0% found this document useful (0 votes)
21 views

1 Design Analysis

This document summarizes the load calculations and circuit requirements for electrical design of a building. It calculates lighting, air conditioning, cooking, water heating and other loads. The total computed load is 56,356VA. It recommends using 24 15A circuits, 17 20A circuits and 17 30A circuits. The required service entrance conductors are two 150mm2 wires rated for 285A. The maximum protective device is 300A fuse or 400A circuit breaker.

Uploaded by

Daryl Balgos
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
21 views

1 Design Analysis

This document summarizes the load calculations and circuit requirements for electrical design of a building. It calculates lighting, air conditioning, cooking, water heating and other loads. The total computed load is 56,356VA. It recommends using 24 15A circuits, 17 20A circuits and 17 30A circuits. The required service entrance conductors are two 150mm2 wires rated for 285A. The maximum protective device is 300A fuse or 400A circuit breaker.

Uploaded by

Daryl Balgos
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

DESIGN ANALYSIS

I. LIGHTHING AND CONVENIENCE RECEPTACLE LOAD:


(SEE SEC. 2.20.3.23, PEC 2017)

LIGHTING & CONVENIENCE RECEPTACLE LOAD:


(SEE SEC. 2.20.3.23, PEC-2017)
1020 sq. m x 24 VA/sq. m = 26400 VA
PROVIDE 24-15A & 17-20A FOR LIGHTING
& CONVENIENCE RECEPTACLE CIRCUITS
TOTAL ACTUAL LOAD: =26400 VA

II. AIR CONDITIONING LOAD


3-1.5 HP, & 7-1.0HP ROOM AIR CONDITIONING UNIT
(SEE SEC. 2.20.3.23 & TABLE 4.30.14.2, PEC-2017)
10A x 230V x 3 = 6900 VA
8 A x 230V x 7 = 12880 VA
PROVIDE 9-30A ROOM ACU CIRCUITS
TOTAL = 19 780 VA

III. COOKING LOADS


1-1.5 KW MICROWAVE OVEN
(SEE SEC. 2.20.3.16, COLUMN A, PEC-2017)
1500W x 0.8 = 1200 VA
PROVIDE 1-30A MICROWAVE OVEN CIRCUIT
TOTAL = 1200 VA

IV. OTHER LOADS


1 REFRIGERATOR = 1500 VA
PROVIDE 1-20A REF CIRCUIT

1 WATER DISPENSER = 1840 VA


PROVIDE 1-30A REF CIRCUIT

1 - 5KW WATER HEATER = 10000 VA


PROVIDE 2-30A WATER HEATER CIRCUIT

1 -1.5 HP WATER PUMP = 2300 VA


PROVIDE 1 -30 A WATER PUMP CIRCUIT

1 DISH WASHER = 2300 VA


PROVIDE 1 -30 A WATER PUMP CIRCUIT

1 LAUNDRY WASHING MACHINE


(SEE SEC. 2.20.1.11(C)(2)) = 1500 VA
PROVIDE 1-20A WASHING MACHINE CIRCUIT

2-3910 SPARE = 3000 VA


TOTAL = 22 440 VA
APPLICATION OF DEMAND FACTOR:
(SEE SECTION 2.20.3.23)
22 440 VA x 0.40 = 8 976 VA

TOTAL NET COMPUTED LOADS


26400 + 19780 + 1200 + 8 976 = 56356VA

CIRCUIT REQUIREMENT:
USE 24 - 15A 2-WIRE BRANCH CIRCUIT, 17 - 20A 2-WIRE BRANCH CIRCUIT, AND
17 - 30A 2-WIRE BRANCH CIRCUIT.

SERVICE ENTRANCE CONDUCTORS


TOTAL FULL LOAD CURRENT: (SEE SECS,. 4.30.2.4 AND 4.40.1.7)
[56 356 VA + 25% (2300 VA)]/230V = 247.53 A
USE TWO 150 mm² THW WITH AN AMPACITY OF 285 A

SERVICE EQUIPMENT:
(A) MAXIMUM CURRENT RATING OF PROTECTIVE DEVICE
(SEE SEC. 4.30.4.4 & TABLE 4.30.2)

1. NONTIME DELAY FUSE


[300% (2300 VA) + 28445 + 13110 + 9200 + 8 976]/230 = 274.59 A

2. INVERSE TIME CIRCUIT BREAKER


[250% (2300 VA) + 28445 + 13110 + 9200 + 8 976]/230 = 269.59 A

(B) SERVICE EQUIPMENT RATING


USE 1-300 A, 1PST, 250 V SAFETY SWITCH WITH 1-300A FUSE OR USE 1-400A TRIP,
2 POLE, 240V 10 KAIC MOLDED CASE CIRCUIT BREAKER (SEE SECTION 2.40.2.3)