STR No. CL WIC-D&D/STR/( Rev'O'
Page 2 of 10
Details of Revisions
/ CONTENTS
cç _______
- SSE/D&D
STR No. CLW/C-D&D/STR/O01 Rev'O'
- - SEE11 D -- t---7-- Dy. CEE/D&D
Issued in November-'2015
Page 5 of 10
6.2 Keeping in view to achieve objective of quality-oriented' material, a quality team of engineers shall be
4nploYed for preparation of the specification of raw material. ...
6.3 1 Proper test procedures shall be evolved and carried out on all the raw materials purchased by the
Contractor. Such test results, documentary proof of purchase and test certificate of each component
shall be maintained and produced to the consurner/CLW/inspectiflg official as and when called for.
L_J
Prepared by Checked by - Issued by --
c: --....-.
./&D
SfELI?.&0 ... .....1
Issued in November'2015
STR No. CLW/C-D&D/STR/OO1 Rev'O'
6.4
Page 6 of 10
A record of each sub-supplier clearly showing the quantity purchased and rejected as well as cases of
N
late delivery, if any shall be kept.
The following basic machinery and plant for manufacturing of Traction Transformers for 3-Phase
Locomotives shall be available with the Contractor. The rating of these machines should be adequate
enough to perform the desired function satisfactorily and also sufficient numbers of these machines
should be available to ensure smooth operation:
NOTE:
(i) If contractor is outsourcing the laminations in required shape & size, then the associated M&Ps
are not required at Contractors premises. It is, however to be ensured that firm from which these
materials are procured have the desired M&P items.
(ii) Contractor shall have dust proof & controlled environment for winding and assembly shop. -
Checked by Issued by
SS E/D&D T ?D&D
STR No. CLW/C-D&D/STd 1 Rev'O' Issued in November'2015
Page 8 of 10
SSE/D&D
STR No. CL W/C-D&D/STR/O01 Rev'O'
H EE/D D Dy. CEE/D&D
Issued in November'2015
Page 9 of 10
ANNEXURE-Il
Testing Facilities
Calibration of the Testing / Measuring Equipments should be done at least once in a year unless
stated otherwise. Inspection Staff conducting non-destructive testing shall be adequately trained
and qualified by recognized agency and shall have adequate experience. The rating of the
following machines should be adequate enough to perform the desired function satisfactorily and
also sufficient numbers of these machines should be available to ensure smooth operation.
Following testing facilities should be available with the Contractor:
1. Testing transformer complete with all associated equipment for conducting power frequency
tests & induced voltage test at double of the power frequency.
2. Impulse test with associated equipments (optional).
3. Ratio meter.
4. Digital Micro Ohmmeter equipment.
5. Megger- 1000V, 2500V & 5000V.
6. Ammeters, Wattmeters and volt meters of various ranges.
7. Noise level meter.
8. Thermometer.
9. Dissolved gas analyzer.
10. Equipment for BDV test for oil.
11. Equipment for short circuit test (optional).
12. Weighment (optional).
13. Hydraulic pressure test for oil leakage.
14. Facilities for temperature rise test
15. Digital Power Analyser.
16. Winding Resistance meter.
17. Clamp meter.
- ANNEXURE- III
Calibration of the Testing / Measuring Equipments should be done at least once in a year unless
stated otherwise.
.1. Vernier calipers of appropriate ranges required during inprocess/assembl and dimensional
Checks.
2. Micrometers. of appropriate ranges required during in-process/ assembly
and dimensional Checks.
.3.- Various gauges for measuring OD/lD of the coil of different legs.
4. Steel measuring tape & scale.