0% found this document useful (0 votes)
23 views

File EST

This document provides a preliminary estimate for repairs to a 2008 Chevrolet G25 Express cargo van owned by Eid Mohammad Ali Yar. The estimate was prepared by Frank's Auto Body Ltd and includes 30 items needed to repair damage to the front bumper, grille, radiator support, fenders, hood, and suspension from a front-end collision. The total estimate is $20,432.36 which covers the costs of parts, materials, labor, tax, and a 22 day repair timeframe.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
23 views

File EST

This document provides a preliminary estimate for repairs to a 2008 Chevrolet G25 Express cargo van owned by Eid Mohammad Ali Yar. The estimate was prepared by Frank's Auto Body Ltd and includes 30 items needed to repair damage to the front bumper, grille, radiator support, fenders, hood, and suspension from a front-end collision. The total estimate is $20,432.36 which covers the costs of parts, materials, labor, tax, and a 22 day repair timeframe.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

FRANK'S AUTO BODY LTD

9024 58 Ave NW
EDMONTON, AB T6E 6A9
PHONE: (780) 430-0101

*** PRELIMINARY ESTIMATE ***

RO# 1719
13/02/2024 03:56 PM

Owner

Owner: Eid Mohammad Ali Yar


Address: 16511 31Ave Cell: (780)236-5259
City Province Postal: Edmonton, AB T6W 4P8 FAX:
Email: [email protected]

Inspection

Inspection Date: 13/02/2024 03:57 PM Inspection Type:


Primary Impact: Front Secondary Impact: Undercarriage

Company: Frank'sAuto Body Ltd Appraiser License #2 :


Contact: Said Habibi
Address: 9024 58 Ave NW Work/Day: (780)430-0101
City Province Postal: Edmonton, AB T6E 6A9 Work/Day:
Email: [email protected]

Repairer
Repairer: Frank's Auto Body Ltd. Contact:
Address: 9024 58 Ave NW Work/Day: (780)430-0101
City Province Postal: Edmonton, AB T6E 6A9 Work/Day:
Email: [email protected]

Target Complete Date/Time: Days To Repair: 22

Vehicle

2008 Chevrolet G25 Express STD 2 DR Cargo Van


8cyl Gasoline 4.8
4 Speed Automatic

Lic Expire: VIN: 1GCGG25C581117345


Veh Insp# : Kilometer Type: Actual
Condition: Poor Code: U6174A
Ext. Refinish: Two-Stage Int. Refinish:

Options

AM/FM Stereo Anti-Lock Brakes Bucket Seats


Daytime Running Lights Dual Airbags Engine Cover Console
Intermittent Wipers Power Brakes Power Steering
Tinted Glass Vinyl Seats

Damages

13/02/2024 04:04 PM Page 1 of 3


2008 Chevrolet G25 Express STD 2 DR Cargo Van
Claim # : 13/02/2024 03:56 PM

Line Op Guide MC Description MFR.Part No. Price ADJ% B% Hours R

Front Bumper
1 EP 6 Bumper,Front Replace PXN $549.30 2.3 SM
2 EP 40 Pad,Front Bumper Replace PXN $143.66 INC SM
3 EP 31 Defl,Front Bumper Replace PXN $50.25 INC SM

Front End Panel And Lamps


4 EP 29 Grille Assembly Replace PXN $408.41 INC SM
5 EP 41 Headlamp Assembly LT Replace PXN $87.56 INC SM
6 E 46 Ring,Beam Mounting RT 5968095 GM Part $87.26 0.2 SM

Radiator Support
7 EP 73 Panel Assembly,Rad Sup Replace PXN $487.91 5.2 SM
8 EP 80 Crsmbr,Rad Pnl Lower Replace PXN $179.29 1.0 SM
9 L 80 Crsmbr,Rad Pnl Lower Refinish 0.5 RF

Cooling And Air Conditioning


10 RI 755 Radiator R & I Assembly INC SM
11 N 604 Refrigerant Rcvry Setu Additional Labour INC ME
12 N 977 A/C Evacuate & Recharg Additional Labour INC ME
13 N 970 A/C Evac Rechrg & Rcvr Additional Labour 1.8 ME
14 EP 731 Condenser,A/C Replace PXN $228.20 1.0 ME

Front Body And Windshield


15 EP 83 Panel,Hood Replace PXN $547.28 0.8 SM
16 L 83 13 Panel,Hood Refinish 4.9 RF
17 EP 103 Fender,Front LT Replace PXN $292.39 1.5 SM
18 L 103 Fender,Front LT Refinish 2.8 RF
19 EP 104 Fender,Front RT Replace PXN $293.06 1.4 SM
20 L 104 Fender,Front RT Refinish 2.8 RF

Front Body Interior Sheetmetal


21 EP 106 Panel,Inner Fender RT Replace PXN $338.76 11.7 SM
22 L 106 Panel,Inner Fender RT Refinish 0.8 RF
23 EP 81 Whlhs,Frt Fender Inr LT Replace PXN $480.07 2.4 SM
24 L 81 Whlhs,Frt Fender Inr LT Refinish 0.3 RF
25 EP 82 Whlhs,Frt Fender Inr RT Replace PXN $444.78 0.5 SM
26 L 82 Whlhs,Frt Fender Inr RT Refinish 0.3 RF
27 N 978 Suspension R&I Lt Additional Labour INC ME
28 N 979 Suspension R&I Rt Additional Labour INC ME

Frame
29 E 587 Frame Assy,Complete 85551570 GM Part $5,470.21 29.2 ME

Front Suspension
30 N 974 Suspension Align,Frt Additional Labour 1.5 ME
30 Items

MC Message

13 INCLUDES 0.6 HOURS FIRST PANEL TWO-STAGE ALLOWANCE

Estimate Total & Entries

OEM Parts $5,557.47


Other Parts $4,530.92
Paint & Materials 12.4 Hours @ $75.00 $930.00
Shop Materials 60.5 Hours @ $20.00 $1,210.00
Parts & Material Total $12,228.39

13/02/2024 04:04 PM Page 2 of 3


2008 Chevrolet G25 Express STD 2 DR Cargo Van
Claim # : 13/02/2024 03:56 PM

Labour Rate Replace Repair Hrs Total Hrs


Hrs

Sheet Metal (SM) $90.00 27.0 27.0 $2,430.00


Mech/Elec (ME) $110.00 30.2 3.3 33.5 $3,685.00
Frame (FR) $105.00
Refinish (RF) $90.00 12.4 12.4 $1,116.00

Labour Total 72.9 Hours $7,231.00


Goods & Services Tax @ 5.000% $972.97
Gross Total $20,432.36
Net Total $20,432.36

Alternate Parts Y/15/14/00/01/01 Cumulative 15/14/00/01/01 Postal Code: T6E Default


Rate Name Default

Audatex Estimating 10.26.67 ES 13/02/2024 04:04 PM REL 10.26.67 DT 01/01/2024 DB 08/02/2024


Province Disclosure:AB
© 2024 Audatex North America, LLC.

1.9 HRS WERE ADDED TO THIS ESTIMATE BASED ON AUDATEX'S TWO-STAGE REFINISH FORMULA.

Op Codes

* = User-Entered Value E = Replace OEM NG = Replace NAGS


EC = Replace Economy OE = Replace PXN OE Srpls UE = Replace OE Surplus
ET = Partial Replace Labour EP = Replace PXN EU = Replace Recycled
TE = Partial Replace Price PM = Replace PXN Reman/Reblt UM = Replace Reman/Rebuilt
L = Refinish PC = Replace PXN Reconditioned UC = Replace Reconditioned
TT = Two-Tone SB = Sublet Repair N = Additional Labour
BR = Blend Refinish I = Repair IT = Partial Repair
CG = Chipguard RI = R & I Assembly P = Check
AA = Appearance Allowance RP = Related Prior Damage

This report contains proprietary information of Audatex and may not be disclosed to any
third party (other than the insured, claimant and others on a need to know basis in
order to effectuate the claims process) without Audatex's prior written consent.

© 2024 Audatex North America, LLC.


AUDATEX is a trademark owned by Audatex
North America, LLC. All rights reserved.

13/02/2024 04:04 PM Page 3 of 3

You might also like