Directory of Pages: P-F01A Scope of Work

This document provides design details for a grid-tied photovoltaic system with no energy storage. It involves installing 53676 solar modules mounted on the ground using a pre-engineered system. The modules will connect to eight inverters which will interconnect the solar generation to the local utility's 11kV distribution system. The system is designed to be compliant with applicable codes and manufacturer installation instructions.

Uploaded by

Bilal Asghar
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
18 views

Directory of Pages: P-F01A Scope of Work

This document provides design details for a grid-tied photovoltaic system with no energy storage. It involves installing 53676 solar modules mounted on the ground using a pre-engineered system. The modules will connect to eight inverters which will interconnect the solar generation to the local utility's 11kV distribution system. The system is designed to be compliant with applicable codes and manufacturer installation instructions.

Uploaded by

Bilal Asghar
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 11

P-F01A

DIRECTORY OF PAGES SCOPE OF WORK


PV-1 PROJECT SUMMARY THIS PROJECT INVOLVES THE INSTALLATION OF A GRID
INTERACTIVE PV SYSTEM. PV MODULES WILL BE
PV-2 SITE PLAN MOUNTED USING A PRE-ENGINEERED MOUNTING
SYSTEM. THE MODULES WILL BE ELECTRICALLY
PV-3 SINGLE-LINE DIAGRAM
CONNECTED WITH DC TO AC POWER INVERTERS AND
PV-4 - INTERCONNECTED TO THE LOCAL UTILITY USING
MEANS AND METHODS CONSISTENT WITH THE RULES
PV-5 - ENFORCED BY THE LOCAL UTILITY AND PERMITTING
JURISDICTION.
PV-6 -
PV-7 - THIS DOCUMENT HAS BEEN PREPARED TO DESCRIBE
THE DESIGN OF A PROPOSED PV SYSTEM WITH ENOUGH
PV-8 - DETAIL TO DEMONSTRATE COMPLIANCE WITH

GRID-TIED PV SYSTEM
APPLICABLE CODES AND REGULATIONS. THE DOCUMENT
PV-9 -
SHALL NOT BE RELIED UPON AS A SUBSTITUTE FOR
INVERTER DATASHEET FOLLOWING MANUFACTURER INSTALLATION
APPENDIX

INSTRUCTIONS. THE SYSTEM SHALL COMPLY WITH ALL


MODULE DATASHEET MANUFACTURERS INSTALLATION INSTRUCTIONS, AS
WELL AS ALL APPLICABLE CODES. NOTHING IN THIS
- DOCUMENT SHALL BE INTERPRETED IN A WAY THAT
OVERRIDES THEM. CONTRACTOR IS RESPONSIBLE FOR
- VERIFICATION OF ALL DETAILS IN THIS DOCUMENT.

PROJECT DETAILS SYSTEM DETAILS


- NEW GRID-INTERACTIVE
PROPERTY OWNER PHOTOVOLTAIC SYSTEM
DESCRIPTION
WITH NO ENERGY
1 STORAGE
PROPERTY ADDRESS PARCEL
DC RATING OF SYSTEM 28.98 MW
PV-1 SCALE: NTS
COMMERCIAL AC OUTPUT RATINGS 20 MW
ZONING
UTILITY COMPANY - INVERTER(S) 8 x SG2500HV-MV-20

ELECTRICAL CODE 2020 NEC (NFPA 70)


MODULE(S) 53676 x JKM-540M-72HL4-TV
FIRE CODE 2020 NFPA 1
OTHER BUILDING CODES 2022 CT BUILDING CODE
ARRAY WIRING (1988) STRINGS OF 27

INTERCONNECTION DETAILS

POINT OF GRID TIED INTERCONNECTION AT


INTERCONNECTION THE UTILITY SUBSTATION
PROJECT SUMMARY
UTILITY SERVICE 11kV 3-Φ

REVISIONS

2 LOCAL
PV-1 SCALE: NTS

PV-1
P-F01A
GENERAL NOTES
EQUIPMENT LIKELY TO BE WORKED UPON WHILE ENERGIZED SHALL
1 BE INSTALLED IN LOCATIONS THAT SATISFY MIN. WORKING
CLEARANCES PER NEC 110.26.

2 24/7 UNESCORTED KEYLESS ACCESS SHALL BE PROVIDED TO ALL


UTILITY EQUIPMENT.

CONTRACTOR SHALL USE ONLY OMPONENTS LISTED BY A

1
3 NATIONALLY RECOGNIZED TESTING LABORATORY FOR THE
INTENDED USE.

CONTRACTOR IS RESPONSIBLE FOR FURNISHING ALL EQUIPMENT,

4 CABLES, ADDITIONAL CONDUITS, RACEWAYS, AND OTHER


ACCESSORIES NECESSARY FOR A COMPLETE AND OPERATIONAL PV
SYSTEM.

GRID-TIED PV SYSTEM
2 ALL EXPOSED PV CONDUCTORS NOT UNDER THE ARRAY SHALL BE
5 PROTECTED BY A RACEWAY WITH A LISTED JUNCTION BOX AT BOTH
ENDS AND COMPLY WITH NEC 690.31(A).

5 WHERE DC PV SOURCE OR DC PV OUTPUT CIRCUITS ARE RUN INSIDE


THE BUILDING, THEY SHALL BE CONTAINED IN METAL RACEWAYS,
6 TYPE MC METAL-CLAD CABLE, OR METAL ENCLOSURES FROM THE
POINT OF PENETRATION INTO THE BUILDING TO THE FIRST READILY
ACCESSIBLE DISCONNECTING MEANS, PER NEC 90.31(G).

ALL EMT CONDUIT FITTINGS SHALL BE LISTED AS WEATHERPROOF


7 FITTINGS AND INSTALLED TO ENSURE A RAINTIGHT FIT, PER NEC
358.42.

1 (E) 11kV MV POWER LINES

(N) MV SUBSTATION
3 2
4
(E) PLOT BOUNDARY
3

4 (N) INVERTERS

(N) PROPOSED GROUND-MOUNTED PV ARRAY.


5 AS FOLLOWS

SITE PLAN

REVISIONS

1 SITE PLAN
PV-2 SCALE: NTS
PV-2
P-F01A
NOTES
1. IN CASE OF OUT DOOR INVERTER INCUBICLE,THE INBUILT LT TRANSFORMER FOR
AUX SUPPLY SHOULD BE DESIGNED AND SIZED IN ORDER TO TAKE CARE OF ALL
Jinko Solar
JKM540M-72HL4-V
Jinko Solar
JKM540M-72HL4-V
Jinko Solar
JKM540M-72HL4-V
Jinko Solar
JKM540M-72HL4-V
Jinko Solar
JKM540M-72HL4-V
Jinko Solar
JKM540M-72HL4-V
Jinko Solar
JKM540M-72HL4-V
Jinko Solar
JKM540M-72HL4-V EMERGENCY LOADS AND MISCELLANEOUS LOADS RELATED TO MAINTENANCE
27 27 27 27 27 26 26 26

6 sq.mm
x252
6 sq.mm
x252
6 sq.mm
x252
6 sq.mm
x252
6 sq.mm
x252
6 sq.mm
x252
6 sq.mm
x252
6 sq.mm
x252
ACTIVITY THE 415VAUXILIARY ACDB FOR CMCS ROOM SHALL HAVE TWO ACDB
Cu XLPE, 1500V

~ 60 mtr
Cu XLPE, 1500V

~ 30 mtr
Cu XLPE, 1500V

~ 60 mtr
Cu XLPE, 1500V

~ 30 mtr
Cu XLPE, 1500V

~ 60 mtr
Cu XLPE, 1500V

~ 30 mtr
Cu XLPE, 1500V

~ 60 mtr
Cu XLPE, 1500V

~ 30 mtr SECTION FED FROM TWO DIFFERENT SOURCE.


DC Disconnects DC Disconnects DC Disconnects DC Disconnects DC Disconnects DC Disconnects DC Disconnects DC Disconnects
2. SUITABLE UPS OR DC SYSTEM IS TO BE PROVIDED FOR AUXILIARY POWER SUPPLY
INVERTER
SG2500HV-MV-20
INVERTER
SG2500HV-MV-20
INVERTER
SG2500HV-MV-20
INVERTER
SG2500HV-MV-20
INVERTER
SG2500HV-MV-20
INVERTER
SG2500HV-MV-20
INVERTER
SG2500HV-MV-20
INVERTER
SG2500HV-MV-20
FOR PCS(if required) AND OTHER PROTECTION,CONTROL AND ANY EMERGENCY
LOADS.UPS/SUITABLE DC SYSTEM IS TO BE DESIGNED WITH BACKUP TIME AS PER
2500 kVA 2500 kVA 2500 kVA 2500 kVA 2500 kVA 2500 kVA 2500 kVA 2500 kVA

AC Solar
Disconnect
AC Solar
Disconnect
AC Solar
Disconnect
AC Solar
Disconnect
AC Solar
Disconnect
AC Solar
Disconnect
AC Solar
Disconnect
AC Solar
Disconnect
TECHNICAL SPECIFICATION.
3. THE INVERTER TRANSFORMER ARRANGEMENT SHOWN IS TYPICAL,THE
Transformer
0.6kV / 11kV
Transformer
0.6kV / 11kV
Transformer
0.6kV / 11kV
Transformer
0.6kV / 11kV
TRANSFORMER CONFIGURATION,VECTOR GROUP,IMPEDANCE,INSULATION
CLASS,ETC.AS PER INVERTER MANUFACTURER RECOMMENDED DESIGN
AUX. TRAFO AUX. TRAFO AUX. TRAFO AUX. TRAFO
0.6 / 0.415 kV 0.6 / 0.415 kV 0.6 / 0.415 kV 0.6 / 0.415 kV

50
50N
51
51N
50
50N
51
51N
50
50N
51
51N
50
50N
51
51N
PARAMETER ARRANGEMENT.
AUX. ACDB AUX. ACDB AUX. ACDB AUX. ACDB

4. THE NO. OF INVERTER AND INVERTER TRANSFORMER AS INDICATED IS


PREFERABLE MODE OF POWER FEEDING ARRANGEMENT. HOWEVER BIDDER MAY
UPS UPS UPS UPS
MISC. LT LOADS MISC. LT LOADS MISC. LT LOADS MISC. LT LOADS
LIGHTING
TVM LIGHTING
TVM LIGHTING
TVM LIGHTING
TVM

GRID-TIED PV SYSTEM
WASHING ETC. WASHING ETC. WASHING ETC. WASHING ETC.

PCU CONTROL SUPPLY & PCU CONTROL SUPPLY & PCU CONTROL SUPPLY & PCU CONTROL SUPPLY &
OFFER ALTERNATIVE POWER SUPPLY ARRANGEMENT CONSIDERING THE
OTHER EMERGENCY LOADS OTHER EMERGENCY LOADS OTHER EMERGENCY LOADS OTHER EMERGENCY LOADS

STANDARDIZATION OF RATING FOR MAINTAINING MINIMUM SPARES.


5. BIDDER MAY PROVIDE INDOOR OR OUTDOOR ICOG NEAR INVERTER AND TIE
IR-1 IR-2 TRANSFORMER MEETING THE TECHNICAL SPECIFICATION REQUIREMENT.
6. IN CASE OF BIDDER INTENDED TO MERGE LT POWER SUPPLY BOARDS OF 33kv
11kV ARMOURED CABLES
FROM INVERTER TO CMCS
11kV ARMOURED CABLES
FROM INVERTER TO CMCS
11kV ARMOURED CABLES
FROM INVERTER TO CMCS
11kV ARMOURED CABLES
FROM INVERTER TO CMCS
CMCS SWITCHGEAR ROOM AND INVERTERS OF IR-2 THEN SAME SHALL BE
SWITCHYARD SWITCHYARD SWITCHYARD SWITCHYARD
LOCATED AT CMCS BUILDING WITH TWO FEEDERS AS INDICATED FOR CMCS
1 CONDUCTORS PER PHASE OF
150 sq.mm CABLE
1 CONDUCTORS PER PHASE OF
150 sq.mm CABLE
1 CONDUCTORS PER PHASE OF
150 sq.mm CABLE
1 CONDUCTORS PER PHASE OF
150 sq.mm CABLE ROOM.THE SUPPLY FROM THIS DB CAN BE EXTENDED FOR IR-2 & ASSOCIATED
AL/XLPE/PVC AL/XLPE/PVC AL/XLPE/PVC AL/XLPE/PVC
EQUIPMENT.
50 METERS UNDERGROUND 50 METERS UNDERGROUND 50 METERS UNDERGROUND 50 METERS UNDERGROUND
CABLE LAYING CABLE LAYING CABLE LAYING CABLE LAYING 7. BIDDER TO INTEGRATE REAL TIME DATA OF TARIFF METERS TO 'METER DATA
40°C AMBIENT TEMPERATURE 40°C AMBIENT TEMPERATURE 40°C AMBIENT TEMPERATURE 40°C AMBIENT TEMPERATURE
MANAGEMENT SYSTEM AMI SYSTEM AT RLDC & OWNER'S COMMUNICATION
1 MTR DEPTH OF LAYING 1 MTR DEPTH OF LAYING 1 MTR DEPTH OF LAYING 1 MTR DEPTH OF LAYING
SYSTEM INFRASTRUCTURE(DCU,DATA CARRIER,ETC.)SOFTWARE AS PER
RELEVANT METERING REGULATION AND RLDC/SLDC REQUIREMENT.
8. BIDDER TO PROVIDE NECESSARY ARRANGEMENT TO TRANSMIT SOLAR PLANT
DATA TO STATE LDC/RLDC/REMC AS PER TELEMETRY REQUIREMENT OF RELEVANT
REGULATION RLDC/SLDC REQUIREMENT.NECESSARY COMMUNICATION
INFRASTRUCTURE/ SOFTWARE IN THIS REGARD UP TO RLDC/ SLDC SHALL BE
UNDER BIDDER'S SCOPE.
50 51 50 51 50 51 50 51
9. THE METALLIC SCREEN/ ARMOUR OF CORE AND CONDUCT OR OF HT CABLE SHALL
BE CAPABLE OF CARRYING ACTUAL CABLE EARTH FAULT CURRENT.
50N 51N 50N 51N 50N 51N 50N 51N

LINE PT LINE PT LINE PT LINE PT


10. PROTECTION DETAILS ARE TENTATIVE ONLY,PROTECTION PHILOSOPY SHALL BE
BUS PT
DECIDED DURING DETAILED ENGINEERING AS PER TECHNICAL SPECIFICATION.
R

11. CT AND PT DETAIL ARE INDICATIVE ONLY AND SHALL BE FINALIZED DURING DETAIL
ENGINEERING AND AS PERT ECHNICAL SPECIFICATION.
12. ANY KIND OF DEMOLITION,ROAD CONSTRUCTION,STRUCTURE FOR RAILWAY AND
ROAD CROSSING .TEMPORARY AND PERMANENT APPROACH ETC FOR LAYING OF
CABLE,SWITCHYARD MODIFICATION SHALL HAVE TO BE CARRIED OUT BY BIDDER.
(SAME AS IN COMER FEEDER) (SAME AS IN COMER FEEDER)
SPARE SPARE

TVM TVM
AUXILIARY SUPPLY AUXILIARY SUPPLY
FEEDER
(AS APPLICABLE)
FEEDER
(AS APPLICABLE)
MODULES INVERTER

QTY 53,676 QTY 8

PS CLASS PS CLASS
CT CT
MODEL JINKO SOLAR JKM540M-72HL4-V MODEL SUNGROW SG2500HV-MV-20

PMAX 540W AC VOLTAGE 11kV - 35kV


89 67 89 67
50 51 50 51
50N 51N 27 271 50N 51N 27 271

ISC 13.85A GROUND NOT SOLIDLY GROUNDED


LINE PT LINE PT

IMP 13.27A RATED POWER 2.5 MW

TEM ABT METER TEM ABT METER


VOC 49.42V MAX OUTPUT CURRENT 2886 A
(MAIN OUTGOING FEEDER) (MAIN OUTGOING FEEDER)

VMP 40.70V MAX INPUT CURRENT 1 x 3508A


SINGLE LINE DIAGRAM
TEMP. COEFF. OF Voc MAX INPUT VOLTAGE 1500Vdc

-0.28 %/C, -0.0138 V/C CEC WEIGHTED EFFICIENCY 98.3%


11kV ARMOURED CABLES 11kV ARMOURED CABLES
FROM SWITCHYARD TO LOADS FROM SWITCHYARD TO LOADS

4 CONDUCTORS PER PHASE OF 4 CONDUCTORS PER PHASE OF


300 sq.mm CABLE 300 sq.mm CABLE
AL/XLPE/PVC AL/XLPE/PVC
SYSTEM SUMMARY
2.5 KM UNDERGROUND CABLE 2.5 KM UNDERGROUND CABLE
LAYING LAYING

40°C AMBIENT TEMPERATURE 40°C AMBIENT TEMPERATURE STRINGS STRINGS


1 MTR DEPTH OF LAYING 1 MTR DEPTH OF LAYING
(26 PANELS) (27 PANELS)

NO. OF STRINGS 728 1260

NOMINAL STRING VOLTAGE 1284.9 V 1334.34V


TO 132kV SWITCHYARD
ARRAY OPERATING CURRENT 13.27A 13.27A REVISIONS
ARRAY STC POWER 14.04 kW 14.58W

1 SINGLE-LINE DIAGRAM
PV-2 SCALE: NTS

PV-3