Crack The Code - Plan: Main Tasks
Crack The Code - Plan: Main Tasks
Start Date
Finish Date
Lessons per week
Lesson time
Time allowed
Legend
Homework
Target Audience
Class work
Update Plan / Add comments / Make
changes if required
CheckPoint - Check progress and make
changes / record progress
Known contingencies
Main Tasks
Plan
File Structure
Initial design
Collecting Assets
Level 1 - Movie
Level 2 - Video
Level 3 - Puzzles
The Map
E-portfolio
Review
10th January
5
1hour
H
TA
C
UP
CP
Date
12-Jan
Start date
Subtasks
Write script for video including how / where questions will be asked 21-Jan
Rehearse script with audience to check timing and get feedback 21-Jan
Record feedback and update script if needed 21-Jan
Save script into e-portfolio folder 21-Jan
Film the video 22-Jan
Edit the video 25-Jan
Get feedback on video 27-Jan
Record feedback and update / change video if required 27-Jan
Save video into game folder 29-Jan
Create rough puzzle ideas, scan and save into e-portfolio folder 28-Jan
Create a flowchart for the series of puzzles to show pathways 29-Jan
Create a storyboard for each puzzle screen 29-Jan
Create the puzzles 1-Feb
Test the puzzle sequence/s for errors or mistakes 4-Feb
Get feedback and record feedback 4-Feb
Act on feedback if necessary 4-Feb
Save 'final challenge' into game folder 5-Feb
Create rough map design, scan and save into e-portfolio folder 6-Feb
Create map storyboard 7-Feb
Get feedback on map design and storyboard 8-Feb
Record feedback and make changes based on feedback 8-Feb
Create the map 9-Feb
Test the map with a reviewer to check all links work and navigation is easy 13-Feb
Update / modify the map and record changes made 13-Feb
Save map into game folder 14-Feb
Create rough splash screen design, scan and save into e-portfolio folder 15-Feb
Create a detailed design and get feedback 16-Feb
Record feedback and update detailed design 17-Feb
Create splash screen 18-Feb
Test splash screen with a reviewer and get feedback on it 19-Feb
Update splash screen 19-Feb
Save splash screen into game folder 19-Feb
Actual time
Finish date
(minutes)
(minutes)
minutes
Time in
taken
work
Time
11-Jan 60 30 C/H 60
11-Jan 10 10 C 15
12-Jan 30 30 C/H
11-Jan 5 5C
12-Jan 5 5H
12-Jan 5 5H
13-Jan 60 30 H
13-Jan 20 20 C/H
13-Jan 20 10 H
13-Jan 5 10 H
13-Jan 20 15 H
Ongoing C/H
15-Jan 5 10 C
Ongoing C/H
Ongoing C/H
14-Jan 20 10 H
15-Jan 30 20 C
19-Jan 120 60 C
19-Jan 15 5 C/H
19-Jan 15 5 C/H
20-Jan 30 10 H
20-Jan 20 30 H
20-Jan C
21-Jan 10 20 C/H
21-Jan 10 10 H
21-Jan 10 10 H
21-Jan C
25-Jan 120 30 C
26-Jan 60 20 C/H
27-Jan 20 10 H
27-Jan 20 10 H
29-Jan C
28-Jan 60 30 H
29-Jan 30 30 H
30-Jan 60 20 H
3-Feb 120 60 C/H
4-Feb 20 10 C/H
4-Feb 30 30 C/H
4-Feb 20 10 C/H
5-Feb C/H
6-Feb 40 20 H
7-Feb 40 20 C/H
8-Feb 20 10 H
8-Feb 30 15 H
12-Feb 120 60 C
13-Feb 30 15 H
13-Feb 20 10 C/H
14-Feb C
15-Feb 20 10 H
17-Feb 60 30 C/H
17-Feb 20 20 C/H
19-Feb 80 40 C/H
19-Feb 20 20 H
19-Feb 20 10 C/H
19-Feb C
20-Feb 30 10 H
20-Feb 20 10 H
20-Feb 20 20 H
22-Feb 60 20 C/H
22-Feb 20 10 H
23-Feb 30 10 C
23-Feb C
23-Feb 2 2C
23-Feb 2 2C
23-Feb 2 2C
23-Feb 5 5C
24-Feb 2 2
25-Feb 15 15 C/H
26-Feb 30 15 C/H
26-Feb 15 20 C/H
26-Feb C
27-Feb 40 20 C/H
27-Feb 15 5 C/H
28-Feb 5 5C
1-Mar 20 10 C
1-Mar 5 5C
2-Mar 40 20 H
2-Mar 20 10 H
9-Mar 360 120 C
9-Mar 2 2C
11-Mar 40 20 C/H
11-Mar 30 15 C/H