0% found this document useful (0 votes)
32 views9 pages

IKCP0-YYB-G-05-049 - ITP For Instrument Cable Rev. 1 (Status A)

Uploaded by

Arman Pracoyo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
0% found this document useful (0 votes)
32 views9 pages

IKCP0-YYB-G-05-049 - ITP For Instrument Cable Rev. 1 (Status A)

Uploaded by

Arman Pracoyo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
You are on page 1/ 9
PT PLN (Persero) ptj PUSAT MANAJEMEN PROYEK CCROUT _| DATE REVIEW FOR APPROVAL OF DRAWINGS / DOCUMENTS 24-2019 DRAWINGS / DOCUMENT NUMBER DRAWINGS / DOCUMENTS TITLE PLN REV. CONTRACTOR REV. STATUS A FIELD INSPECTION AND TEST PLAN FOR INSTRUMENT TKCPO-YYB-G-05-049 CABLE KALSELTENG 2 CFSPP (2X100 MW) COMMENT — a ‘COMMENT PLN COMMENTS CONTRACTOR RESPONSE No. | No. 1 ‘Approved [ Review by. ] Response by: | Date: Sign | Approved by: 2a uM CONTRACTOR DOCUMENT REVIEW co = [mecn to [LJ BATE 5 [eect iw IE) commno & fiec — AE) aeenoveo SupORT 8D] APPROVED AS NOTE CONTRACTOR T | Nor APPROVED RECORD t + TE INFORMATION | womnino socuen _ ERROR OR DEVIATIONS © af _ _ Ea E | Eq DATE, 6 tos [BATE - cur Jeountno 7 [paca (sued For opie CANE CONSORTION BUSMINPRO nev | _oare DESCRIPTION PREPARED s CHECKED | APPROVED ‘OWNER PT. PLN ( PERSERO } Jl. Trunojoyo Blok M 1/135 Kebayoran Baru Jakarta 12610 Phone : +82-21-7261875 7261122 7262234 Fax : +62-21-7221830 e-mail : [email protected] Contract Agreement No, 1504,PJ/DAN.02,0U/DIRI2016 PROJECT KALSELTENG 2 CFSPP(2x100MW) PT. PLN ( PERSERO ) PUSAT MANAJEMEN PROYEK FON pocno. L1]9/ 4] 1] 8[ 8] - | 0] of -[G]-]o] 5|- [y[¥]el- (o][4/9]- [o[s]- |o|1| ‘CONTRACTOR CONSORTIUM OF PT TRUBA JAYA ENGINEERING- HYUNDAI ENGINEERING CO. LTD.- ITOCHU CORPORATION Truba penn. fal] Ahyungal sTOEWS ‘SUB CONTAEROOR RE. DOC.NO PREPARED & DATE TITLE cHeckeo sy | a7-pee anac CABLE CONSORTIUM JZ APPROVED DATE CONTRACTOR DOCUMENT NUMBER. REV, PLN 2016 FIELD INSPECTION AND TEST PLANS FOR INSTRUMENT pate PROUECT KALSELTENG 2 CFSPP(2x100MW) CONTRACTOR DOG NO. IKCPO-YYB-G-05-049 CONTRACTOR Trobe FIELD INSPECTION AND TEST PLANS FOR ARvunoa INSTRUMENT CABLE Rona TABLE OF CONTENT COVER TABLE OF CONTENT INSPECTION AND TEST PLANS FOR CABLE ATTACHMENT (Inspection & Test Report Form) = Continuity, meger and termination power cable - Continuity termination control cable - Cable laying (arrangement cable) installation ISSUED DATE 27-DEC-2018 REVISION t Page eon FIELD INSPECTION AND TEST PLANS FOR INSTRUMENT CABLE [oweo| Drezner areunen: fee INSTALLATION roms [nstirenc? [cewacer oe ace wesasoe Ee [rs can ww Tecie 7 Tuono ep, = We = an WR = Dao RE Soak PEN) etn Gens geen se no esr sperow mM opiate Coane | pc ea eno ‘isin | Teseson [Enon | ab frors | *Somase | tacton_| Teo | come | Cmtmeer | Owner 1 [pRtpanarion 4 ocument Review "CO Tea Spates, ta She, Og, Vr ta A. set Wor Peetu sa be er foa fe aie understood relented poames convent vie rocaue, | rout ews !nosS84P0A%02.01%fopowed Oona, verde] Reina TAR Wet econ apo & MI) Te ate Spectan fon 7 |e te su aca Vetaton 1.43. Fnsse devon cepa new ~ |e te ‘rocedue and reseed - 2 [execution 24 INSTRUMENT CABLE 2A Cock cable speceaton «| w fw 22 Check cable before puting ef ow | aw 243 Check cableldereeaten nh pow dow Check stabees of as or cate beta » ow aaa fw 215 checkot lec tet wf ow | aw Document erat 26 chechcableshnle possi in| | ete | see nH ofow fw 6, Ave roa pot rec, Mana iaavon | Seaton 24.7 cableptng Baranseren nw ofow fw 24.8 Covtnuty and estore able wofow | aw 249 conn ony eortctate wopow | aw 24.10. Ternston/cnneton check wf ow fw FIELD INSPECTION AND TEST PLANS FOR INSTRUMENT CABLE Fn (rr fowens | Trai a rwanRM ici & , INSTALLATION |RALSELTENG 2 |amractor Dox. No. RPO-YY8-G-05-049 [ss ere cto mn ee ; “— Tap aH rd Ws Wes BW = RR WS = BS A ‘Sania apoe aly nanection Genecal nspecion acewty by 15 recon secetetoanen | Azeonnc tow oat erat cos | Sotue | trten _|resone | con: |= | Owe BALL Vai ces ora cometns n> wd] w | —) Foca conta aii OMLabI gindand stn ale mater nets possnyounsronony|, MEME MIRE | eecen | ge wl w lw jose, tn ne ooo aan | Be, tone ong [SPOONS wre fot, haw ao 2113 Temnatonandcomadion uc jw lw bocunenraTiON AAS dose aed pr ot al ale such x rnafces ta shes AAs i ri he | w fe ° eae Conta sted o Conary een 8g notirayoaneray/61| jpabeoneee, | tnpeon 32min ane Marloth eo ne Waite agpoees | acpomstoury vows | sect | ste > tw be {ne an et ay pene are ae | eee ‘ones - 33. AANCRorany ovate of reac ety ose etwtle ard docmeried PROVECT KALSELTENG 2 CFSPP(2x100MW) CONTRACTOR BOC_NO. IKCPO-YYB.G-05-049 CONTRACTOR | TITLE Trak FIELD INSPECTION AND TEST PLANS FOR tu INSTRUMENT CABLE OCW ATTACHMENT TSSUED DATE 27-DE02018 REVISION 1 PLN KALSELTENG 2 CFSPP (2X100 MW) Tria AHO Foc eal coazl / Consortia at Pr. (PusMaNRO) at LPP KALBAGTENG CONTINUITY, MEGER AND TERMINATON POWER: Doeno, JPAGENO CABLE evn INSTRUMENT Description Report no 5 Drawing No : Date Testing Instruemnt Location / Area Serial no: we cameo cxscesucinm — | szqam|taascan| irre) ueqin| ceeoin| som] wom | corTmureane | gsr rewaes Comment: _ a Inspected Wiiness Approved PrN (uPP Halogen) ate uvpatsncrine KALSELTENG 2 CFSPP (2X100 MW) [pec vo Pe: CONTINUITY AND TERMINATION CONTROL cante |” INSTRUMENT [Description [Dae eportno: [beatin / re Tester [rage Hype serial no DrawingNo- No ‘able ust caBLe size FKOm 70 conratenn Result | T | Comment: Inspected ‘ness Approved Quay Conrat Consortium PT PLA (PUSMANFRO) PrPLN (UPP albaperg) Date Date Date LPP KALBAGTENG zo & KALSELTENG 2 CFSPP (2X100 MW) Trae been rows CABLE LAYING (ARRANGEMENT CaBLs ) INSTALLATION [°° = Re. no: INSTRUMENT Description: Date: Report no Location / Area locner Equipment /System no. Paine [sub System: Drawing No. system T RESULT No. ITEM To CHECK REMARK ves [NO] NA 1. [Visual inspection 1 2 [confirm sie ofcable is corest [ 3. [Verify redressing cable & te wrapping comect 4 [Deseripcion cable marker is correct (any) 5 cable specitcation correctas required 6 |Layoutmain cable way are correct, 7 |enecang power & signal cable of erase secoon correct 8 [Contem thatthe cable bending radius ie satsartary 9 [eearness on cable ladcer 10 [No contice with oer instalation 11 |eavietire protection instanaton (ay) i 12 [lnstaation cover plate after eelease(\Fany ) comment tim re roxusnaneo) rancor raages)

You might also like