Quantity Survey

This document provides details of the electrical installation for a building including quantities of materials. It lists the number of different types of lighting, switches, outlets and other electrical components. It also provides dimensions and calculations for excavation work including trench excavation, pit excavation, backfill quantities and volumes excavated and backfilled. Masonry wall dimensions are listed along with their volumes.

Uploaded by

Biruk kebede
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
56 views23 pages

Quantity Survey

This document provides details of the electrical installation for a building including quantities of materials. It lists the number of different types of lighting, switches, outlets and other electrical components. It also provides dimensions and calculations for excavation work including trench excavation, pit excavation, backfill quantities and volumes excavated and backfilled. Masonry wall dimensions are listed along with their volumes.

Uploaded by

Biruk kebede
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 23

electrical instalation GF FF total unit price totalamou

double florecent _ ___ 4


lighting single florecent 4 ___ 3
single down light 12 9 20
single wall light 20 15 34
single socket 16 13 36
double socket 1 2 3
single swicthe 3 21 24
double swiches 7 26 33
tell box 2 4 6
tv 1 3 4
bell 0 0 14
electric wire
socket 124.74 114.7 239.44
lighting posetive and negative wi 226.04 240.5 466.54
swicth 13.5 27 40.5
condiut for lighting 56.51 120.05 176.56
conduit for socket 62.37 57.35 119.72
bell 35.96 40.77 76.73
tv 16.25 27.09 43.34
tell 22.93 24.25 47.18

L= 1.35 10 6

h =0.50 16 7
h=0.50 5
h=0.50
T D S DISCRIPTION T D S DISCRIPTION
A.SUB STRUCTURE
1.Earth work 1.4 Trench excavation
trench excavation will be done with
1.1 site clearance working space of 250mm

site clearace will be done with theaverage


depth 200mm and working space of 1m on axis X/03,X/04,X/05
1 18 L=16+2*(1)=18 24.6 L=4.2+4.15+4.3+3.891+4.3+3.75=24.59
27 W=25+2*(1)=27 1 1 W=0.5+2*(0.25)=1
486 m2 Total area of site clearance 0.85 D=1.65-0.8=0.85
1.2 bulk excavation 20.9 m2
bulk excavation will be done with average
depth of 0.8m and working space of
250mm ditto on axis Y/01,Y/02
16.5 L=16+2*(0.25)=16.5 8.65 L=8.645
1 25.5 W=25+2*(0.25)=25.5 2 1 W=1
0.8 D=0.8 0.85 D=0.85
337 m3 Total volume of bulk excavation 14.7 m3
1.3 Pit excavation ditto on axisY/03
pit excavation will be done with working
space of 250mm 7.55 L=4.05+0.45+3.05=7.55
for F1 1 1 W=1
2 L=1.5+2*(0.25)=2 0.85 D=0.85
2 2 W=1.5+2*(0.25)=2 6.42 m3
1.8 D=2.65-(0.8)=1.85 ditto on axis X/01'
14.4 m3 5.4 L=5.4
ditto for F2 1 1 W=1
1.8 L=1.3+2*(0.25)=1.8 0.85 D=0.85
4 1.8 W=1.3+2*(0.25)=1.8 4.59 m3
1.85 D=2.65-0.8=1.85 ditto on axis X/01
24 m3 5.75 L=1.595+4.15=5.745
ditto for F3 1 1 W=1
1.5 L=1+2*(0.25)=1.5 0.85 D=0.85
5 1.5 W=1.2+2*(0.25)=1.5 4.88 m3
1.85 D=2.65-0.8=1.85 51.5 m3 Total volume of treanch excavation
20.8 m3 1.5 Back fill
ditto for chimney footing CF a) Backfill around footing pad & footing
2.5 L=2+2*(0.25)=2.5 column
1 1.5 W=1+2*(0.25)=1.5 BF=TVPE-TVFPC
1.85 D=2.65-0.8=1.85 F1 pad=(1.5*1.5*0.35)2=1.575
6.94 m2 F1 column=(0.3*0.2*2.25)2=0.27
66.1 m3 Total volume of pit excavation F2pad=(1.3*1.3*0.35)4=0.59
F2 column=(0.3*0.2*2.25)4=0.81
F3 pad=(1*1*0.25)5=1.25
T D S DISCRIPTION T D S DISCRIPTION
F3 column=(0.3*0.2*2.35)5=0.705 C) Borrow fill
CF pad=(2*1*0.2)1=0.4 filling with selected materials
CF column=(0.3*0.2*2.25)1=0.135 b/n axis X/03 & X/04
66.1 TVFPC=5.735 9.05 L=10.55-(3*0.5)=9.05
5.74 TVPE=66.1 1 6.98 W=6.98
60.4 m3 Total volume of Back fill around 0.4 D=0.4
footing pad and footing column 25.3 m3
b) Back fill around masonry wall b/n axis Y/02&Y/03 and b/nX/02&X/03
masonry wall 6.68 L=7.68-(2*0.5)=6.68
on axis X/03,X/04,X/05 1 4.35 W=5.35-(2*0.5)=4.35
9.95 L=9.95 0.4 D=0.4
3 0.5 W=0.5 11.6 m3
1.45 D=1.45 b/n axis X/01' & X/03 and Y/01 & Y/02
21.6 m3 5.42 L=6.42-(2*0.5)=5.42
ditto for X/01' 1 4.45 W=5.45-(2*0.5)=4.45
5.45 L=5.45 0.4 D=0.4
1 0.5 W=0.5 4.05 m3
1.45 D=1.45 40.9 m3Total volume borrow fill
3.95 m3 1.6 Cart away
ditto for X/01 CA= Total volume of excavation - total
4.95 L=4.95 volume of backfill
1 0.5 W=0.5 TVE=(site clearance)*0.2+bulkexcavation+
1.45 D=1.45 pit excavation+treanch excavation
3.59 m3 TVE=(486)*0.2+337+66+61
ditto for Y/01 & Y/02 TVE=561.2
11.9 L=11.91 TVB=73
2 0.5 W=0.5 CA=561.2-73=488.2
1.45 D=1.45 488 m3 Total volume of cart away
17.3 m3 2. Masonry wall
ditto for Y/03 on axis X/03,X/04,X/05
9.11 L=9.11 9.95 L=10.55-(3*0.2)=9.95
1 0.5 W=0.5 3 0.5 W=0.5
1.45 D=1.45 1.45 D=1.45
6.6 m3 21.6 m3
53.1 m3 Total volume of masonry wall ditto for X/01'
61.4 Total volume of treanch excavation=61.4 5.45 L=5.45
53 1 0.5 W=0.5
8.4 m3 Total volume of backfill around 1.45 D=1.45
masonry wall 3.95 m3
68.8 m3 Total volume of backfill ditto for X/01
4.95 L=5.35-(2*0.2)=4.95
1 0.5 W=0.5
1.45 D=1.45
3.59 m3
T D DISCRIPTION T D S DISCRIPTION
ditto for Y/01 & Y/02 ditto for Y/01 & Y/02
11.9 L=13.11-(4*0.3)=11.91 4 11.9 L=11.91
2 0.5 W=0.5 0.5 W=0.5
1.45 D=1.45 23.8 m2
17.3 m3 ditto for Y/03
ditto for Y/03 2 9.11 L=9.11
9.11 L=10.01-(3*0.3)=9.11 0.5 W=0.5
1 0.5 W=0.5 9.11 m2
1.45 D=1.45 73.2 m2 Total area of lean concrete under and
6.6 m3 above masonry wall
146 m3 Total volume of masonry wall 91.4 m2 Total area of lean concrete
3. Concrete Work 3.2 C-25 concrete with mixed ratio 1:2:3
3.1 Lean Concrete with mixed ratio 1:5(C5) a) concrete work for footng pad
a) Lean Concrete under footing pad for F1
for F1 1.5 L=1.5
2 1.5 L=1.5 2 1.5 W=1.5
1.5 W=1.5 0.35 D=0.35
4.5 m2 1.58 m3
ditto for F2 ditto for F2
4 1.3 L=1.3 1.3 L=1.3
1.3 W=1.3 4 1.3 W=1.3
6.76 m2 0.35 D=0.35
ditto for F3 2.37 m3
5 1 L=1 ditto for F3
1 W=1 1 L=1
5 m2 5 1 W=1
ditto for CF 0.25 D=0.25
1 2 L=2 1.25 m3
1 W=1 ditto for CF
2 m2 2 L=2
18.3 m2 Total area lean concrete under footing 1 1 W=1
b)leanconcrete under&above masonrywall 0.2 D=0.2
on axis X/03,X/04,X/05 0.4 m3
6 9.95 L=9.95 5.59 m3 Total volume of concrete work for
0.5 W=0.5 footing pad
29.8 m2 b) concrete work for fooing column
ditto on axis X/01 for C1 and C2 on F1,F2,CF
2 4.95 L=4.95 0.3 L=0.3
0.5 W=0.5 7 0.2 W=0.2
4.95 m2 2.25 D=2.6-0.35=2.25
ditto on axis X/01' 0.95 m3
2 5.45 L=5.45 ditto for C1,C2 & C3 on F3
0.5 W=0.5 0.3 L=0.3
5.45 m2 5 0.2 W=0.2
T D DISCRIPTION T D S DISCRIPTION
2.35 D=2.6-0.25=2.35 0.7 D=0.7
0.71 m3 0.17 m3
1.65 m3 Total volume of concrete work for ditto for GB3' c
foundation column 6.3 L=6.3
c) Concrete work for grade beam 1 0.2 W=0.2
concrete work for GB1 0.4 D=0.4
9.95 L=9.95 0.5 m3
1 0.2 W=0.2 1.03 m3
0.4 D=0.4 ditto for GB3
0.8 m3 11.3 L=11.295
ditto for GB2 1 0.2 W=0.2
11 L=10.97 0.4 D=0.4
2 0.2 W=0.2 0.9 m3
0.4 D=0.4 ditto for GB4
1.76 m3 9.8 L=9.795
ditto for GB1' 1 0.2 W=0.2
6.85 L=6.845 0.4 D=0.4
1 0.2 W=0.2 0.78 m3
0.4 D=0.4 ditto for GB5
0.55 m3 2.35 L=2.345
ditto for GB6 1 0.2 W=0.2
4.9 L=4.9 0.4 D=0.4
1 0.2 W=0.2 0.19 m3
0.4 D=0.4 ditto for GB3''
0.39 m3 5.6 L=5.6
ditto for GB5' 1 0.2 W=0.2
2.45 L=2.345 0.4 D=0.4
1 0.2 W=0.2 0.45 m3
0.4 D=0.4 7.04 m3 Total volume of concrete work for
0.2 m3 grade beam
ditto for GB3' d) concrete work for ground floor slab
Y/01 Y/01' Y/02 Y/03

GB3' C X/05
GB3' a GB3' b GFS1
for GB3' a ver
4.39 L=4.392 X/04 enda
1 0.2 W=0.2
0.4 D=0.4 GFS2
0.35 m3
ditto for GB3' b X/03
1.25 L=1.249 GFS4
1 0.2 W=0.2 X/01 GFS3

X/01'
T D S DISCRIPTION T D S DISCRIPTION
concrete work for GFS1 20 0.2 L=0.2
1 9.95 L=10.55-(3*0.2)=9.95 2.25 H=2.6-0.35=2.25
3.65 W=3.85-0.2=3.65 9 m2
36.3 m2 ditto for C1 on F3
ditto for GFS2 12 0.2 L=0.2
1 11.1 L=11.68-0.6=11.08 2.35 H=2.6-0.25=2.35
2.81 W=3.21-(2*20)=2.81 5.64 m2
31.1 m2 ditto for C1 on F4
ditto for GFS3 4 0.2 L=0.2
1 4.61 L=5.41-(4*0.2)=4.61 2.4 H=2.6-0.2=2.4
6.01 W=6.41-(2*0.2)=6.01 1.92 m2
27.7 m2 ditto for C2 on F2
ditto for GBS4 4 0.2 L=0.2
1 4.95 L=5.35-(2*0.2)=4.95 2.25 H=2.6-0.35=2.25
4.98 W=4.78-(2*0.2)=4.38 1.8 m2
24.7 m2 ditto for C2 on F3
for verenda 4 0.2 L=0.2
1 3.31 L=2.03+1.28=3.31 2.35 H=2.35
11.5 W=7.41+4.10=11.52 1.88 m2
38.1 m3 ditto for C3 on F3
158 m2 Total area of concrete work for ground 4 0.2 L=0.2
floor slab 2.35 H=2.35
4. Form work for ground floor 1.88 m2
2.5 cm thickness zigba form work 22.1 m2 Total area of form work for footing
4.1 formwork for footing pad column
for F1 4.3 form work for grade beam
8 1.5 L=1.5 for GB1 on both extetrior and interior side
0.4 D=0.35+0.05=0.4 2 20.5 L=10.55+9.95=20.5
4.8 m2 0.4 D=0.4
ditto for F2 16.4 m2
16 1.3 L=1.3 ditto forGB3'a both exterior and interior
0.4 D=0.35+0.05=0.4 2 8.98 L=4.592+4.392=8.984
8.32 m2 0.4 d=0.4
ditto for F3 7.19 m2
20 1 L=1 ditto forGB3'b both exterior and interior
0.3 D=0.25+0.05=0.3 2 2.85 L=1.524+1.324=2.848
6 m2 0.7 D=0.7
ditto for CF 3.99 m2
4 2 L=2 ditto forGB3'c both interior and exterior
0.25 D=0.2+0.05=0.25 2 12.4 L=6.468+6.268=12.376
2 m2 0.4 D=0.4
21.1 m2Total area of form work for footing pad 9.9 m2
4.2 form work for footing column ditto for GB4 both interior and exterior
for C1 on F1&F2 2 21.8 L=11.145+10.615=21.76
T D S DISCRIPTION T D S DISCRIPTION
0.4 D=0.4 3.92 m 3

17.4 m2 ditto for C3


ditto for GB6 both interior and exterior A=πR2
2 10.3 L=5.45+4.85=10.3 A=π(0.15)2
0.4 D=0.4 1 0.07 A=0.071m2
8.24 m2 2.76 H=2.76
ditto for GB1' both interior and exterior 0.2 m3
2 13.6 L=6.795+6.795=13.59 ditto for C4
0.4 D=0.4 A=πR2
10.9 m2 A=π(0.15)2
ditto for GB2 both exterior and interior 2 0.07 A=0.071m2
2 44.1 L=11.27+10.87+10.87+11.07=44.08 2.76 H=2.76
0.4 D=0.4 0.39 m3
35.3 m2 5.83 m2Total volume of concrete work for GF
ditto for GB5' both exterior and interior elevational column
2 5.83 L=2.945+2.885=5.83 2.1.2 Concrete work for first floor beam
0.4 D=0.4 for FB1
4.66 m2 10.6 L=10.55
ditto for GB3'' both exterior and interior 3 0.2 W=0.2
2 11.1 L=5.625+5.425=11.05 0.3 D=0.3
0.4 D=0.4 1.9 m2
8.84 m2 ditto for FB1' b/n axis Y/01& Y/02
ditto for GB5 both exterior and interior 5.08 L=5.475-(2*0.2)=5.075
2 5.04 L=2.52+2.52=5.04 1 0.2 W=0.2
0.4 D=0.4 0.3 D=0.3
4.03 m 2
0.3 m3
ditto for GB3 both exterior and interior ditto for FB1' b/n axis Y/02& Y/03
2 23.3 L=11.545+11.745=23.29 1 4.93 L=5.125-0.2=4.925
0.4 D=0.4 0.4 W=0.4
18.6 m 2
0.15 D=0.15
145 m Total area of form work for grade beam
2
0.3 m3
167 m2 Total area of formwork for substructure ditto for FB2
2.super structure 4.71 L=4.71
2.1.1 concrete work for elevational column 1 0.2 W=0.2
for C1 0.3 D=0.3
0.2 L=0.2 0.28 m2
8 0.3 W=0.3 ditto for FB2'
2.76 D=2.76 3.7 L=4.1-0.4=3.7
1.32 m 3
1 0.2 W=0.2
ditto for C2 0.3 D=0.3
A=πR 2
0.22 m2
A=π(0.3/2)2 ditto for FB3
2 0.71 A=0.071m2 11.4 L=11.41
2.76 H=2.76 1 0.32 W=0.2
T D S DISCRIPTION T D S DISCRIPTION
0.3 D=0.3 ditto for balcony
1.1 m3 1 2.31 L=2.31
4.1 m Total volume of concrete work for
3
1.52 W=1.52
first floor beam 3.51 m2
2.1.3 concrete work for first floor 109 m2 Total area of concrete work for first
y/01 y/02 y/03 floor slab
2.1.4 concrete work for first floor column
for C1
x/05 0.2 L=0.2
FFS1 FFS2 8 0.3 W=0.3
x/04 2.81 D=2.81
FFS6 FFS3 1.35 m3
x/3 ditto for C2
FFS4 0.2 L=0.2
x/02 2 0.3 W=0.3
FFS5 2.81 D=2.81
x/01' 0.34 m3
ditto for C3
balcony A=πR2
(B) A=π(0.15)2
concrete work for FFS1 1 0.07 A=0.071m2
1 6.04 L=6.41-(2*0.2)=6.01 2.81 H=2.81
3.65 W=3.85-0.2=3.65 0.2 m3
22 m2 1.89 m3 Total area of concrete work for column
ditto for FFS2 2.1.5 concrete work for Top Tie beam
1 3.93 L=4.13-0.2=3.93 for TB1
4.46 W=4.86-(2*0.2)=4.46 10.6 L=10.55
17.5 m2 2 0.25 W=0.25
ditto for FFS6 0.25 D=0.25
1 1.5 L=1.5 1.32 m3
3.1 W=3.10 ditto for TB6
4.65 m2 12.2 L=12.22
ditto for FFS3 1 0.25 W=0.25
1 2 L=2.2-0.2=2 0.25 D=0.25
2.81 W=3.21-(2*0.2)=2.81 0.76 m3
5.62 m2 ditto for TB2
ditto for FFS4 20.7 L=21.475-(2*0.25)=20.725
1 4.95 L=5.35-(2*0.2)=4.95 2 0.25 W=0.25
6.81 W=7.61-(0.4+2*0.2)=6.81 0.25 D=0.25
33.7 m2 2.59 m2
ditto for FFS5 ditto for TB5
1 5 L=5.40-(2*0.2)=5 10.4 L=11.4-(4*0.25)=10.4
4.31 W=4.71-2*(0.2)=4.31 2 0.25 W=0.25
21.5 m2 0.25 D=0.25
T D S DISCRIPTION T D S DISCRIPTION
1.3 m3 3.16 H=3.16
ditto for TB3 16.9 m3
4.13 L=4.125 ditto on axis Y/01'
1 0.25 W=0.25 3.7 L=3.70
0.25 D=0.25 1 3.16 H=3.16
0.26 m3 11.7 m2
ditto for TB7 ditto on axis Y/02 b/n X/02 & X/04
1.21 L=1.206 1 5.42 L=5.92-0.5=5.42
1 0.25 W=0.25 2.76 H=2.76
0.25 D=0.25 15 m2
0.08 m3 ditto on axis X/04 b/n Y/02&Y/03
ditto for TB4 1 4.95 L=4.95
3.2 L=3.2 2.76 H=2.76
1 0.25 W=0.25 13.7 m2
0.25 D=0.25 133 m2 Total area of HCB 20 work on GF
0.2 m3 2.2.2 HCB 15 work
6.51 m3 Total volume of concrete work for for ground floor
top tie beam on axis Y/02 b/n X/04&X/05
2.2 Block work/HCB work 1 3.6 L=3.6
2.2.1 HCB 20 2.76 H=2.76
for ground floor 9.94 m2
on axis X/05 ditto X/04
1 9.95 L=10.55-(3*0.2)=9.95 1 3.7 L=3.70
2.76 H=2.76 2.76 H=2.76
27.5 m2 10.2 m2
ditto on axis Y/01 b/n X/04 & X/05 ditto on axis X/03
1 3.55 L=3.55 1 2.68 L=2.68
2.76 H=2.76 2.76 H=2.76
9.8 m2 7.4 m2
ditto on axis Y/01 b/n X/01 & X/03 ditto b/n X/03 & X/04
1 1.77 L=1.77 1 3.57 L=3.57
2.76 H=2.76 3.16 H=3.16
4.89 m2 11.3 m2
ditto b/n axis X/03&X/04 38.8 m2 Total area of HCB 15 work on GF
1 4.84 L=3.10+1.84=4.94 Reduction
3.16 H=3.16 windows
15.3 m2 for W1
ditto on axis Y/03 2 1.2 L=1.2
1 6.6 L=9-(3*0.3+1.5)=6.6 2.5 W=2.5
2.76 H=2.76 6 m2
18.2 m2 ditto for W2
ditto on axis X/02 1 1.5 L=1.5
1 5.35 L=5.35 1.46 W=1.46
2.19
T D S DISCRIPTION T D S DISCRIPTION
ditto for W3 ditto on axis Y/01
1 0.6 L=0.6 1 7.66 L=7.66
0.7 W=0.7 2.81 H=2.81
0.42 m2 21.5 m2
8.61 m2 Total area of windows ditto on axis X/01'
window door 1 5 L=5
for WD 1 2.81 H=2.81
2 0.9 L=0.9 14.1 m2
2.5 W=2.5 ditto on axis X/02
4.5 m2 1 5.15 L=5.15
ditto for WD2 3.06 H=3.06
1 2.4 L=2.4 15.8 m2
2.5 W=2.5 ditto on axis Y/03
6 m2 1 8.46 L=8.46
10.5 m2 Total area of window door 2.81 H=2.81
DOOR 23.8 m2
for D1 ditto on axis Y/02 b/n X/01' & X/03
3 0.9 L=0.9 1 4.2 L=4.2
2.66 H=2.66 2.81 H=2.81
7.18 m2 11.8 m2
ditto for D2 ditto b/n axis Y/2 & Y/03
1 1.83 L=1.83 1 5.08 L=5.08
2.5 H=2.5 2.81 H=2.81
4.58 m2 14.3 m2
ditto for D3 118 m2 Total area of HCB 20 work on first floor
1 0.8 L=0.8 2.2.4 HCB 15 Work for First Floor
2.66 H=2.66 on axis X/03 & X/04
2.13 m2 2 3.38 L=3.38
ditto for D4 2.81 H=2.81
1 0.9 L=0.9 19 m2
2.1 W=2.1 ditto b/n axis Y/01' & Y/02
1.89 m2 1 4.6 L=4.60
15.8 m2 Total area for Door 3.06 H=3.06
34.9 m2 Total area of Reduction 14.1 m2
137 m2 Total area of HCB work without doors, ditto b/n axis Y/02 & Y/03
window door& window 1 11.7 L=11.73
2.2.3 HCB 20 Work for First Floor 3.06 H=3.06
on axis X/05 35.9 m2
1 6.01 L=6.01 69 m2 Total area of HCB 15 work on first floor
2.81 H=2.81 Reduction
16.9 m2 windows
for W1
2 1.2 L=1.2
2.5 W=2.5
T D S DISCRIPTION T D S DISCRIPTION
6m 2
0.25 D=0.25
ditto for W2 1.94 m3
2 1.5 L=1.5 ditto for Landing
1.46 W=1.46 2.5 L=2.5
4.38 m2 1 1.1 W=1.3-0.2=1.1
ditto for W3 0.15 D=0.15
1 0.8 L=0.8 0.41 m2
0.1 W=0.1 3.35 m2 Total concrete work for staircase
0.08 m2 2.3.2 Formwork for Stair case
10.5 m2 Total area of window Right and Left side for runways
Window Door 4 3.12 L=3.12
for WD3 0.4 D=0.4
2 1.21 L=1.206 4.99 m2
2.5 D=2.5 ditto for soffet slab for runway
6.03 m2 2 2.4 L=2.4
DOOR 1.25 w=1.25
for D1 6 m2
3 0.9 L=0.9 ditto for riser
2.66 H=2.66 18 1.25 L=1.25
7.18 m2 0.17 D=0.17
ditto for D3 3.83 m2
3 0.8 L=0.8 ditto for right and left side of landing
2.66 H=2.66 2 1.1 L=1.3-0.2=1.1
6.38 m2 0.15 D=0.15
13.6 m2Total area of doors 0.33 m2
30.1 m2 Total area of reduction ditto for front side of landing
157 m2 Total area of HCBwork without reduction 1 3.1 L=3.1
2.3 Stair case 0.15 D=0.15
2.3.1 Concrete work for stair case 0.46 m2
for Riser and thread ditto for soffet form work for landing
0.3 1 3.1 L=3.1
1.3 W=1.3
D=0.17 4.03 m2
19.6 m2 Total area of form work for staircase
A=1/2(0.17)*(0.3) 2.4 Plastering and painting
A=0.026 Plastering and painting for Ground floor
V=L*W*D both internal & external
V=L*A on axis X/05
V=2.4*0.026 1 20 L=10.55+10.35=20.9
16 V=0.0624 2.79 H=2.79
1 m3 55.8 m2
Soffet Slab under thread and riser ditto for X/02
1.25 L=1.25 1 10.3 L=5.35+4.95=10.3
2 3.1 W=3.1 2.79 H=2.79
T D S DISCRIPTION T D S DISCRIPTION
28.7 m 2
Floor finishing
ditto for Y/03 for ground floor
1 15.8 L=8.51+7.31=15.82 ceramic tile
2.79 H=2.79 A=18.60+2.15
44.1 m2 20.8 m2
ditto for Y/02 Marble tile
1 20 L=10+10=20 A=7+9.75+10.73=35.58
2.79 H=2.79 35.6 m2
55.8 m2 Concrete tile
ditto for Y/01' A=14.60
1 7.4 L=3.70+3.70=7.4 14.6 m2
2.79 H=2.79 Paraquet tile
20.6 m2 A=18.25+27=45.25
ditto for X/04 45.3 m2
1 23.3 L=11.65+11.65=23.30 116 m2 Total area of Floor finishing for GF
2.79 H=2.79 For first Floor
65 m2 ceramic tile
ditto for X/03 A=5.45+7.65+2.65=15.75
1 5.36 L=2.68+2.68=5.36 15.8 m2
2.79 H=2.79 Paraquet tile
15 m2 A=12.8+5.8+27.85+23=69.45
for partion wall 69.5 m2
on axis Y/01 Marble tile
1 7.2 L=3.6+3.6=7.2 A=10.25+7=17.25
2.76 H=2.76 17.3 m2
19.9 m2 102 m2 Total area floor finish for FF
ditto for X/04 219 m2 Total area of Floor finish
1 7.4 L=3.7+3.7=7.4 ROOF WORK
2.76 H=2.76 Roof cover
20.4 m2
ditto for X/03 H=2.347
1 5.36 L=5.36
2.76 H=2.76 L=5.2
14.8 m2 C =(5.2) +(2.347)2
2 2

ditto b/n axis X/03&X/04 C2=5.7


1 7.14 L=7.14 1 11.1 L=11.1
22.6 m2 63.3 m2 Total area of Roof Cover
299 m2 Total area of plastering for GF Roof truss
for First floor A. vertical member
2 157 h=2.47
314 m2 Total area of plastering for FF a b c
645 m2 Total area of Plastering L=5.2

T D S DISCRIPTION T D S DISCRIPTION
by using similarities properties(phythagor 19 1.4 e=1.4
us theorem) 26.6 m
ditto for f
H=2.347
a 1.45 f
L=5.2 2.2 f =(1.45)2+12
2

a/2.2=2.347/5.2 19 1.7 f=1.7


19 0.99 a=0.99 32.3 m
18.8 m ditto for g
ditto for b
1.89 g
H=2.347 b g =1.89 +1
2 2 2

L=5.2 3.2 19 2.1 g=2.1


2.347/5.2=b/3.2 39.9 m
19 1.45 b=1.45 98.8 m Total length of diagonal member
27.6 m C) Rafter
ditto for c
, 2.347 a
h=2.347 c
, 5.2
L=5.2 4.2 a = 5.2 +2.3472
2 2

2.347/5.2=c/4.2 D) Bottom Chord


19 1.89 c=1.89 19 5.2 L=5.2
35.9 m 98.8 m Total length of bottom chord
ditto for D D) ceiling
below axis X/05 B/n Y/02 & Y/03
H=2.347 1 4.95 L=4.95
10.5 W=10.54
L=5.2 52.2 m2
19 2.35 ditto above axis X/05 b/n axis Y/02 & Y/03
44.6 m 1 4.17 L=4.168
127 m Total length of vertical member 1.03 W=1.025
B) Diagonal member 4.27 m2
ditto b/n axis Y/01 & Y/02
1 3.9 L=5.4-0.5=3.9
10.6 W=10.554
e f g 41.2 m2
.0.1 1.45 1.89 2.47 ditto at the right side of axis Y/01
on e 1 3.1 L=3.1
by phythagoreus theorem 1.03 W=1.025
3.18 m2
.0.99 e 101 m2 Total area of ceiling
E) Bottom chord
e2=(0.99)2+12
T D D DISCRIPTION T D S DISCRIPTION
19 5.2 L=5.2 1 0.9 L=0.9
98.8 m Total length of bottom chord 2.1 W=2.1
F) purlin 50*40 1.89 m2
34 5.2 L=5.2 Reduction
177 m Total length of purlin windows
window and door finishing for W1
windows 2 1.2 L=1.2
for W1 2.5 W=2.5
2 1.2 L=1.2 6 m2
2.5 W=2.5 ditto for W2
6 m2 2 1.5 L=1.5
ditto for W2 1.46 W=1.46
1 1.5 L=1.5 4.38 m2
1.46 W=1.46 ditto for W3
2.19 1 0.8 L=0.8
ditto for W3 0.1 W=0.1
1 0.6 L=0.6 0.08 m2
0.7 W=0.7 10.5 m2 Total area of window
0.42 m2 Window Door
0.42 m2 Total area of windows for WD3
window door 2 1.21 L=1.206
for WD 1 2.5 D=2.5
2 0.9 L=0.9 6.03 m2
2.5 W=2.5 DOOR
4.5 m2 for D1
ditto for WD2 3 0.9 L=0.9
1 2.4 L=2.4 2.66 H=2.66
2.5 W=2.5 7.18 m2
6 m2 ditto for D3
10.5 m2 Total area of window door 3 0.8 L=0.8
DOOR 2.66 H=2.66
for D1 6.38 m2
3 0.9 L=0.9 23.3 m2 Total area of door and door finishing
2.66 H=2.66
7.18 m2
ditto for D2
1 1.83 L=1.83
2.5 H=2.5
4.58 m2
ditto for D3
1 0.8 L=0.8
2.66 H=2.66
2.13 m2
ditto for D4
Y/03

ver
enda
SUB STRUCTURE
LOCATION SHAPE dia(ɸ) length no of no of total no DIAMETER OF BARS
(mm) bar member of bar 6 10 12 14 16 18 20

foundation footing

F1 12 1.9 18 2 36 68.4

F2 10 1.7 20 4 80 136

F3 10 1.2 10 5 50 60

footing for chimney 10 2.1 11 1 11 23.1

footing for chimney 10 1.1 5 1 5 5.5

Foundation column 16 4 4 12 48 192

for all column 14 4 2 12 24 96

stirrup

for all column 6 0.9 6 12 72 64.8

Grade beam

G.B 1 Top 14 11.2 3 1 3 33.6

GB1 Bottom 12 10.5 3 1 3 31.5

GB2 Top 16 11.2 3 2 6 67.2

GB2 Bottom 16 10.5 3 2 6 63

GB3 Top 14 6.35 3 1 3 19.05


GB3 Bottom 12 7.75 3 1 3 23.25 63

LOCATION SHAPE dia(ɸ) length no of no of total no DIAMETER OF BARS

(mm) bar member of bar 6 10 12 14 16 18 20

GB3 Top 14 7 3 1 3 21

GB3 Bottom 12 5.8 3 1 3 17.4

GB4 Top 14 11.75 3 1 3 35.25

GB4 Bottom 12 11.05 3 1 3 33.15

GB5 Top 16 3.55 3 1 3 10.65

GB5 Bottom 16 2.85 3 1 3 8.55

GB6 Top 14 6.365 3 1 3 19.09

GB6 Bottom 12 5.67 3 1 3 17.01

GB1' Top 16 8.045 3 1 3 24.13

GB1' Bottom 12 7.345 3 1 3 22.03

GB3' Top 14 8.55 3 1 3 25.65

GB3' Top 14 8.48 3 1 3 25.44

GB3' Bottom 12 6.12 3 1 3 18.36

GB3' Bottom 12 7.13 3 1 3 21.39

GB3'' Top 14 6.65 3 1 3 19.95

GB3'' Bottom 12 5.95 3 1 3 17.85


stirrup

Sec C-C 8 1.7 10 1 10

LOCATION SHAPE dia(ɸ) length no of no of total no DIAMETER OF BARS

(mm) bar member of bar 6 8 10 12 14 16 18 20

Ground slab

b/n Y/01,Y/02, Y/03 8 9.95 41 1 41 407.9

b/n X/01,X/02,X/03,X/04 8 10.506 42 1 42 441.3

&X/05

B) SUPER STRUCTURE
14 3.66 2 11 22 80.52

Elevation column C1,C2,C3 16 3.66 4 11 44 161

C4 14 3.81 6 2 12 43.92

Sttirrups

sec A-A 6 0.9 6 8 48 43.2

1st Floor Slab


b/n axis X/01&X/03
&Y/01&Y/02 horizontal 8 4.7 20 1 20 94
b/n axis X/01&X/03
&Y/01&Y/02 Vertical 8 4.73 20 1 20 94.6
b/n axis X/01&X/04 and
Y/02&Y/03 horizontal 8 5.15 27 1 27 139.1
b/n axis X/01&X/04 and
Y/02&Y/03 vertical 8 6.86 29 1 29 198.9

16 6.425 4 12 48 299.7

1st Floor elevation column 14 6.425 2 12 24 149.8

Top tie beam

LOCATION SHAPE dia(ɸ) length no of no of total no DIAMETER OF BARS

(mm) bar member of bar 6 8 10 12 14 16 18 20

TB1 Top 14 10.9 2 2 4 43.6

TB1 negative 14 3 1 2 2 6

TB1 Bottom 12 10.5 3 2 6 63

TB2 Top 14 11.92 2 2 4 47.68

TB2 Negative 14 2.35 1 2 2 4.7

TB2 Negative 14 3 1 2 2 6

TB2 Negative 14 1.5 1 2 2 3

TB2 Bottom 12 11.52 3 2 6 69.12

TB3 Top 12 4.48 2 1 2 8.96

TB3 Bottom 12 4.08 2 1 2 8.16

TB4 Top 12 3.45 2 1 2 6.9

TB4 Bottom 12 3.05 2 1 2 6.1


TB7 Top 14 1.55 3 1 3 4.65

TB7 Bottom 12 1.15 2 1 2 2.3

Sec B-B & B'-B' 6 0.785 5 3 15 11.77

First Floor Beam

FB1 Top 16 11 2 3 6 66

FB1Negative 14 2.6 7 3 21 5.76

LOCATION SHAPE dia(ɸ) length no of no of total no DIAMETER OF BARS

(mm) bar member of bar 6 8 10 12 14 16 18 20

FB1 Bottom 16 10.5 2 3 6 63

FB1' Top 16 11 2 1 2 22

FB1' Negative 16 1.88 2 1 2 3.76

FB1' Negative 16 7.05 2 1 2 14.1

FB1' Negative 16 2.6 2 1 2 5.2

FB1' Negative 16 5.35 2 1 2 10.64

FB1' Bottom 16 10.5 2 1 2 21

FB2 Top 16 4.45 2 2 4 17.8

FB2 Bottom 16 3.95 3 2 6 23.7

FB3 Top 16 11.755 2 2 4 47.02


FB3 Bottom 16 11.255 2 2 4 45.02

FB3 Negative 14 5.3 2 2 4 21.2

FB3 Negative 14 0.2 2 2 4 8.8

FB3 Negative 14 1.9 2 2 4 7.6

Stirrups

st 1 8 0.9 9 5 45 40.5

st 2 8 1.04 10 1 10 10.4

TB5 Top 14 11.505 3 2 6 69

LOCATION SHAPE dia(ɸ) length no of no of total no DIAMETER OF BARS

(mm) bar member of bar 6 8 10 12 14 16 18 20

TB5 Bottom 12 11.105 3 2 6 66.3 69.03

TB6 Top 14 6.6 2 1 2 13.2

TB6 Top 14 7.4 2 1 2 14.8

TB6 Negative 14 2.6 1 1 1 2.6

TB6 Bottom 12 7.5 3 1 3 22.5

TB6 Bottom 12 5 3 1 3 15

Stirrups

St1 6 0.9 7 7 49 44.1


St2 8 1.09 6 1 6 6.54

Total
length 170 1427 608 828 1229
unit
weight 2.22 3.95
Total
weight 378 5635 0 0 0
Rate analysis sheet for Direct and Indirect cost

MATERIAL COST LABOR COST EQUIPMENT COST

Indexed Type of
Type of Cost per Labor by hourly Hourly equipme Hourly Hourly
material Unit Qty * Rate unit trade No UF cost cost nt NO rental cost

TOTAL TOTAL TOTAL

A. Material unit cost B. Man power unit cost C. Equipment unit cost
Total labor cost 0
hourly output