENT

U-65

PLN
MHC1
DRIVEWAY HV-07
6m WIDTH

OUTGOING
TL: 25.0 MHC3 MHC3 MHC3
TL: 25.0 TL: 25.0 X = 2080.986

Services Indonesia
+RL 25.000

PLN
IL: 20.610 TL: 25.0 IL: 21.4
IL: 21.3 IL: 21.4 Y = 4973.648
+ SL --.-- DRIVEWAY
HV-10
MV-04 RC PLINTH FOR BUFFER TANK X = 2077.846
HDC - 6m WIDTH
MHC2
MV-05 115 m2 Y = 4973.028
TL: 25.0 +RL 25.000
IL: 21.200 -

W.E.F.
42
+ SL --.--
+FFL 25.475

13
ELV-36 HDC -
HDC -
10th Floor, Graha Pramitha, Jln. Denpasar. Block- D2

165
1
1286
Ø110 PIPES
Ø110 PIPES

ELV-38 LV-22 LV-23


ELV-34 ELV-35
ELV-05 MHEB2
Kuningan
ELV-34
X = 2081.218

U-65
MHE3 MHE2
TL: 24.940 TL: 25.0 TL: 25.0
MHEB2 Ø110 PIPES MHEB2 MHEB2
IL: 23.04
MHEB2 Y = 4972.471
TL: 24.950 Ø110 PIPES
LV-05 TL: 24.940 TL: 24.940 TL: 25.0 ELV-20
IL: 22.4 IL: 22.4 X = 2078.079
DRIVEWAY
Jakarta 12940 - Indonesia
IL: 22.650 Ø110 PIPES
IL: 23.04
IL: 23.04 IL: 23.04 Y = 4971.851
Ø110 PIPES
Ø110 PIPES

MHEB2
6m WIDTH
4316

ZOOM 5
TL: 25.0

T: +6221 252 1975


650MM WIDTH RC BOX DRAIN WITH HEAVY DUTY GRATING AT 6M C-C 650MM WIDTH RC BOX DRAIN WITH HEAVY DUTY GRATING AT 6M C-C IL: 23.04
+RL 25.000
650MM WIDTH RC BOX DRAIN WITH HEAVY DUTY GRATING AT 6M C-C + SL --.--
RC APRON
LOADING / UNLOADING BAYS
-
KERB RAMP
DOWN
1:12
DOWN
DOWN DOWN

DOWN DOWN
HDC -
F: +6221 252 1915
-
DOWN
FE 1 +FFL 25.175
HV-03 HCSS -
+FFL 25.000 ELV RISER A FIBER ENTRY 002
MHC3
P1 HDC -
5878
UNDERGROUND RWDP PIPE REFER TO STRUCTURAL ENGINEER DESIGN & SPECIFICATION 7.7 m2 6.2 m2
800

TL: 25.0
RC APRON
IL: 21.200

P T 1:
12 2425 ELVR A FE 2
LV-24
2128

+FFL 25.775 +FFL 25.775


2513

SC RC PLINTH DIEN
2110

- EPX AC EPX - MHE3

228 m2 CK
DO LLER
CK GRA MHO3
TL: 25.0
DO LLER
4094

+FFL 25.175

32860
IL: 22.4
TL: 25.150 -
HCSS ELV-21
VE
LEVE
-
LE IL: 22.0

LEAD / M&E CONSULTANT:


3 RISERS

U-65
MHE3
ENTRANCE 01 +FFL 25.275 FO-33 75MMØSP 75MMØSP 75MMØSP 75MMØSP
T: 250MM
R: 175MM TL: 25.0 X = 2088.537 X = 2090.137
10m WIDTH HDC - RC APRON FO-17 IL: 23.04
Y = 4963.229 FO-18 Y = 4963.229
5752

- m2
+RL 25.000 EXIT
O
HDR Consulting Pte. Ltd.
MV-XX Ø80 RISER FE - CO2 Ø80 RISER MHO2 MHO1 437 NEW ROAD OPENING TO ACCESS EXTERNAL MEP ROOM
- FE - CO2
+ SL --.--
HDC -
TL : 23.660 MHC3
+FFL 25.775
Ø65 (5KG) Ø65 FCO CRAH 001
130 m2
FCO (5KG) Ø65 MDF A
62 m2
TL: 25.0
IL: 22.0
TL: 25.0
IL: 22.0 10m WIDTH

HCSS - +RL 27.700


IL : 23.460 TL: 25.0
Ø65 AC 001 MDF A X = 2088.537 X = 2090.137
IL: 20.850 Ø65 + SL --.--
350 Orchard Road
U-65
+FFL 25.775 Ø65 +FFL 25.775 Y = 4961.629 Y = 4961.629
2 NOS 1 ROW Ø150 PIPES

2 NOS 1 ROW Ø150 PIPES

FIBER ENTRY 001FCO Ø65 FCO HDC -


FOR LV SYSTEM

FOR LV SYSTEM

LV-04 75MMØSP AS EPX AC EPX AC


MHE2
TL: 25.200
N
6.2 m2
FE 1
STAIRCASE 002 Ø200 SPRINKLER #18-01/02 Shaw House
23,895
IL: 22.884
+FFL 25.775
Singapore 238868
2 NOS 1 ROW Ø150 PIPES

2 NOS 1 ROW Ø150 PIPES

24 m2
HYDRANT RISER A
FOR LV SYSTEM

FOR LV SYSTEM

EPX -
LIFT LOBBY B ST 2 ELEC RISER C (SOLAR)
3.6 m2
T: +65 6864 9950
650MM WIDTH RC BOX DRAIN WITH HEAVY DUTY GRATING AT 6M C-C

102 m2

8 7 6 5 4 3 2 1
1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8
+FFL 25.775 3 m2
HR A
EXIT

LL B TILES NV ELV-22
ELR C

EXIT
5000

LANDSCAPE +FFL 25.775


+FFL 25.775
AC RISER A MHE3
F: +65 6491 1259

11300
MHE1
+FFL 25.775 TL: 25.0
EPX - TL: 25.0
IHB

63 m2 HCSS MV 12 m2 IL: 23.04


EPX - IL: 23.04
+FFL 25.175 A.C.R. A MEETING ROOM A
+SL 25.000 +FFL 25.775 7.5 m2
GRASS - EPX -
PPR PIPE PN16 Ø80 mm ARCHITECT:

40
MTGR A
R.01
22989

+FFL 25.775
M Ø150 SPRINKLER RISER TO ROOF TANK
Ø80 WITH 2% SLOPE

1537 CP AC
MAKE UP WATER TANK A MAKE UP WATER TANK B RECEIVING OFFICE PRE-ACTION RISER A DATA HALL 001 SAN. RISER A
3HPArchitects Pte. Ltd.
FT
HOT AISLE CONTAINMENT (WIDTH:1.5M)

HOT AISLE CONTAINMENT (WIDTH:1.5M)

HOT AISLE CONTAINMENT (WIDTH:1.5M)

HOT AISLE CONTAINMENT (WIDTH:1.5M)

HOT AISLE CONTAINMENT (WIDTH:1.5M)

HOT AISLE CONTAINMENT (WIDTH:1.5M)

HOT AISLE CONTAINMENT (WIDTH:1.5M)

HOT AISLE CONTAINMENT (WIDTH:1.5M)


212 m2 212 m2 148 m2 2.5 m2
3.6 m2 817 m2
3605
EXIT

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9
ELV-04 MUW A MUW B MUW B S.P.R A MALE TOILET

39
PSV A M001 FT HIDDEN LINE
+FFL 25.475 +FFL 25.475 +FFL 25.775 SL01-1 +FFL 25.775 19 m2 INDICATE
4662

MHE2 +FFL 25.775 +FFL 25.775 GLASS


TL: 24.680

Blk. 162 #04-3555 Bukit Merah Central


HCSS - HCSS - HCSS AC CANOPY
IL: 21.587 EPX - AS EPX AC EPX - MT 001 4 RISERS
ABOVE
T: 250MM

IHB
FT
R: 150MM
+FFL 25.775

F.A. RISER A TILES MV


MEETING ROOM B L
3.5 m2 7.5 m2
Singapore 150162

38
FT

F.A.R. A MTGR B ENTRANCE 02

U-65
SAN. RISER B
K HDPE PE100 PN16 SDR11
+FFL 25.525 0.6 m2 +FFL 25.775 10m WIDTH
T: +65 6235 8333

Ø80 WITH 2% SLOPE


EPX - CP AC +RL 25.000

U-65
S.P.R B
Ø100MM X 2 + SL --.--

F: +65 6733 0809


FT

MAKE UP WATER PUMP RM A +FFL 25.775


HDC -
19 m2 MAKE UP WATER PUMP RM B EPX -

37
STAIRCASE 001 HOSE BIBE

EXIT
SL01-2
4375

19 m2
MUWP A 20 m2 ENTRANCE RAMP Ø25

U-65
MUWP B DISABLE TOILET
+FFL 25.475 26.8 m2
ST 1 FT

EPX MV +FFL 25.475 4 m2


EPX MV +FFL 25.475 -
DT 001 FEMALE TOILET

9980
EXIT EXIT
METAL - EXIT
+FFL 25.775
FT

13 m2
+FFL 25.775
HCSS - LOCAL CONSULTANT:

36
J1 ELEC RISER A
TILES AC
FT
FT 001
2 RISERS (RC)
12 m2 +FFL 25.775
1720

T: 250MM
R: 150MM
650MM WIDTH RC BOX DRAIN WITH HEAVY DUTY GRATING AT 6M C-C TILES MV
ELR A WAITING AREA/ RECEPTION

PT. HASKON CITRA PERDANA


100 m2
FT

+FFL 25.775
J
680

EPX - IHB -
H 2 RISERS (RC)
T: 250MM
2 RISERS (RC)
T: 250MM
+FFL 25.775 RAMP
R: 150MM R: 150MM TILES AC GRADIENT
1:12
FE - CO2
(5KG)
FE - CO2
(5KG)
FE - CO2
(5KG) BUILT IN LOCKERS BY OTHERS
Jl. Mas Surya Negara 1, Kawasan Industri Terpadu Kabil
SECURITY
G Kompleks Citranusa Niaga Blok A2 No. 5-7

SECURITY
CONTROL

DRIVEWAY

CHECK
FO-04
PANEL ELV-23
HV-11
6m WIDTH CRAH 002
Batam 29467 - Indonesia
MHE2
MHO3
TL: 24.165 +RL 25.000 Ø65 Ø65 130 m2
METAL
TL: 24.7
MHC1 DETECTOR IL: 24.0

POWER MODULE
IL: 22.000 AC 002 ELV-39 LV-25

GENSET
+ SL --.-- TL: 25.0
LIFT A ELV-40 ELV-41 LV-26
HDC -
IL: 21.200

Ø80 RISER
Ø65
+FFL 25.775
AS EPX AC
FCO
Ø65
(EVACUATION
LIFT )
Ø80 RISER
MHEB2
TL: 25.0
MHEB2
TL: 25.0
IL: 23.04
MHEB2
TL: 25.0
MHE1
TL: 25.0
IL: 22.4
MHE3
TL: 24.5
IL: 23.8
T: +62 778 711116 - 711265
F: +62 778 711115
IL: 23.04 IL: 23.04

FCO FCO CORRIDOR FCO


MDF C 380 m2
2 NOS 1 ROW Ø150 PIPES

2 NOS 1 ROW Ø150 PIPES

27 m2
FOR LV SYSTEM

FOR LV SYSTEM

12850

51600
LV-03 -

9042
14 M SETB
MDF C
EXIT

EXIT
+FFL 25.775
MHE2
TL: 24.046 +FFL 25.775
EPX AC
FCO LIFT LOBBY A
EXIT

IL: 22.000 EPX - FCO HIDDEN LINE


Ø110 PIPES
Ø110 PIPES

INDICATE GLASS
FIRE SPRINKLER
LEED CONSULTANT:
37 m2
HDPE VISITOR
PE100 PN16 ROOMSDR11
2 NOS 1 ROW Ø150 PIPES

2 NOS 1 ROW Ø150 PIPES

DATA CENTRE- A
CANOPY ABOVE

ACK
FOR LV SYSTEM

FOR LV SYSTEM

ELV-03
Ø80 RISER Ø80 RISERLL A EXHIBITION FO-19
FO-19 WATER PUMP ROOM
MHE2
TL: 23.750
IL: 21.587
Ø65
Ø65 FCO CRAH 003
130 m2
AC 003
FCO Ø65
Ø65
+FFL 25.775
TILES AC Ø100MM
41 m2

+FFL 25.775
-
MHO3
TL: 25.0
IL: 22.0
56 m2
FSWP
+FFL 21.975
Building System and
GENSET POWER MODULE Ø65 Ø65 EPX MV

Diagnostics Pte. Ltd.


1537 +FFL 25.775 CP AC
AS EPX AC

9000
R.01
6035

FE - CO2 FE - CO2 FE - CO2


F
22 Veerasamy Road,
FE - CO2
(5KG) (5KG) (5KG) (5KG)

E KERB RAMP
Singapore 207328
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9
650MM WIDTH RC BOX DRAIN WITH HEAVY DUTY GRATING AT 6M C-C

1:12 MDD02
RC APRON ELV RISER C

T: +65 6560 0702


- m2 6.35 m2
- ELVR C
Ø80mm

HEAVY DUTY uPVC


FCC CONTROL PANEL BOARD

+FFL 25.175 +FFL 25.775


HCSS -

POWER MODULE
EPX AC
F: +65 6795 0020
2714
GENSET

9980
HV-02
AC RISER B
HOT AISLE CONTAINMENT (WIDTH:1.5M)

HOT AISLE CONTAINMENT (WIDTH:1.5M)

HOT AISLE CONTAINMENT (WIDTH:1.5M)

HOT AISLE CONTAINMENT (WIDTH:1.5M)

HOT AISLE CONTAINMENT (WIDTH:1.5M)

HOT AISLE CONTAINMENT (WIDTH:1.5M)

HOT AISLE CONTAINMENT (WIDTH:1.5M)

MHC3 12 m2
HOT AISLE CONTAINMENT (WIDTH:1.5M)

TL: 23.530
IL: 20.000 A.C.R B
+FFL 25.775
EPX - FCC / ROCC / ECC ELEC RISER D
FIRE SPRINKLER FIRE SPRINKLER MAIN CONTRACTOR :
37700

12000

RC PLINTH FOR GENSET & POWER MODULE 140 m2 3 m2


WATER TANK A WATER TANK B
1920 m2 FCC/ROCC/ECC 001 ELR D 160 m2 X 3.3m HT 160 m2 X 3.3m HT
Ø80 WITH 2% SLOPE

PT. ACSET INDONUSA TBK

9000
EXIT

- +FFL 25.925 +FFL 25.775 FSW A FSW B


+FFL 25.475 RCARPET AC TILES -
+FFL 21.975 +FFL 21.975
HDC - HCSS - HCSS -

U-65
4 RISERS
T: 250MM
D
IHB
Ø80 WITH 2% SLOPE

R: 150 MM
ELV-24

GENSET POWER MODULE ELV SERVER ROOM

ACSET BUILDING
50 m2 MHE2
TL: 22.8
ELVSR LV-37 IL: 22.1 LV-27

+FFL 25.925 MHE3


1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

8 7 6 5 4 3 2 1

FIBER ENTRY 004 RCARPET AC RC APRON TL: 25.0 MHE2

6.2 m2
DATA HALL 002
- m2
-
IL: 22.4 TL: 22.6
IL: 21.9
JL. Majaphit No.26
FE 4 817 m2

U-65 Petojo Selatan - Gambir


+FFL 25.175

36800
+FFL 25.775
C EPX -
+FFL 25.775
M002
STAIRCASE 003 HCSS -
24 m2
AS EPX AC
ST 3 Jakarta, Indonesia 10160
+FFL 25.775

11300
Telp : (021) 3511961
3930

TILES NV
ASTRA
EXIT

GVØ100 DOMESTIC WATER &


GENSET POWER MODULE WATER FEATURE PUMP ROOM
25.5 m2 Fax : (021) 3441413
ELEC RISER B MDF B

9000
-

MHC1
12 m2
ELR B
62 m2
MDF B GVØ40
MDD02 +FFL 21.975
EPX MV
E-mail : [email protected]
FCO CORRIDOR

1
TL: 25.0
IL: 21.0 +FFL 25.775 F.A. RISER B CRAH 004
+FFL 25.775
PRE-ACTION RISER B EPX - 3.5 m2 FCO HD EPX AC
90 m2
3.5 m2 Ø65 130 m2 Ø65 Ø65 - DOMESTIC TREATED DOMESTIC RAW
4737

FO-03
Ø65
F.A.R. B
PSV B AC 004 +FFL 21.975 WATER TANK WATER TANK
PROJECT :
12850

+FFL 25.775 13 m3 13 m3
+FFL 25.775
EPX -
Ø65 FCO +FFL 25.775
FCO Ø65 EPX -
EPX - FE - CO2 AS EPX AC DTWT DRWT
FE - CO2
Ø80 RISER EXIT (5KG) (5KG) Ø80 RISER EXIT MDD02 +FFL 21.975 +FFL 21.975

LV-02
1436 1744 HCSS - HCSS - B
3 RISERS 75MMØSP 75MMØSP 75MMØSP 75MMØSP 75MMØSP
T: 250MM
MHE2 R: 175MM

POWER MODULE
EXIT

FIRE LIFT LOBBY


GENSET
TL: 22.857 3 RISERS
IL:21.000 FO-03 T: 250MM
12 m2 R: 175MM
FIRE FO-20 FO-22
LIFT RWDP HOSE BIBE
2300

MHO2 FLL 001


TL: 22.957
WATER FEATURE
IHB

MHO2 MHO4
ELV-02
IL: 20.100 +FFL 25.775 SUMP TL: 25.0 TL: 21.875
71 m2
ELV-25 Ø25
TILES NV IL: 22.0 IL: 19.9
MHE2
MHE2
TL: 22.657 STAIRCASE 005 75MMØSP +IL 21.350 TL: 21.8
IL: 21.1
IL: 20.200 20 m2 RC APRON FIBER ENTRY 003 +WL 21.70
- m2 6.2 m2 TL: 25.0

U-65
ST 5 HCSS -
STAIRCASE 004 - FE 3 IL: 23.2
1537 LV-32 +FFL 25.475 RC APRON 20 m2 ELV-44
ELV-43 ELV-42

METAL - +FFL 25.175 MHEB2 +FFL 25.775


- m2 BASEMENT ENTRANCE
R.01 MHE2
A ST 4 MHEB2
HCSS TL: 25.0 - EPX
TL: 25.0 - MHEB2 LV-28
9800

TL: 22.957 IL: 23.04 TL: 25.0


ELV-32 - +FFL 25.775 IL: 23.04 26.1 m2
IL: 20.200 KERB RAMP IL: 23.04 MHE2
+FFL 25.175 TILES NV - TL: 21.8
MHE1 1:12 IL: 21.1
405

TL: 22.957 HCSS - +FFL 21.875

ZOOM 1 ZOOM 2
IL: 21.587
FO-21
EPX -
650MM WIDTH RC BOX DRAIN WITH HEAVY DUTY GRATING AT 6M C-C 650MM WIDTH RC BOX DRAIN WITH HEAVY DUTY GRATING AT 6M C-C
MHO4
FO-25
FO-28
650MM WIDTH RC BOX DRAIN WITH HEAVY DUTY GRATING AT 6M C-C FO-26 TL: 25.0
IL: 22.0
ELV RISER B MHO2
TL: 25.0 LV-36
(CLEAR WIDTH)

MHO3 MHO3 MHO3 7.7 m2 IL: 22.0


ENTRANCE 02-DRIVEWAY
MHE1

TITLE
1060
900

TL: 25.0 TL: 25.0 MHO2 TL: 25.0


IL: 22.0 IL: 22.0 IL: 22.0 ELVR B TL: 25.0
TL: 25.0
LV-35 IL: 22.4
7.4M WIDTH
FO-28 IL: 22.0
LV-33 MHE3 +FFL 25.775 +RL 21.775
LV-34
LV-33 FO-27 TL: 25.0
EPX AC
3750 MHE3 3750 3750 3750 3750 3750 3750 3750 3750 3750 3750 3750 MHE4 IL: 22.4 + SL --.--
TL: 25.0 TL: 25.0 HDC -

1
IL: 22.4 IL: 22.4 ELV-29 AS02
ELV-31
ELV-31
MHE3 11250 11250 11250 11250
ELV-30
MHE2 MHEB3
TL: 25.0
HOSE BIBE
TL: 25.0
TL: 25.0
IL: 23.04 IL: 23.04 IL: 23.04 Ø25
ROOMNAME
AREA
U-65
INSTALLATIONS CONNECTED TO NDP
45000

ZOOM 4
HV-01
475 1270
ROOMNO 6300 5100
FFL
1720

FLOORFINISH VENT
ENTRANCE 01 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 FO-23

DIESEL6FUEL TRENCH 1M (H) X 1.2M


8 (W) W/ CENTER DIVIDER
SEPTIC TANK 1.2 M3
MHC2
11400
IRRIGATION PIPE Ø25

IRRIGATION PIPE Ø25

7.4m WIDTH TL: 22.957


ELV-28
390

+RL 22.075
IL: 18.900
2 11 14 MHE2
START ENTRANCE 02
7.4m WIDTH
MHO3
TL: 20.8
Ø110 PIPES
Ø110 PIPES

TL: 25.0 IL: 19.9


915

R.01 + SL --.--
LV-31 IL: 23.04 FFL +20.175
ELV-33 02 FUTURE FUTURE FUTURE +RL 20.075
HDPE PE100 PNELECTRIC
16
TH

HDC - ELV-26
270 195

1537

ZOOM 3 U-65
MHE1
TL: 22.957
MHE2
TL: 22.957
ELECTRIC ELECTRIC + SL --.--
MHE2
405

HDC -
IL: 21.587
Ø150

SDR 11 Ø40 mmCHARGER CHARGER CHARGER TL: 21.8


Ø110 PIPES
Ø110 PIPES

PIPES
IL: 20.200 1980 456 930 295 270 205
Ø150 ELV-27 IL: 21.1 LV-29
Ø150 PIPES

Ø150 PIPES

Ø110 PIPES PIPES


ELV-01 Ø110 PIPES
PARKING PARKING PARKING MHE2 X = 2098.667 X = 2100.167
MHE1
3430 1386 OUTGOING INCOMING
BOTTOM OF TRANCH
INCOMING
CABLE +21.550
TIE BREAKER
OUTGOING
ROOMNAME TL: 20.1
MHE1

ROOMNAME
PLN
+21.550 PLN MAX POWER MAX POWER
LOT LOT LOT TL: 21.8
2025

LV-01 TL: 22.657


Ø110 PIPES AREA
IL: 19.4 IL: 21.1 Y = 4892.956 Y = 4892.955
IL: 21.587 Ø110 PIPES
AREA

UNDERGROUND SANITARY
880 520 385
MHE2
MHE1 ROOMNO TL: 20.1
TL: 22.857 ROOMNO IL: 19.4
IL: 21.00 Ø150 PIPES FFL DOORTAG DOORTAG
8450
600

Ø150 PIPES FFL LV-30


GVØ100 c/w Control Box HOSE BIBE
REVOLVING -
GATE FLOORFINISH VENT REVOLVING -
GATE

X = 2098.667 X = 2100.167
Approved :
FLOORFINISH VENT
320

Ø25
PIPE REFER TO DRAWING Plot Size Date

20860
250

U-80 PH + OHB Y = 4891.456 Y = 4891.455


340

X = 2068.113 X = 2069.713
Y = 4890.099 Y = 4890.099
IKSAN P.S 26/02/2024
610

NO. 10330442-SEW-GH-300
DOORTAG
FO-24
A3
1255

MHO1
X = 2039.839 TL: 20.075 +20.075
SEPTIC TANK 1.2 M3
Y = 4889.392 IL: 19.9 6700
X = 2068.113
Y = 4888.499
X = 2069.713
Y = 4888.499 Reviewed by : Scale Rev.
4545

X = 1913.467
Y = 4885.855
X = 1916.184
FO-01 X = 1926.981
X = 1932.450
Y = 4885.779
X = 1938.449
3482
Y = 4885.861
Suhardi 1:100 00
X = 1912.346 A Y = 4885.581
Y = 4885.305
D
MHO1
X = 1929.288 X = 1932.454 X = 1938.453
10900

Y = 4885.926 TL: 22.0


- X = 1926.988 Y = 4885.561
X = 1916.192 IL: 19.1 Y = 4886.479 Y = 4885.479
Y = 4885.294
X = 1912.286
Y = 4885.017 SUBSTATION A
18 m2
Checked by : Drawing no.
Y = 4885.168
+RL 22.207 FUEL PUMP ROOM A-2
Firman Z.
CD-AI-MEP-01
+RL 22.657 S/S A 9.36 m2
POSISI MANHOLE FO NDP
X = 1913.398 +FFL 23.05 +FFL 25.350
X =FUEL PUMP ROOM A-1
1938.472
X = 1932.473
Drawing by :
Y = 4885.083 HD EPX MV + SL 25.175
X = 1927.024 Y = 4884.1619.36 m2
Y = 4884.080 HCSS -
X = 1916.228 Y = 4883.894 +FFL 25.350
X = 1938.476
X = 1932.477
Y = 4883.617
X = 1916.236
X = 1927.032
Y = 4883.584
Y = 4883.780 Y = 4883.861
+ SL 25.175
HCSS -
Alfatah
Y = 4883.305

REFERENCE DRAWING
10330442-CS-SP-304
SUPER IMPOSED SITE PLAN (SURFACE / UNDERGROUND DRAINAGE & UNDERGROUND SERVICE TO STRUCTURAL FOUNDATION) MEETING COORDINATION NDP,WSP& ACSET, DATE: 21/02/2024

1:700
NOTE :

FUEL PUMP ROOM B-1


9.36 m2
+FFL 25.350
+ SL 25.175
HCSS -

FUEL PUMP ROOM B-2


9.36 m2
UNDERGROUND FUEL TANK 100m3 UNDERGROUND FUEL TANK 100m3 UNDERGROUND FUEL TANK 100m3 +FFL 25.350
(5.5M DEPTH) DETAIL TO STRUCTURAL (5.5M DEPTH) DETAIL TO STRUCTURAL (5.5M DEPTH) DETAIL TO STRUCTURAL + SL 25.175
ENGINEER'S DETAIL. ENGINEER'S DETAIL. ENGINEER'S DETAIL. HCSS -

DIESEL FUEL TRENCH 1M (H) X 1.2M (W) W/ CENTER DIVIDER

TRENCH FUEL
LV-08 296
LV-11 LV-13
MHE3
Ø150 PIPES 6 LV-09
MHE3
8 11 MHE3
LV-10
MHE3
14 LV-12
MHE3 MHE3
TL: 25.400
Ø150 PIPES Ø150 PIPES

TL: 25.060 TL: 25.060 TL: 25.060 TL: 25.06 TL: 25.060 MHE3
LV-14
ELV-08
ELV-08 Ø150 PIPES
IL: 22.884 IL: 21.785 IL: 23.945 IL: 23.945 IL: 23.945 IL: 23.945 TL: 25.060
MHE3
MHE3 45000 10350 8700 8400 8700 8400 8600 7137 IL: 23.945 7137
TL:
TL:25.400
25.400
ELV-09 DRIVEWAY LV-15
IL:
IL:22.650
22.650 ELV-11 ELV-12 ELV-13 MHE3

16888
MHEB2 MHEB2 6m WIDTH MHEB2 MHEB2 TL: 25.000
MHEB2
TL: 25.0 TL: 25.0
+RL 25.000 STAIRCASE 004 TL: 25.0 TL: 25.0
ELV RISER B FIBER ENTRYTL:003
25.0 ELV-14 IL: 23.945

Ø150 PIPES
Ø150 PIPES

Ø150 PIPES
IL: 22.180 IL: 24.5 IL: 24.5 IL: 24.5

2
11250 11250 11250 11250

2
R.01 FO-09 20 m2 7.7 m2 6.2 m2 IL: 24.5 MHEB2
FO-08 + SL --.-- FO-10 FO-11 TL: 25.0 X = 2073.162 X = 2074.762
1537 IL: 24.5 FO-13
FO-07
MHO3 MHO2
HDC - ST 4 MHO3 ELVR B MHO3
FE 3 FO-12 Y = 5047.249 Y = 5047.249
+FFL 25.775 TL: 24.94
1296 TL: 24.94 TL: 24.94 +FFL 25.775 TL: 24.94 +FFL 25.775

1300
3750 3750 3750
IL: 21.950 3750 3750 3750 3750 3750 3750 3750 3750 IL: 22.80 3750 IL: 23.5 IL: 23.5 MHO2 MHO1 6041
MHO4 TILES NV EPX AC EPX - TL: 25.0 TL: 25.0

1300
TL: 25.0 IL: 23.5 IL: 23.5

TRENCH FUEL
IL: 22.0
XLV-16
= 2073.162
MHE1
X = 2074.762
ELV-48 ELV-47 Y = 5045.649
TL: 25.0 Y = 5045.649
MV-14 IL: 22.4

2099 LV-08
P MHC3
TL: 25.0
U-65 U-65 MHEB2
TL: 25.175
IL: 22.6
MHEB2
TL: 25.00
IL: 22.6 RWDP
TL: 25.0
ELV-15

MHEB2
TL: 25.0
IL: 23.450 FIRE LIFT LOBBY
75MMØSP
IL: 23.2 IL: 23.04

STAIRCASE 005 20 m2 RC APRON SUMP RWDP

BHI
ELV-08 20 m2
FLL 001 SUMP

U-65
U-65
DRIVEWAY ST 5 +FFL 25.775
-

TIXE
- m2 +FFL 25.475 TILES NV +FFL 25.175
+FFL 25.000 METAL - HCSS -
75MMØSP 75MMØSP 75MMØSP 75MMØSP 75MMØSP
+ CL 25.000 75MMØSP 75MMØSP 75MMØSP 75MMØSP 75MMØSP

HDC -
PRE-ACTION RISER BØ80 RISER EXIT
FE - CO2 CRAH 004 FE - CO2
Ø80 RISER EXIT

3.5 m2 F.A. RISER B (5KG) (5KG)


3.5 m2 Ø65 FCO 130 m2 FCO Ø65
PSV B AC 004
+FFL 25.775 Ø65 F.A.R. B
+FFL 25.775 Ø65 +FFL 25.775 Ø65 Ø65 MDF B
EPX - ELEC RISER B EPX -
AS EPX AC FCO 62 m2

12850
12 m2
ELR B FCO MDF B
+FFL 25.775
+FFL 25.775
HD EPX AC
EPX -

STAIRCASE 003
20 m2

2 1
1 2 3 4

1 2 3 4

1 2 3 4

1 2 3 4

1 2 3 4

1 2 3 4

1 2 3 4

1 2 3 4

1 2 3 4

1 2 3 4

1 2 3 4

1 2 3 4

1 2 3 4

1 2 3 4

EXIT

11300
ST 3
+FFL 25.775

5 4 3
DATA HALL 002 TILES NV

Ø80 WITH 2% SLOPE


817 m2

01
FIBER ENTRY 004
6.2 m2 M002

5 6 7 8

5 6 7 8

5 6 7 8

5 6 7 8

5 6 7 8

5 6 7 8

5 6 7 8

5 6 7 8

5 6 7 8

5 6 7 8

5 6 7 8

5 6 7 8

5 6 7 8

5 6 7 8
LV-19
+FFL 25.775
FE 4 MHE1

8 7 6
AS EPX AC

Ø80 WITH 2% SLOPE


+FFL 25.775 RC APRON TL: 25.0
IL: 22.4 ELV-16
EPX - ELV SERVER ROOM - m2 MHEB2
N 50 m2 - TL: 25.0

02
HOT AISLE CONTAINMENT (WIDTH:1.5M)

HOT AISLE CONTAINMENT (WIDTH:1.5M)

HOT AISLE CONTAINMENT (WIDTH:1.5M)

HOT AISLE CONTAINMENT (WIDTH:1.5M)

HOT AISLE CONTAINMENT (WIDTH:1.5M)

HOT AISLE CONTAINMENT (WIDTH:1.5M)

HOT AISLE CONTAINMENT (WIDTH:1.5M)

HOT AISLE CONTAINMENT (WIDTH:1.5M)


IL: 23.04
ELVSR +FFL 25.175 MHE2

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9
TL: 25.0
+FFL 25.925 HCSS - IL: 22.4
RC PLINTH FOR GENSET & POWER MODULE RCARPET AC
1920 m2 LV-17

BHI
-
+FFL 25.475 HOSE BIBE

03
HDC - FCC / ROCC / ECC ELEC RISER D Ø25
140 m2

EXIT
3 m2
FCC/ROCC/ECC 001 ELR D
R.01 AC RISER B +FFL 25.925 +FFL 25.775
12 m2 RCARPET AC

04
1537 TILES -
A.C.R B

FOR LV SYSTEM

FOR LV SYSTEM
2 NOS 1 ROW Ø150 PIPES

2 NOS 1 ROW Ø150 PIPES


LV-07
+FFL 25.775

37700

12000
MHE2 EPX -
TL: 25.200
IL: 22.884

9980
2 NOS 1 ROW Ø150 PIPES

2 NOS 1 ROW Ø150 PIPES


FOR LV SYSTEM

FOR LV SYSTEM
ELV RISER C

05
6.35 m2
LANDSCAPE ELVR C
297 m2

STAFF CAR PARKING (14 NOS)


MV-14 +FFL 25.775

U-65
+FFL 25.175 EPX AC
+ SL 25.000 MHC1
GRASS - TL: 25.0

06
IL: 23.450

FO-14
FO-14

MHO3
FE - CO2 FE - CO2 FE - CO2 FE - CO2
TL: 25.0
(5KG) (5KG) (5KG) (5KG) IL: 22.0

07
ELV-07

CRAH 003

DATA CENTRE-B
MHEB2
TL: 24.950 130 m2
IL: 22.650 75MMØSP
Ø65 AC 003 Ø65 LIFT LOBBY A
Ø65 +FFL 25.775 Ø65 37 m2

FCO AS EPX AC LL A VISITOR EXHIBITION ROOM


Ø65 FCO

08
Ø65 +FFL 25.775 41 m2
Ø80 MDF
RISER
C Ø80 RISER TILES AC -
27 m2 CORRIDOR
MDF C
FCO 380 m2
+FFL 25.775
CP AC

51600
FCO

9042
EXIT
EXIT

TIXE
+FFL 25.775 -
EPX -

09
+FFL 25.775
EPX AC
FO-06 FCO FCO FCO

12850
MHO4
TL: 25.0
Ø80 RISER CRAH 002 Ø80 RISER
IL: 22.0 Ø65 Ø65
130 m2 FCO

10
AC 002
METAL

Ø65 Ø65 +FFL 25.775 DETECTOR

AS EPX AC

SECURITY
CHECK
STAIRCASE 005 SECURITY
CONTROL
20 m2 PANEL
PH + OHB
ST1 FE - CO2
GVØ100 c/w CONTROL BOX

11
FE - CO2 FE - CO2
(5KG)

U-65
+FFL 25.475 (5KG) (5KG)
METAL -

CHARGER CHARGER CHARGER


ELECTRIC ELECTRIC ELECTRIC

PARKING PARKING PARKING


FUTURE
ELEC RISER A Ø50

LOT
12 m2 BHI ELV-17

24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
650MM WIDTH RC BOX DRAIN WITH HEAVY DUTY GRATING AT 6M C-C ELR A MHEB2
FT

FEMALE TOILET TL: 25.0

12
+FFL 25.775 MHEB2 IL: 23.04
13 m2
EPX - ENTRANCE
IL: 23.04 RAMP
TL: 25.0
ELV-18
H

Ø80 WITH 2% SLOPE


DISABLE TOILET FT FT 001 26.8 m2 MHEB2

FUTURE
G 4 m2 +FFL 25.725
ELV-46 - TL: 25.0
MHE1
TL: 25.0

LOT
DT 001 IL: 23.04

9980
EXIT EXIT TILES MV IL: 22.4
EXIT FT +FFL 25.775 LV-19
+FFL 25.725 HCSS - LV-18
MAKE UP WATER PUMP RM B

13
TILES AC MHE3
TL: 25.0
MAKE UP WATER PUMP RM A 19 m2
UNDERGROUND BLOWDOWN
FT
IL: 22.4

4375
19 m2 MUWP B

HOT AISLE CONTAINMENT (WIDTH:1.5M)

HOT AISLE CONTAINMENT (WIDTH:1.5M)

HOT AISLE CONTAINMENT (WIDTH:1.5M)

HOT AISLE CONTAINMENT (WIDTH:1.5M)

HOT AISLE CONTAINMENT (WIDTH:1.5M)

HOT AISLE CONTAINMENT (WIDTH:1.5M)

HOT AISLE CONTAINMENT (WIDTH:1.5M)


2000 X 2000 RC TRENCH W

FUTURE
TIXE
-
PIPE 2X Ø200 MUWP A +FFL 25.475

HOT AISLE CONTAINMENT (WIDTH:1.5M)

LOT
EPX
EPX MV

U-65
R.01 +FFL 25.475 +FFL 25.775
1537 CLIMBER EPX MV
FT

S.P.R B MEETING ROOM B

14
7.5 m2
RC FLOOR SLAB