L4-Station1980-Station2080-Rfi-4 - 2024-01-02

This RFI form requests an inspection of excavation work for 600mm diameter pipes along a 4 km main pipeline from Station 1980 to Station 2080 in Dirab, Saudi Arabia. The contractor, Zahran Maintenance and Operation, confirms the work is ready for inspection by the project management office (PMO) on December 28, 2023 at 9:30 AM. The consultant engineer inspected the work and approved it, finding the excavation levels according to the profile.

Uploaded by

fkec5309
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
48 views1 page

L4-Station1980-Station2080-Rfi-4 - 2024-01-02

This RFI form requests an inspection of excavation work for 600mm diameter pipes along a 4 km main pipeline from Station 1980 to Station 2080 in Dirab, Saudi Arabia. The contractor, Zahran Maintenance and Operation, confirms the work is ready for inspection by the project management office (PMO) on December 28, 2023 at 9:30 AM. The consultant engineer inspected the work and approved it, finding the excavation levels according to the profile.

Uploaded by

fkec5309
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Replacing TSE Transmission Lines From Manfouha Pump Station To Al-

Project Title ‫اﺳﻢ اﻟﻤﺸﺮوع‬ Project No. ‫رﻗﻢ اﻟﻤﺸﺮع‬


Haier And Dirab , And Linking Them To Existing Facilities
Client ‫اﻟﻤﺎﻟﻚ‬ Saudi Irrigation Organization Contract No. ‫رﻗﻢ اﻟﻌﻘﺪ‬
Fouad Al Saleh & Khaled Al Dhowalia Co.Enviromental Engineering
Consultant ‫اﻹﺳﺘﺸﺎري‬ Site No. ‫رﻗﻢ اﻟﻤﻮﻗﻊ‬
Consultants
Contractor ‫اﻟﻤﻘﺎول‬ Zahran Maintenance and Operation
IR Number
L4-STATION1980-STATION2080-RFI-4
‫ر ﻗ ﻢ ﻃ ﻠ ﺐ ا ﻟ ﻤ ﻌﺎﻳ ﻨ ﺔ‬
IR Issue Date
2023-12-28 08:37:48
‫ﺗﺎرﻳ ﺦ ر ﻓ ﻊ ﻃ ﻠ ﺐ ا ﻟ ﻤ ﻌﺎﻳ ﻨ ﺔ‬
Request For Inspection Form (RFI) Date of Inspection
‫ﻧ ﻤ ﻮ ذ ج ﻃ ﻠ ﺐ ﻣ ﻌﺎﻳ ﻨ ﺔ‬ ‫ا ﻟ ﻤ ﻮ ﻋ ﺪ ا ﻟ ﻤ ﻄ ﻠ ﻮ ب ﻟ ﻠ ﻤ ﻌﺎﻳ ﻨ ﺔ‬ 2023-12-28
‫) ) ا ﻟ ﺘﺎرﻳ ﺦ‬
Time of Inspection
‫ا ﻟ ﻤ ﻮ ﻋ ﺪ ا ﻟ ﻤ ﻄ ﻠ ﻮ ب ﻟ ﻠ ﻤ ﻌﺎﻳ ﻨ ﺔ‬ 09:30:00
‫))اﻟﻮﻗﺖ‬
The PMO is notified for the WORK INSPECTION of the following: ‫ﻳﺘﻢ إﺧﻄﺎر إدارة اﻟﺒﺮﻧﺎﻣﺞ ﺑﻔﺤﺺ اﻟﻌﻤﻞ ﻟﻤﺎ ﻳﻠﻲ‬
Submitted By Fouad Al Saleh & Khaled Al Dhowalia Co.Enviromental
Zahran Maintenance and Operation To: ‫ إﻟﻰ‬:
‫ﺗ ﻢ ا ﻟ ﺘ ﻘ ﺪﻳ ﻢ ﻣ ﻦ ﻗ ﺒ ﻞ‬ Engineering Consultants

Discipline ☐ Geotechnical
‫ﺟﻴ ﻮﺗ ﻘﻨ ﻲ‬
☑ Survey ‫ﻣﺴﺎﺣﺔ‬ ☐ Civil/Str. ‫إﻧﺸﺎﺋﻲ‬/‫ﻣﺪﻧﻲ‬ ☐ Architectural ‫ﻣﻌﻤﺎري‬
‫اﻟ ﺘ ﺨ ﺼ ﺺ‬

☐ Electrical ‫ﻛﻬﺮﺑﺎء‬ ☐ Mechanical ‫ﻣﻴﻜﺎﻧﻴﻜﺎ‬ ☐ Landscape ‫ﻻﻧﺪ ﺳﻜﻴﺐ‬ ☐ Other ‫ﻏﻴﺮ ذﻟﻚ‬

Description of Work
‫و ﺻ ﻒ ا ﻷ ﻋ ﻤﺎ ل‬ ‫ دﻛﺘﺎﻳﻞ ﻣﻦ‬600‫ اﺳﺘﻼم ﻗﺎع اﻟﺤﻔﺮ ﻟﻠﻤﻮاﺳﻴﺮ ﻗﻄﺮ ال‬ST 2040 - ST 1980
‫ا ﻟ ﺘ ﻲ ﺳ ﻴ ﺘ ﻢ ﻣ ﻌﺎﻳ ﻨ ﺘ ﻬﺎ‬

Location ‫ﻣﻜﺎن اﻟﻤﻌﺎﻳﻨﺔ‬ Block No ‫رﻗﻢ اﻟﻤﺒﻨﻲ‬ Level ‫اﻟﻄﺎﺑﻖ‬ Element to be inspected ‫اﻟﻌﻨﺎﺻﺮ اﻟﻤﺮاد ﻣﻌﺎﻳﻨﺘﻬﺎ‬ Attachments ‫اﻟﻤﺮﻓﻘﺎت‬

4 ‫ ﺧ ﻂ‬- ‫ ﺧ ﻂ رﺋ ﻴ ﺴ ﻲ‬- ‫دﻳ ﺮ ا ب‬ STATION1980-STATION2080

Contractor’s Site Engineer ‫)ﻣﻬﻨﺪس اﻟﻤﻮﻗﻊ )اﻟﻤﻘﺎول‬


Signature ‫اﻟ ﺘ ﻮ ﻗ ﻴ ﻊ‬ Date 2023-12-28 ‫ا ﻟ ﺘﺎرﻳ ﺦ‬
Name khaled saied ‫اﻻ ﺳﻢ‬

Checked By Contractor’s QA/QC Engineer


‫ﺗ ﻢ ﻓ ﺤ ﺺ ا ﻷ ﻋ ﻤ ﺎ ل ﻣ ﻦ ﻗ ﺒ ﻞ ﻣ ﻬ ﻨ ﺪ س ﺿ ﻤ ﺎ ن و ﻣ ﺮ ا ﻗ ﺒ ﺔ اﻟ ﺠ ﻮ د ة ﻟ ﻠ ﻤ ﻘ ﺎ و ل‬ ☑ YES ‫ﻧﻌﻢ‬ Signature ‫اﻟﺘﻮﻗﻴﻊ‬
Is the work ready for PMO’s Inspection
‫ﻫ ﻞ ا ﻷ ﻋ ﻤ ﺎ ل ﺟ ﺎ ﻫ ﺰ ة ﻟ ﻤ ﻌ ﺎ ﻳ ﻨ ﺔ إ د ار ة اﻟ ﺒ ﺮ ﻧ ﺎ ﻣ ﺞ‬
Name khaled saied ‫اﻻ ﺳﻢ‬ ☐ No ‫ﻻ‬

☐ Geotechnical
‫ﺟﻴ ﻮﺗ ﻘﻨ ﻲ‬
☑ Survey ‫ﻣﺴﺎﺣﺔ‬ ☐ Civil/Str. ‫إﻧﺸﺎﺋﻲ‬/‫ﻣﺪﻧﻲ‬ ☐ Architectural ‫ﻣﻌﻤﺎري‬

Response of
Consultant’s ☐ Electrical ‫ﻛﻬﺮﺑﺎء‬ ☐ Mechanical ‫ﻣﻴﻜﺎﻧﻴﻜﺎ‬ ☐ Landscape ‫ﻻﻧﺪ ﺳﻜﻴﺐ‬ ☐ Other ‫ﻏﻴﺮ ذﻟﻚ‬
Engineer ‫رد ﻣﻬﻨﺪس‬
‫ا ﻻ ﺳ ﺘ ﺸﺎر ي‬
Inspection done
As per profile excavation levels are ok

☑ Approved
‫ﻣ ﻮا ﻓ ﻘ ﺔ‬
☐ Approved as Noted
‫ﻣ ﻮ ا ﻓ ﻘ ﺔ ﻣ ﻊ ﻣ ﻼ ﺣ ﻈﺎ ت‬
☐ Revise and Resubmit
‫ﻣ ﺮ ا ﺟ ﻌ ﺔ و إ ﻋﺎ د ة ﺗ ﻘ ﺪﻳ ﻢ‬
☐ Rejected
‫ﻣﺮﻓﻮ ض‬
Inspected by Consultant’s Authorized Person ‫ﺗﻤﺖ اﻟﻤﻌﺎﻳﻨﺔ ﻣﻦ ﻗﺒﻞ اﻟﺸﺨﺺ اﻟﻤﺨﻮل ﻣﻦ ﻗﺒﻞ‬
‫ا ﻻ ﺳ ﺘ ﺸ ﺎر ي‬ Approved by Consultant’s Project Engineer ‫ﻳﻌﺘﻤﺪ ﻣﻦ ﻗﺒﻞ ﻣﻬﻨﺪس اﻟﻤﺸﺮوع ﻟﻼﺳﺘﺸﺎري‬

Name: ‫ﻋ ﻤﺎ د اﻟ ﺪﻳ ﻦ ﺷﺎ ﻫ ﺪ‬ ‫اﻻ ﺳﻢ‬ Name: ‫ا ﺣ ﻤ ﺪ ﻧ ﺒ ﻴ ﻞ اﺑ ﻮ ﻏ ﺮﺑ ﻴ ﺔ‬ ‫اﻻ ﺳﻢ‬

Signature ‫اﻟ ﺘ ﻮ ﻗ ﻴ ﻊ‬ Signature ‫اﻟ ﺘ ﻮ ﻗ ﻴ ﻊ‬

Date 2023-12-31 ‫ا ﻟ ﺘ ﺎر ﻳ ﺦ‬ Date 2023-12-31 ‫ا ﻟ ﺘ ﺎر ﻳ ﺦ‬

Received By Contractor
Name ‫اﻻ ﺳﻢ‬ Date ‫ا ﻟ ﺘﺎرﻳ ﺦ‬ Signature ‫اﻟ ﺘ ﻮ ﻗ ﻴ ﻊ‬
‫ﺗ ﻢ ا ﻻ ﺳ ﺘ ﻼ م ﻣ ﻦ ﻗ ﺒ ﻞ اﻟ ﻤ ﻘ ﺎ و ل‬

Approval of items does not relieve the contractor from his obligation to comply with the requirements of the contract’s plan and
‫اﻟ ﻤ ﻮا ﻓ ﻘ ﺔ اﻟ ﻤ ﺘ ﻀ ﻤ ﻨ ﺔ ﻓ ﻲ ﻫ ﺬا اﻟ ﻨ ﻤ ﻮ ذ ج ﻻ ﺗ ﻌ ﻔ ﻲ اﻟ ﻤ ﻘ ﺎ و ل ﻣ ﻦ اﻟ ﺘ ﺰا ﻣ ﻪ ﺑ ﺎ ﻻ ﻣ ﺘ ﺜ ﺎ ل ﻟ ﻤ ﺘ ﻄ ﻠ ﺒ ﺎ ت ﺧ ﻄ ﺔ اﻟ ﻌ ﻘ ﺪ‬
Note: project specification. ‫ﻣﻼﺣ ﻈﺔ‬
‫ ﻳ ﻘ ﻮ م ﻣ ﻤ ﺜ ﻞ ا ﻻ ﺳ ﺘ ﺸ ﺎ ر ي ﺑ ﺎ ﺳ ﺘ ﻼ م اﻟ ﻄ ﻠ ﺐ و ﺗ ﻮ ﻗ ﻴ ﻌ ﻪ وإ ﻋ ﺎ د ة ﻧ ﺴ ﺨ ﺔ وا ﺣ ﺪ ة إﻟ ﻲ اﻟ ﻤ ﻘ ﺎ و ل‬. ‫و ﻣ ﻮا ﺻ ﻔ ﺎ ت اﻟ ﻤ ﺸ ﺮ و ع‬
Consultant’s Representative is to acknowledge receipt by signing and returning one copy to the Contractor

Rev001