Transition Roadmap Overview 23Q3
Transition Roadmap Overview 23Q3
Start
Project Go
Stop
Project Mgmt. Initiation Execution / Monitoring / Controlling Live Closing
Fit-to-Standard
Activate Solution Configuration
Analysis / Design
Application
Application Value and Scoping
Production Cutover
Dress Rehearsal
Transition Preparation
Product Enhancements
Hyper Care
Transition Planning
Strategic Planning
Prototype
Extensibility
Operate Solution
Custom Code Impact CC. Quality
Technical
Architecture and Sizing Sizing & Scalability Verification
Infrastructure
Tech. Architecture and
Technical Design IT Infrastructure Setup
Infrastructure Definition
Start
Project Go
Stop
Project Mgmt. Initiation SAP Value Assurance
Execution Foundation
/ Monitoring / Controlling Live Closing
Data Management
Transformation
Architecture Point of View
Organization
Data Migration Design Data Migration Execution
Cutover Preparation
Build Execution
Production Cutover
Digital Transformation
Dress Rehearsal
Transition Preparation
Execution
Product EnhancementsBuild
Hyper Care
Transition Planning
Prototype
Extensibility
Operate Solution
Planning the
to Support
Strategic
Build
Architecture
Analytics
Handover
Analytics Design
Analytics Support
Design Analytics Configuration
Analytics Execution
Testing Test Planning
Build Design Support Build
Test Execution
Preparation & Execution
Technical
Architecture and Sizing Sizing & Scalability Verification
Infrastructure
Platform
Tech. Architecture andDesign Support
Technical Design IT Infrastructure Setup
Infrastructure Definition
In the Discover phase, customers become familiar with the benefits of SAP HANA and SAP S/4HANA
and the benefits it can bring to customers’ business.
As depicted in the figure, the phase is structured as follows:
1 2 ❑
1 In the first step customers should perform a Strategic Planning and create an overall company
strategy on their digital transformation. This includes SAP S/4HANA as the digital core, but looks at
it from a broader perspective. Key topics like Internet of Things, Big Data / Smart Data,
Omnichannel, or Business Networks can be included into the strategy as well.
❑
2 In the second step, a decision on the implementation scenario, and a comprehensive application
implementation strategy for SAP S/4HANA should be created in the activity Application Value and
Scoping. In the case of system conversion, the conversion readiness of the existing SAP ERP
system should be checked as well.
❑
3 In the next step customers should become familiar with the value of SAP S/4HANA in general (e.g.
3 the new and simplified functionality in SAP S/4HANA, the new User Interface based on FIORI, agile
customer innovations using SAP Cloud Platform etc.). A Trial System in the cloud supports this.
The outcome of these steps can be leveraged within a company to build a business case for an SAP
S/4HANA implementation project.
Discover
Activities & Tasks Tools & Guides Service Components*
1. Strategic Planning • SAP S/4HANA Movement Website • Innovation Strategy and Roadmap
Identify the strategic business and IT objectives, • SAP Transformation Navigator • Analytics Strategy
1 2 create an overall multi-year company strategy on • SAP Innovation and Optimization Pathfinder • UX Strategy
digital transformation, and define the innovation • Innovation Guide • Integration Strategy
strategy • Road Map Explorer
• Spotlight by SAP • Architecture Point of View
• Target Architecture Assessment
2
Once the business case has been approved, the project is initiated in the Prepare phase.
6 ❑1 There are customers running a Prototype project in front of the real transition project. The aim is
3 often to check technical and functional feasibility. Prototypes are small projects by its own, and
1 4 5 usually last between three and six months.
❑2 The formal Project Initiation starts afterwards and needs to be aligned with the customer project
manager. In general, each company or implementation partner has a methodology to plan and
execute projects.
❑3 Project Team Enablement can be started early in the Prepare phase.
❑4 The project itself is planned in the dedicated Transition Planning activity. Depending on the
implementation scenario SAP offers dedicated planning components. Results from the Discover
Phase – in particular the functional implementation road map – is considered as well.
❑
5 The planning workshops often reveal Transition Preparation activities (e.g. the “Customer Vendor
Integration” in the case of a system conversion), which have to be done before the Explore phase
starts. Those larger transition preparation activities can be handled as separate (sub-) projects.
❑
6 A first workshop on Organizational Change Management starts.
2. Project Initiation • SAP Solution Manager, SAP Cloud ALM • SAP Operations Platform Starter Pack
1 4 5 Formal project start or 3rd party software for project • Agile Methodology and Tool Coach
SAP TQM drives setup of project governance structure management
and definition of quality gates
Customer or partner project manager to lead project
4. Transition Planning • SAP Readiness Check • Migration and Upgrade Planning Workshop
Starting from the functional implementation roadmap, • Simplification Items Catalog • Transition Planning for New Implementation
define the scope and execution plan for the upcoming • Best Practice Explorer • Selective Data Transition Planning Workshop
SAP S/4HANA transition project. The result is a first • Maintenance Planner • Data Migration Architecture
version of a project plan. • Technical Downtime Optimization App • Technical Architecture & Infrastructure
• SAP Signavio
• Custom Code Health Check
Once the Prepare phase has been finalized considering a detailed planning for the
functional and technical work streams, the Explore phase will be kicked off.
❑1 In the Learning Design activity of the Solution Adoption work stream, the training
1 strategy for the end users is developed according to the functional design.
3
2 ❑2 In a new implementation, leverage SAP Best Practices in the activate solution activity.
4
❑ The to-be application is designed in fit-to-standard & design workshops. The
3 3 methodology has been aligned between cloud and on-premise. Gap validation and a
5 final design review support this activity.
❑ For all implementation scenarios, security settings and infrastructure need to be
6
4 adjusted. This is planned in Security Design. UX Design plans the adjustment of Fiori
Uis.
❑ In the Data Management work stream, data load from source systems needs to be
5 prepared and planned in the Data Migration Design activity (new implementation and
selective data transition only). Data Volume Management is either initially planned or
updated according to new options and requirements coming with SAP S/4HANA.
❑ In the Extensibility work stream, you will need to identify and prioritize the Custom
6 Code Impact on custom objects that are used productively, and that must be adjusted
as part of the system conversion project.
© 2021 SAP SE or an SAP affiliate company. All rights reserved. ǀ PUBLIC 9
Transition Roadmap – Explore Phase (2)
❑
7 Integration design work starts in proper alignment with the to-be application design, to
properly integrate the SAP S/4HANA system in the solution landscape. First basic
integration setup activities are performed for the sandbox (if required) and for the
development system.
❑
8 Within the Analytics Design activity customers can further enhance their analytics
infrastructure with regards to embedded analytics that have been introduced with SAP
S/4HANA.
❑
9 The technical design document is created in the Technical Architecture and Infrastructure
work stream. A Sandbox is created for technical and functional experience gathering and
as the basis for fit-to-standard workshops (it depends on the scenario how the sandbox
7 is created). At the end of the Explore phase the DEV environment needs to be set up
8
(again scenario specific).
❑
10 Operations & support run an Operations Impact Evaluation, to identify IT Support
9 operational areas that require adjustment to safely and efficiently operate SAP S/4HANA
as of Go-Live. The actions taken here depend on the SAP operational experience of the
9
customer.
10
Explore
1 1 Design
1. Learning • SAP Enable Now • SAP Education Consulting
Develop the training strategy for end users
2 3 2. Activate Solution • SAP Best Practices Explorer • Activate Solution
4 2
In a new implementation, the activation of the • Cloud Appliance Library • Mandatory Preparation for System Conversion
Best Practices content will be provided. For • Administration Guide for Implementation • Financial Data Quality
5 system conversion, a sandbox is provisioned. • Data Management Design
6
3. Fit-to-Standard Analysis / Design • SAP Best Practices Explorer • Fit to Standard Analysis & Design
Multiple activities behind; Defines the application • Focused Build (SAP Solution Manager)
for implementation and identifies potential delta • SAP Cloud ALM
requirements.
3 • SAP Signavio
4. UX Activation and Design • Fiori Apps Reference Library • UX Activation and UX Design
Identify customer specific requirements which • User Experience Design Guidelines • UX Advisory Service for Business Value
4 Fiori standard configuration
deviate from • UI Technology Guide
• SAP Build
6. Gap Validation/Design Review • Focused Build (SAP Solution Manager) • Gap Validation
Perform a quality review of identified gaps and • SAP Cloud ALM • Design Evaluation
delta design documents
Explore
1
7. Data Volume Design • DVM Workcenter of SAP Solution Manager • Data Volume Design
Agree on a data volume management strategy
that defines which data is stored in which storage
location and for how long
2
8. Data Migration Design • SAP Best Practices content for data migration • Data Migration Assessment
The transfer of business data from legacy • SAP S/4HANA Migration Cockpit
systems to the newly implemented SAP
S/4HANA system is designed
7
8 9. Custom Code Impact • SQL Monitor • ICCM Awareness
In a conversion scenario, customers need to • ABAP Test Cockpit • ICCM Analysis
identify code, that must be adjusted (“must- • Custom Code Migration Guide • ICCM Transformation
3
do’s”), and those that should be adjusted • Intelligent Custom Code Clustering
9
(“should-do’s”).
10
10. Integration Design • Integration Solution Advisory Methodology • Fit-to-Standard Analysis / Design
11 Detail and4document all integration aspects of the (ISA-M) • Integration Design Workshop
project, that have been identified in the Prepare • SAP Cloud Platform Integration Suite • Integration Validation
phase and in fit-to-standard. • Integration Directory in SAP Solution Manager
11. Analytics Design • SAP Best Practices for Analytics with SAP • Analytics Design Workshop
customers can further enhance their analytics S/4HANA
infrastructure with regards to new reporting
options that have been introduced with SAP
S/4HANA.
*not exhaustive, only excerpt of most
frequently booked service components
Explore
1
12. Test Planning • SAP Solution Manager Test Suite • Test Planning
consider and plan the testing cycles required to • SAP Cloud ALM
mitigate production support issues; evaluate the • SAP S/4HANA On Premise Value Map
existing test and quality management processes, Learning Journey – Realize
2 cases and scripts
create test • SAP Test Management Best Practice
In the Realize phase, you start the execution and implementation of all items that were
defined and designed in earlier phases.
1❑ In the Solution Adoption work stream, the training for the end users is prepared.
1 2❑ In the Application design and configuration work stream, the functional changes (general
configuration, master data, and core / delta), Fiori changes and security changes are
2 implemented as defined in design. Additional applications, like Central Finance in a
selective data transition scenario, or the SAP Digital Boardroom, are set up as planned.
3 3
❑ In the Data Management work stream, data aging and data archiving are configured for
business objects according to the DVM strategy. Load and verification runs ensure that
4
business data can be migrated with acceptable time and quality.
5 ❑
4 In the Extensibility work stream, Product Enhancements like reports, are developed.
Existing custom code is adjusted to be ready for SAP S/4HANA. SAP can safeguard the
activities via the “Integration Validation” offering, which covers key aspects like Business
Data Consistency, Exception Management, Integration, and Performance and
Scalability.
5❑ In the Integration work stream, all required interfaces are implemented as designed in
the Explore phase. Further integration setup is done for the quality assurance system,
and for the production system (new implementation only).
❑
6 The technical infrastructure is set up in the Technical Architecture and
Infrastructure work stream, according to the technical design document. The
transition of the quality assurance system takes place according to the detailed
transition plan, and technical adjustments may be implemented as part of the
activity. In parallel, the sizing of the productive instance is verified.
❑
7 According to the Operations Impact Evaluation, the operations implementation
(people, processes tools) takes place in the Operations & support work stream.
❑
8 At the end of the Realize phase, the preparation for cutover starts. A cutover plan is
created from experience gained in former transition runs (potentially additional mock
runs are required).
8
Realize
5 3
2. UX Implementation • Fiori Apps Library • Implementation of User Experience in SAP
Implement Fiori changes / new UIs • SAP Build S/4HANA
6
3. Security Implementation • Security Guide • SAP Security Optimization Services
Customer-specific results from the security
design are implemented.
4
4. Integration Validation • SAP Integration Validation Info Sheet • Technical Feasibility Check
Plan, document and start integration validation • Documented Procedure for Integration • Technical Integration Check
activities, like checking data consistency, Validation • Integration Validation
monitoring performance, business processes and • SAP Thought Leadership Paper – Integration • Business Process Performance Optimization
exception management. Validation of Networked Solutions • Technical Performance Optimization
• Interface Management
5. DVM Configuration and Execution • SAP Online Help for Data Archiving and Data • Data Volume Management
Clean up or archive business data, configure data Aging
archiving and data aging.
Explore
Realize
13
14
16
15
Once the quality gate Realize-to-Deploy has been passed successfully, the final preparation for
Go-Live starts in the Deploy phase.
❑1 The Learning Realization goes into its final phase, the end user trainings should run
1 during the Deploy phase.
3 4 5 6 ❑2 Operations Readiness ensures the IT operations team is ready to operate the new SAP
S/4HANA environment safely and securely. Of course, the IT operations team will
continue to gain real-life operational experience in the hyper care phase after Go-Live.
❑3 After the test execution is finalized successfully, the Dress Rehearsal takes place (for all
scenarios) and the implementation of the productive SAP S/4HANA will be finalized (for
new implementation and selective data transition).
❑4 Quality gate “Q4 Deploy-to-Run” will ensure that everything is ready for Go-Live. The final
“Go” decision is the start for the implementation of the productive SAP S/4HANA system
with the Production Cutover at the Go-Live weekend.
❑5 The weeks after Go-Live are called “Hyper Care”, where the new system is further
stabilized and optimized. When finished, the Deploy phase ends.
2 ❑6 The transition project comes to an end when finally, operational responsibility has been
handed over to the production support organization.
Deploy
5. Hyper care • Obsolete Data Handling tool • SAP Going Live Support
Verify how the new workload behaves as • SAP Signavio • Technical Performance Optimization
opposed to the old system and improve system • SAP Process Insights • Business Process Improvement
performance • SAP Going Live Check
• SAP OS/DB Migration Check