NEPAL ACADEMY OF SCIENCE AND TECHNOLOGY
Khumalttar, Lalitpur
GPO Box 3323 Kathmandu
24 March 2015
in Collaboration With
mn @ Y om VS
a Z eSDAM Break Analysis
USING HEC-RAS:
A CASE SUTDY of Proposed
Koshi High Dam
Gyawali, D.R, and Devkota,L. P.
Nepal Development Research Institute (NDRI), Pulchowk, Lalitpur
* Email: dheeraz@gmailcom
Abstract
Nepal has been bestowed upon with tremendous water resources potential. However, only a small
fraction of it has so far been used in different sectors. For year round irrigation facilities to increase
agricultural productivity, to meet the peak hour electricity demand and dry season deficit, Nepal needs
to develop storage projects from long term development perspective. Proposed Koshi High Dam
project is one of them. The proposed dam project, though may provide a number of benefits ranging,
from water supply to flood control, recreation, hydropower and ittigation, catastrophic flooding,
can occur when a dam breaks as the magnitude of the discharge in such events far exceeds all other
floods. Advancing knowledge is, thus, beneficial to reduce the potential threats of the dam failure. The
Hydrologic Engineering Center's River Analysis System (HEC-RAS) was used with HEC-GeoRAS to
develop a dam failure model for the Koshi High Dam. HEC-RAS model was run under unsteady flow to
assess the magnitude of flood and stage and the timing of high flood arrival. These dam failure models
‘can be used as a preliminary assessment tool for the resulting catastrophic floods.
Keywords: Dam break, HEC-RAS model, Koshi high dam, unsteady flow simulation
Introduction
‘The total average annual runoff from the Nepalese rivers is about 225 billion cubic meters ie. 225
cubic km (NWP, 2005). Internally renewable water resource of Nepal has been estimated to be 198
cubic km, which is about 0.45% of the world’s available fresh water reserve of 44,000 cubic km. Per
capita water available of a country should be above 2,000 m” per year in order to be in comfortable
from availability point of view (Sharma, 2006). A country is said to be in water stress state if the per
capita water available in that country falls below 1,700 m°/year. If itis less than 1,000 m”/year, the
oa | Brameisiesr othe: Gomarirtr Weer wt feeteiratie Dovdowrentsituation is considered to be “highly stressed” (Revenga, 2000). The consequences of such water
scarcity can be much more severe, leading to problems with local food production and economic
development. Current per capita water availability of Nepal is 7,100 m3/year which is close to the
world average of 7200 m3/year. It is more than double to the average of Asia and 6/7 times higher
than the average of SAARC. Having 0.45% of total global fresh water in a country with a land area
of only 0.1%, having very high ratio of independency (94%) as well as having sufficient amount of
per capita water availability (> 7,000 m3 per year), Nepal can definitely be said as a rich country in
‘water resources. Even after 40 years per capita water availability would remain quite high (~ 4,000
m3) for Nepal. Analyzing these criteria as discussed, it can be concluded that Nepal would be in
comfortable position even in the future from the perspective of water resources availability.
‘Although Nepal has been bestowed upon with tremendous water resources potential, only a small
fraction of it, about 15 cubic km, has so far been used in these different sectors (NWP, 2005).
‘The total agricultural land in Nepal is about 2.640 million ha. The irrigable land with year round
irrigation facility is only about 15% (DOI, 2009) while the rest of area is not irrigated in the dry
season due to the water scarcity. Although Nepal has huge hydropower potential; more than 50%
of the total population of Nepal has yet to receive electricity at their homes. The total installed
capacity of the hydropower plants of the country has reached to 718 MW, out of which storage
hydropower projects has a mere capacity of 92 MW (DOED, 2015). The rest of the projects are
rrun off the river types which generates around one third of its installed capacity during the dry
‘months of the year. To attain the food security, agricultural production and productivity must
be increased. It is only possible through year round irrigation facilities. To meet the peak hour
electricity demand and dry season deficit, Nepal needs to develop storage projects. Task force
of 2009 has recommended various such storage projects for country's long term development
perspective (TTF, 2009). Proposed Koshi High Dam project is one of them.
Koshi High Dam, which was envisioned in 1937 to effectively “cure” the flooding problem, has once
again come forward as revitalized issue for flood control, irrigation and hydropower generation.
Koshi High Dam, a concrete dam of 269 m height, is proposed to be constructed in Barahkshetra
(near Chatara) with live storage of 4,420 million cubic meters (mem) and gross storage of 8,500
‘mem. The expected benefit from the dam is irrigation of 66,450 ha of land in Nepal and millions
of ha in India, flood control and 3,489 MW of hydropower (NDRI, 2015). As such, Nepal (the
‘upper riparian), India (middle riparian), and even Bangladesh (lower riparian of the Ganga River
Basin) have shown interest in the construction of the high dam. Recently, the sixth meeting of the
India Nepal Joint Ministerial Commission on Water Resources (JCWR), held in November 2011
at New Delhi agreed to expedite the completion of Detailed Project Report of Koshi High Dam
Multipurpose Project. Similarly, the meeting of the JCWR held in January 2013 at Kathmandu
decided to continue the feasibility study of the Dam (MoEn, 2014).
‘Though, these storage dams provide a number of benefits that ranges from water supply, flood
control, recreation, hydropower and irrigation, catastrophic flooding occurs when a dam breaks as.
the magnitude of the resultant flood in such event far exceeds all other floods, These dam failures
may arise from different reasons: seepage, piping (internal erosion), overtopping due to insufficient
spillway capacity or insufficient free board and settlement due to slopes slides on the upstream
shells and liquefaction due to earthquakes (SoC, 2010, Xiong, 2011). Early warning is thus, very
important and necessary to save the lives and property during the dam break event (Alghazali
and Alhadrawi, 2012). Total number of dam failures even in USA from 1975 to 2011 is 656, out of,
which overtopping was the most common cause of dam failure followed by piping (FEMA, 2013).
Simulation of dam break events and the resulting floods are, thus crucial to characterizing and
reducing threats due to potential dam failures (Xiong, 2011). HEC-RAS model has the capability
of simulating the dam break event and has been used in many past researches (Xiong, 2011, Bjerke,
2011, Alghazali and Alhadrawi, 2012, FEMA, 2013).
2 | Proceedings ofthe Seminar on Water and Sustainable DevelopmentThe beneficial aspects of the Koshi High Dam are promising; advancing knowledge is beneficial to
reduce the potential threats of the dam failure. With this backdrop, dam break simulation study was
‘carried out to assess the magnitude of flood ant stage and the timing of arriving high flood at different
location below the proposed dam site under different breach modes using HEC-RAS model.
Study Area
‘The Koshi River Basin covers three ecological zones of Nepal within the transverse length of about
150 km (Figure 1). The variation of altitude in this short reach is quite sharp ice. from 95 m to 8848
m, The Koshi River Basin covers the area of 2,000 km2 in the Terai region of Nepal before entering,
into India and these regions are densely populated. The Koshi River has three main tributaries viz.
‘Tamor in the eastern part, Arun in the middle and Sunkoshi in the western part of the basin. The
Sunkoshi River consists of 5 major tributaries: the Indrawati, the Bhote-Koshi, the Tama Koshi, the
Likhu and the Dudh Koshi (Figure 1). Sub-basins Sun-Koshi, Arun and Tamor meet at Tribeni-ghat,
flow through Barahkshetra gorge, location of proposed Koshi dam, for a length of about 15 km and
enters into the Terai Region of Nepal at Chatara. Immediately after emerging ftom the gorge at
Chatara, Koshi River flows in a much wider channel through the Terain plains towards India. The
abrupt change in gradient of Koshi has periodically proved catastrophic in nature with flooding,
aggradations of the river bed due to sedimentation and river bank erosion, as frequent occurrences.
‘The study area lies within a tropical climatic regime with the annual rainfall of about 2000 mm.
(NDRI, 2015). However, variability in the annual precipitation is quite high for a given location.
‘The Koshi River has an annual average flow of 1,540 m3/s measured at Chatara (DHM, 2008).
However annual variability even in the average flow is significant: 2,070 m3/s in 1999 and 1,230
‘m3/s in 1982. The annual hydrograph of 2000, clearly illustrates the flow dominancy in the four
monsoon months (Figure 2). Also the maximum and minimum flow occurs in the month of
‘August and March respectively. The daily maximum and minimum flows at this station in 2000
are respectively 294 m3/s and 7,540 m3/s, showing great variation in the flow within a year. It thus
suggests the importance of the water impounding structure for the better management of the
‘water resources of the river and to mitigate the water induced disasters.
aS
a
(rca rer baae ancy
sou
Figure 1. Koshi River Basin in Nepal
3 | Proceatings of the Seminar on Water and Sustainable DevloomentDischarge (m/s)
|
|
Ss
0 30 60 90 120 150 180 210 240 270 300 330 360
| Jan Feb Mar Apr May Jun Jul Aug Sep Get Nov Dec
Day/Month of the Year
Source: DHM, 2008
Figure 2. Hydrograph of Chatara (2000)
Methodology
‘The dam break simulation study conducted in this study consists of following steps:
DEM Preparation
Due to inadequacy of national level contour and spot height dataset at the required scale,
‘topographical surveyed data (DWIDP, 2012) was obtained to derive a more realistic river cross
section using the ArcGIS 9.3 environment. National level contour and spot height data was used
along with ASTER GDEM V2" to prepare the DEM along the floodplains of the Koshi River.
River Schematics
Due to the braided nature of the Koshi River in the Terai plains, the river schematics including
river centerline, banks, flood plains as well as embankments were extracted from the recent Google
Earth Imageries.
Dam Break Analysis
‘Dam break analysis was carried out using the HEC-RAS model to simulate the hydraulic process
in case of breaching of the Koshi High Dam. The simulation domain is shown in Figure 3. A.
model dam was constructed in the Koshi River at Chatara where the proposed Koshi High Dam
is supposed to be constructed. The model dam has the characteristics resembling the available
specifications of the Koshi High Dam along the proposed axis. While doing this analysis, the dam.
was placed as an inline structure in the HEC- RAS environment and piping was assumed as a
trigger mechanism for the breach,
1 ASTER GDEM v20 is the property of METI and NASA.
4 | Proceedings of the Seminar on Water and Sustainable Developmentoo
Figure 3, Simulation Domain
Dam Parameters
Specifications of Dam
Figure 4 and Table 1 shows the specifications of dam used in the model. A storage area of about
855 billion cubic meters (equivalent to the proposed Koshi High Dam Gross storage) was assumed
for analysis.
Figure 4. Dam Specification used in the model
|
5 | Proceedings ofthe Seminar on Wr and Sustainable DevelopmentTable 1, Dam Specification used in the model
Dam Height 269m. ‘Type Sluice
Deck width = 15m = Numbers: 10 Size: 20mx15m
Weir Crest Broad Sluice discharge 0.6
Dam —_ Shape crested |G2te coefficient
Specification u/s side slope 0 Specification Invert 350m
disside slope 2:1 ‘Weir shape Broad crested weir
Breach Specification
Piping was considered as the triggering mechanism for the dam breach. Full formation hours
for the breach were considered as 5 hours and a half sine wave breach progression was used
for the simulation process. Error! Reference source not found. and Figure 5 show the breach
specification and the breach progression plot respectively.
Table 2. Specification of the Breach
Center Station 400m. Full Formation Time (hrs) * 5
Final bottom width 200m. Failure Mode Piping
Final bottom elevation 120m Piping Coefficient 05
Left side slope 0s Initial Piping elevation 250
Right side slope 05 ‘Trigger failure at 25th August, 2006
Breach weir coefficient 2.5
Figure 5. Breach Progression Plot
Elevation controlled gates were used as the boundary condition for the inline structure (dam).
Flow hydrograph for August was used as the upstream boundary condition whereas normal depth
was used as the downstream boundary condition. The model was set to breach under the extreme
flood of 69758 m3/s (100yr return period ECHAMOS flood, Devkota and Gyawali, 2015) which is
much higher than the 1000 year return period flood under historic data (i.e. 47444 m¥/s).
Results and Discussion
Unsteady flow analysis was carried out to evaluate the dam breach scenario in the HEC-RAS
model. Figure 6 and Figure 7 display the plan of the Koshi River, before and 4 days after the breach.
‘As can be observed from the figures, the inundation area has increased but itis contained withi
the embankments,
G | Proceecings ofthe Seminar on Weter and Sustainable DevelopmentFigure 7. Plan after breach (29th August, 24:00)
Similarly the breach formation at the dam can be seen in Figure 8 (a-e).
a. Prior to the breach
b. During Breach (breac initiation)
7. | Proceecings of the Serinron Water and Sustainable Deveopment¢. After Breach
Figure 8. Cross-section of dam prior to, during and after the breach
Figure 9 (a-d) shows the profile before, during and after the breach of embankments.
SORES
I
‘Profile prior to breach. b. Profile during the breach (Initial)
Eel] Ez
c. Profile during the breach (Intermediate) d. Profile after the breach
Figure 9 (a-d). Profile of dam prior to, during and after the breach
8 | Proceedings ofthe Seminar on Water nd Sustainable DevelopmentIt can be observed from the figures that the volume of water stored behind the dam is flooded
within 5 days of breach. Figure 10 (a to c) shows the stage and flow volumes at different locations
within the Koshi River. As can be read frori Figure 10, the maximum flood wave is transferred to
the most downstream cross-section (about 62 kms downstream) after 20 hours of breach.
c. Most downstream cross-section
Figure 10. Stage and Flow at different locations
Conclusions
‘The beneficial aspects of the Koshi High Dam are promising; advancing knowledge is beneficial to
reduce the potential threats of the dam failure. The simulation of potential inundation resulting
from a dam failure can provide very relevant and crucial information about the downstream
9 | Proceedings of the Seminar on Weiter and Sustainable Develoomentimpacts. This exercise requires hydrologic scenarios, the possible dam failure modes, breach
parameters associated with failure modes, and the routing and mapping of the consequent
discharge hydrograph. ‘The unsteady fldw routing model, in HEC-RAS, is used for the simulation
of failure of the Koshi High Dam to compute and display downstream impacts resulting from.
the dam failure. This study assessed the magnitude of flood, stage and the timing of arriving high
flood downstream. A storage area of about 8.5 billion cubic meters (equivalent to the proposed
Koshi High Dam Gross storage) was assumed for analysis. Piping was considered as the triggering.
mechanism for the dam breach. Dam break duration was kept 5 hrs. The volume of water stored
‘behind the dam was flooded within 5 days of breach. The maximum flood wave is transferred to
‘the most downstream cross-section (about 62 kms downstream) after 20 hours of breach.
‘The analysis of dam failure models can provide a scenario generating tool for identifying the
resulting catastrophic hazards. This can better equip the floodplain and emergency management
authority to take informed decision-making regarding contingencies to protect against the loss
of life and property damage.
Acknowledgements :
“Authors would like to thank Climate Change Knowledge Network (CDKN) and Global Change SysTem
‘Analysis Research and Training (START) for the financial support to carry out this research,
References
Alghazali, N. 0. S. andd Alhadrawi, D. A. H., 2012, The Mathematical Model of RCC Dam Break,
Bastora Dam as a Case Study, Journal of Kerbala University, Vol. 10, No. 3
Bjerke, P. L., 2011, Dam Break Analysis for Aparan Reservoir, Armenia, Norwegian Water
Resources and Energy Directorate, Norway.
Devkota, L.P. and Gyawali, D.RG., 2015: Impacts of Climate Change on Hydrological Regime
and Water resources Management of the Koshi River Basin, Nepal, Journal of hydrolo,
Regional Studies, (Accepted paper)
DHM, 2008: Published and unpublished documents, Department of Hydrology and Meteorology,
Kathmandu, Nepal.
DoED, 2015, www.doed.gov.np, Accessed March, 2015.
DOI, 2009: http://www.doi.gov.np/, Department of Irrigation, Lalitpur, Nepal (Visited: October
10, 2009).
DWIDP, 2012. Cross sectional surveyed data of the Koshi River Basin.
FEMA, 2013. Federal Guidelines of Inundation Mapping of Flood Risks Associated with Dam
Incidents and Failures, Federal Emergency Management Agency, USA.
MoEn, 2014, www.moen.gov.np, Accessed March, 2015
NDRI, 2015. Disaster Risk Reduction and Climate Change Adaptation in the Koshi River Basin,
Nepal. Final Report, Nepal Development Research Institute, Pulchwok, Lalitpur, Nepal
NWP, 2005. National Water Plan, Water and Energy Commission, Kathmandu, Nepal.
Revenga, C., 2000, Will there be enough water? Pilot Analysis of Global Ecosystems: Freshwater
Systems (Edited: Greg Mock).
Sharma, K. R,, 2006, Newsletter, Department of Irrigation, Lalitpur, Nepal.
SoC, 2011. Guidelines for Dam Breach Analysis, State of Colorado (SoC), Department of Natural
Resources, USA.
TF, 2009. Ten Years Hydropower Development Plan, Task Force, Ministry of Energy, Singha
Durbar, Kathamndu, Nepal.
Xiong, Y. F,, 2011, A Dam Break Analysis Using HEC-RAS, J. of Water Resources and Protection,
3, 370-379,
40. | Proceedings of the Seminar on Water and Sustainable Development