0% found this document useful (0 votes)
420 views

Risk Ass - Process

The document lists activities for various air conditioning installation and maintenance processes at Ocean Cool M&E Pte Ltd. For installation of air conditioning, it outlines 17 activities including mobilizing equipment and staff, using machinery, ladders and scaffolds, storing materials, hot works, welding, using power tools, piping works, lifting units and commissioning electrical systems. It also details activities for servicing fan coil units, condenser units and testing/commissioning air conditioning systems. The document appears to be an inventory of work activities for risk assessment purposes at Ocean Cool M&E Pte Ltd.
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
420 views

Risk Ass - Process

The document lists activities for various air conditioning installation and maintenance processes at Ocean Cool M&E Pte Ltd. For installation of air conditioning, it outlines 17 activities including mobilizing equipment and staff, using machinery, ladders and scaffolds, storing materials, hot works, welding, using power tools, piping works, lifting units and commissioning electrical systems. It also details activities for servicing fan coil units, condenser units and testing/commissioning air conditioning systems. The document appears to be an inventory of work activities for risk assessment purposes at Ocean Cool M&E Pte Ltd.
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 4

Company:

ACTIVITY-BASED RISK ASSESSMENT INVENTORY OF WORK ACTIVITIES Ocean Cool M&E Pte Ltd

No. process: location: 1 Servicing air-conditioning fan coil unit

No. 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 1 2 3 4 5

work actvities: Inform owner before service of air-con To swicth on the air-con to check if any problem After check off the swicth Cover the floor with protection Open the unit cover and take out the filter Clean the cooling coil with coil cleaner Open the water tray Vacuum the drain pipe Vacuum the fan blower Washing the filter,cover and water tray Install the water tray to the drain pipe,filter and cover Clean the work area Check the C.U Clean the coil with using water or coil cleaner Check the fan motor Clean the work area Turn on the switch Use the remote control To test the fuction To inform the owner to sign the service chit for work completed Check the tools before leave the work site

2 Servicing air-conditioning condenser unit

3 After servicing air-conditioning

ACTIVITY-BASED RISK ASSESSMENT


Company:

INVENTORY OF WORK ACTIVITIES Ocean Cool M&E Pte Ltd


No. 1 2 3 4 5 6 7 8 work actvities: Selecting the location Measure and marking Drilling the ceilling for wall plug Fixing the wall plug Fixing the mounting breket Insulation the refrigerant pipe To tape cable on to the refrigerant pipe Carry to the put on mounting bracket

No. process: location: 1 Installation of air-conditioning piping

2 Installation of Fan coil unit

1 2 3 4 5 6

Selecting the location Measure the fan coil unit and marking Drilling the ceiling for wall plug Fixing the mounting bracket Carry the fan coil unit put on mounting bracket Flare net and wire connecting to fan coil unit

3 Installation of condenser unit

1 2 3 4 5 6 1 2 3 4 5 6 7

Selecting the location Measure the condenser unit and marking Drilling the wall for wall plug Fixing the mounting bracket Carry the condenser unit put on mounting bracket Flare net and wire connecting to condenser unit Measure the supply valtage Open the high and low side valve Check the flare net for any leakage Swicth on the power supply Setting the romote control Clean the work area Check the tools before leave the work site

4 Testing and commissioning

ACTIVITY-BASED RISK ASSESSMENT


Company:

INVENTORY OF WORK ACTIVITIES Ocean Cool M&E Pte Ltd


location: No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 work actvities: mobilization of men for the work mobilization of equipments/machineries Using machineries in the site using ladders using scaffolds/working platforms store materials on scaffolds using scissorlifts hot works [gas cutting/drilling/cutting welding works welding and cutting works Using power tools Works steel structure Manual handling Piping works Working in drenches/manholes Lifting of air-con unit Commissioning of electrical system

No. process: 1 Installation of air-conditioning