Company Profile: © Confederation of Indian Industry Pradip Nikam - HSE Manager Irfan Ahmed - Project Manager

This document outlines Elkem's 7-step contractor management process to ensure health and safety of contract workers. The steps include: 1) selecting contractors based on their HSE capabilities and records; 2) ongoing evaluation, communication and engagement; 3) daily engagement with workers; 4) training programs; 5) access control and responsibilities; 6) empowering workers to report issues; and 7) providing PPE, equipment safety, inspections and audits. Following this process over 2 years resulted in over 2.5 lakh safe work hours across multiple major projects with 25 contractors and no lost-time injuries.

Uploaded by

Anoop Prajapati
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
44 views

Company Profile: © Confederation of Indian Industry Pradip Nikam - HSE Manager Irfan Ahmed - Project Manager

This document outlines Elkem's 7-step contractor management process to ensure health and safety of contract workers. The steps include: 1) selecting contractors based on their HSE capabilities and records; 2) ongoing evaluation, communication and engagement; 3) daily engagement with workers; 4) training programs; 5) access control and responsibilities; 6) empowering workers to report issues; and 7) providing PPE, equipment safety, inspections and audits. Following this process over 2 years resulted in over 2.5 lakh safe work hours across multiple major projects with 25 contractors and no lost-time injuries.

Uploaded by

Anoop Prajapati
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 9

COMPANY PROFILE

Representative :-
Pradip Nikam – HSE Manager
© Confederation of Indian Industry
Irfan Ahmed – Project Manager
1. Selection of Contractors

Background Receive Proposals Running Site Inspections


Defining the scope of
Inspections / from contractors for reverification
Project Work
performance check

Size of the Project


• Documents related to • Detailed review of • Elkem project’s team
Internal External
work executed in past Proposal received facilited by contractor
particularly “RISK from Elkem Project’s. visits site to see best
• Civil Work
ASSESMENTS” • Highlights special practices.
• Mechanical Work
• HSE Records focused shown on HSE • On site Risk Control
• Electrical Work Documents – JSA etc.
• Verification of Co. • Special Standards &
• Fabrication Work associated with Guidelines described • Interaction with
• Review of Drawing & contractor & there to perform projects as contractors employees.
technical requirements safety culture. per Elkem Zero Harm
policy. Like, • Inspection of HSE
• Specific HSE • Technical Capabilities resources in place, like
Requirements • Employment PPE’s, Equip. etc
• Overall resources Protection Act and
• Deliverables available compliance with
• Same Field Work, Like • Resources specific to legislation on working Contractor HSE Contractor
WAH experience for HSE hours will etc. Plan Development On Board
chimney etc… • Successful Projects
handled
© Confederation of Indian Industry
2. Evaluation, Re-evaluation, Communication & Engagement with
Contractors
• Due Diligence process :-
Detailed HSE Plan of Project
• Irrespective of L1/L2/L3 cost extra
weightage for good HSE focus on Projects
• Project Risk Management approach
• Employees on long contract roles
• Capability to handle Emergency
• Employee welfare, policy & treatments.
• Contractor HSE Professional & Supervisors are
must to ensure safe execution of work.
• Resources mapping :-
• Communicating Elkem requirements
related to mobile equip., excavation m/c’s,
electrical m/c’s etc.
• Management of Contractors sub-contract work
through Elkem only by deciding scope.

© Confederation of Indian Industry


Detailed Risk Assessment
3. Engagement with Contract workers: (Communication, motivation,
participation in events, meetings etc. wellness and well-being)

• Daily HSE Schedule monitoring & Inspections :-


• Daily - Tool Box Talk’s & Morning Meeting.
• On Site Safe Job Analysis.
• Advance Daily Project Planning Meeting
• Elkem Job Observations & Inspections
• BBS :- Included in Behaviour based safety.
• Weekly – Safety Committee Meeting including
contractor. Review of Deviations & actions.
• MIS to Elkem Management.

• Fortnightly – Project Manager & Head


Contractor review & planning.
• Monthly – Local Management walk &
Distribution of incentives & rewards.

• Project Audits – Elkem Management


/Corporate & Contractors.
© Confederation of Indian Industry
4. Capability Building of Contract workers: (Induction, Training &
effectiveness)
• Contractors Induction Plan:-
• Before Allotting Work -
• One day of intensive HSE Basic Training like, Like
use of PPE’s, Safe Job Analysis , Safe & U/S Acts.
• Physical & Medical like, Vertigo & Thyroid for
WAH.
• Technical Qualification to ensure quality work.
• 2 Hrs of On Job Risk Assessment & SJA
Filled SJA By Contractor Sup.
demonstrations with PPE’s fitness test.
• Que’s & Ans’s post training for verifications.
• Issue “White Card”.
• After Allotting Work :-
• On site Safe Job Analysis & Participation.
• Ensure participation in TBT & reporting.
Contractor Safety
• Job Observations from HSE Supervisor to ensure Video
Package for Contractor
SOP and on time correction & support. Training
• Senior Management Team of Plant perform JO.
• Emergency & First Aid training with mock drills.
• LSR Rules follow Up & Adhrence.© Confederation of Indian Industry
Training Effectiveness
5. Access Control, Authorization & Responsibilities of Contract
workers
• “HSE Plan” for contractor developed with
contractor by Elkem Project management.
• Written responsibilities for Contractor
HSE Supervisor & Contractor Operators
• Ensure co-ordination between Elkem &
contractor HSE functioning.
• Responsible for incident reporting.
• Operators' responsibility to follow all
rules & regulations described in HSE Plan.
• Empowered to say “NO” to hazardous
operations
• “White Card” is mandatory pass for contractor
operators to get enter premises.
• Legal Document Verifications & Insurance
related verification for all contractor
employees
• Colour Coding of Apron for identification of
different contractor’s operators.
© Confederation of Indian Industry
6. Empowerment to Report OHS Issues (Reporting of accidents, near
miss, unsafe conditions, and unsafe actions)
• Rewards :- Contractor operators & supervisors
shall get additional monetary benefits for
following PPE’s rules & other HSE regulations.
• Use “Synergy” S/W for deviations.
• Live “What's App” group for each projects &
updates taken real time .

• Daily Toolbox Talk for facilitation of reporting.

• Monitoring of Permits Issues on daily basis.

• As Per HSE Plan – Its mandatory for contractors


Live WhatsApp group
to report each incidents, U/C & U/A promptly.

• Suggestions in written formats taken.

• Open access for replacement or return PPE’s


without cost barriers – Elkem Control.
© Confederation of Indian Industry
Incentive Criteria
7. Other Measures including PPE's, Technologies, Equipment safety,
inspections, audits etc. to ensure health & safety of the contract workers
• PPE’s :- Mandatory PPE’s supported by Elkem

• Equipment's :- Scissor lift for Height Work.


Power tools procured by Elkem. Electrical –
IP67 fittings, ATEX Equip. As per zone work.

• Audits :- “Tested” Tag of Elkem mandatory.


Special format for JO, Standards Audit etc.
• Daily Safety Walks, Weekly Safety Walks &
Corporate Projects audits scheduled as.
Scissor Lift Use
• Resources :- Hydration facilities in Test Tag

summertime, Food, Staggered WO/Shifts in


hot conditions.
• Elkem OHS Dr available for periodic medical
support to contractor employees.

• All Projects Sites are Under CCTV surveillance


monitored from project control Room. Specific JO
© Confederation of Indian Industry Physical Barricading of civil site
7. Results :-

• More that 2.5 lacs Hr’s of Safe Work.

• More than 25 Contractor engaged.

• Delivered Five Major Projects in 2 years

• HSE Audits – 34 Local & 4 Corporate

MIS Project Work

New CSP With DC

Furnace Expansion © Confederation of Indian Industry New R&D Set Up