Quantity Survey
Quantity Survey
L= 1.35 10 6
h =0.50 16 7
h=0.50 5
h=0.50
T D S DISCRIPTION T D S DISCRIPTION
A.SUB STRUCTURE
1.Earth work 1.4 Trench excavation
trench excavation will be done with
1.1 site clearance working space of 250mm
GB3' C X/05
GB3' a GB3' b GFS1
for GB3' a ver
4.39 L=4.392 X/04 enda
1 0.2 W=0.2
0.4 D=0.4 GFS2
0.35 m3
ditto for GB3' b X/03
1.25 L=1.249 GFS4
1 0.2 W=0.2 X/01 GFS3
X/01'
T D S DISCRIPTION T D S DISCRIPTION
concrete work for GFS1 20 0.2 L=0.2
1 9.95 L=10.55-(3*0.2)=9.95 2.25 H=2.6-0.35=2.25
3.65 W=3.85-0.2=3.65 9 m2
36.3 m2 ditto for C1 on F3
ditto for GFS2 12 0.2 L=0.2
1 11.1 L=11.68-0.6=11.08 2.35 H=2.6-0.25=2.35
2.81 W=3.21-(2*20)=2.81 5.64 m2
31.1 m2 ditto for C1 on F4
ditto for GFS3 4 0.2 L=0.2
1 4.61 L=5.41-(4*0.2)=4.61 2.4 H=2.6-0.2=2.4
6.01 W=6.41-(2*0.2)=6.01 1.92 m2
27.7 m2 ditto for C2 on F2
ditto for GBS4 4 0.2 L=0.2
1 4.95 L=5.35-(2*0.2)=4.95 2.25 H=2.6-0.35=2.25
4.98 W=4.78-(2*0.2)=4.38 1.8 m2
24.7 m2 ditto for C2 on F3
for verenda 4 0.2 L=0.2
1 3.31 L=2.03+1.28=3.31 2.35 H=2.35
11.5 W=7.41+4.10=11.52 1.88 m2
38.1 m3 ditto for C3 on F3
158 m2 Total area of concrete work for ground 4 0.2 L=0.2
floor slab 2.35 H=2.35
4. Form work for ground floor 1.88 m2
2.5 cm thickness zigba form work 22.1 m2 Total area of form work for footing
4.1 formwork for footing pad column
for F1 4.3 form work for grade beam
8 1.5 L=1.5 for GB1 on both extetrior and interior side
0.4 D=0.35+0.05=0.4 2 20.5 L=10.55+9.95=20.5
4.8 m2 0.4 D=0.4
ditto for F2 16.4 m2
16 1.3 L=1.3 ditto forGB3'a both exterior and interior
0.4 D=0.35+0.05=0.4 2 8.98 L=4.592+4.392=8.984
8.32 m2 0.4 d=0.4
ditto for F3 7.19 m2
20 1 L=1 ditto forGB3'b both exterior and interior
0.3 D=0.25+0.05=0.3 2 2.85 L=1.524+1.324=2.848
6 m2 0.7 D=0.7
ditto for CF 3.99 m2
4 2 L=2 ditto forGB3'c both interior and exterior
0.25 D=0.2+0.05=0.25 2 12.4 L=6.468+6.268=12.376
2 m2 0.4 D=0.4
21.1 m2Total area of form work for footing pad 9.9 m2
4.2 form work for footing column ditto for GB4 both interior and exterior
for C1 on F1&F2 2 21.8 L=11.145+10.615=21.76
T D S DISCRIPTION T D S DISCRIPTION
0.4 D=0.4 3.92 m 3
T D S DISCRIPTION T D S DISCRIPTION
by using similarities properties(phythagor 19 1.4 e=1.4
us theorem) 26.6 m
ditto for f
H=2.347
a 1.45 f
L=5.2 2.2 f =(1.45)2+12
2
ver
enda
SUB STRUCTURE
LOCATION SHAPE dia(ɸ) length no of no of total no DIAMETER OF BARS
(mm) bar member of bar 6 10 12 14 16 18 20
foundation footing
F1 12 1.9 18 2 36 68.4
F2 10 1.7 20 4 80 136
F3 10 1.2 10 5 50 60
stirrup
Grade beam
GB3 Top 14 7 3 1 3 21
Ground slab
&X/05
B) SUPER STRUCTURE
14 3.66 2 11 22 80.52
C4 14 3.81 6 2 12 43.92
Sttirrups
16 6.425 4 12 48 299.7
TB1 negative 14 3 1 2 2 6
TB2 Negative 14 3 1 2 2 6
FB1 Top 16 11 2 3 6 66
FB1' Top 16 11 2 1 2 22
Stirrups
st 1 8 0.9 9 5 45 40.5
st 2 8 1.04 10 1 10 10.4
TB6 Bottom 12 5 3 1 3 15
Stirrups
Total
length 170 1427 608 828 1229
unit
weight 2.22 3.95
Total
weight 378 5635 0 0 0
Rate analysis sheet for Direct and Indirect cost
Indexed Type of
Type of Cost per Labor by hourly Hourly equipme Hourly Hourly
material Unit Qty * Rate unit trade No UF cost cost nt NO rental cost
A. Material unit cost B. Man power unit cost C. Equipment unit cost
Total labor cost 0
hourly output