Checklist of Requirements For Building Permit (Revised)

The document outlines the requirements for obtaining a building permit, which includes clearance from zoning, fire safety, and the Department of Labor and Employment (DOLE). It lists 5 key requirements: 1) zoning clearance which requires signed and sealed plans, specifications, and documents; 2) fire department clearance requiring a fire safety evaluation and signed and sealed plans from licensed engineers; 3) application forms and plans requiring multiple signed and sealed sets of construction documents; 4) local government requirements like materials lists, titles, and analysis signed by professionals; and 5) DOLE clearance involving safety programs, licenses, and training certificates. Compliance with these requirements from various departments is needed before beginning construction.

Uploaded by

shin17111
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
19 views

Checklist of Requirements For Building Permit (Revised)

The document outlines the requirements for obtaining a building permit, which includes clearance from zoning, fire safety, and the Department of Labor and Employment (DOLE). It lists 5 key requirements: 1) zoning clearance which requires signed and sealed plans, specifications, and documents; 2) fire department clearance requiring a fire safety evaluation and signed and sealed plans from licensed engineers; 3) application forms and plans requiring multiple signed and sealed sets of construction documents; 4) local government requirements like materials lists, titles, and analysis signed by professionals; and 5) DOLE clearance involving safety programs, licenses, and training certificates. Compliance with these requirements from various departments is needed before beginning construction.

Uploaded by

shin17111
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 3

Checklist of Requirements for Building Permit

Before the start of Construction


Title Documents Needed Remarks
1. Zoning Clearance LC Application Form Get from OBO
5 Sets of Plans Done but needs sign & seal
Estimates (Bill of Materials & Construction w/ costs) None and needs sign & seal
Specifications (General Specifications) Done but needs sign & seal
Lot Plan (Not Google Map) Must be signed & sealed by G.E
> signed & sealed by Geodetic Engineer
Vicinity Map (Not Google Map) Must be signed and sealed by G.E
> signed & sealed by Geodetic Engineer
Land Title (Photocopy back-to-back) Done w/ copy
Tax Declaration (updated) (photocopy) Needs updated copy
Latest Tax Receipt (photocopy) Needs updated copy
Zoning Fee (O.R)

2. Fire Department FSEC Application Form to be filled up at BFP Office Filled up at BFP Office
Clearance/ Endorsement from OBO (signed Application for building Permit) None
Fire Safety Evaluation Bill of Materials with LABOR COSTS
Clearance (FSEC) > must BE SIGNED & SEALED by the Engineer None and needs sign & seal
> 2 Original copies and 1 photocopy
Specifications (Detailed General or Technical)
> must BE SIGNED & SEALED by the Engineer Done but needs sign & seal
> 1 original copy
Sets of Plans – minimun of 4 sets (1 set original) Done but needs sign & seal
Photocopies of PRC ID
> Civil
> Architect None
> Electrical
> Plumber
> Mechanical
Building Owner’s Valid ID – 1 photocopy
*For Authorized Representative:
> 1 Authorization Letter/SPA/Secretary Certificate with General Information Sheet
(GIS) page 4
> 1 photocopy of Authorized Person’s ID
3. Application Forms & Bldg. Permit Application Form (5 copies) Get from OBO
Plans Electrical Permit Application Form (5 copies) Get from OBO
Plumbing Permit Application Form (5 copies) Get from OBO
Mechanical Permit Application Form (5 copies) Get from OBO
Electronics Permit Application Form (5 copies) Get from OBO
Set of Plans (5 sets)
a. Electrical Plans and specifications
b. Telecommunications plan (Electronics) Done but need to be signed and sealed by specific
c. Mechanical Plan engineers with attachment of updated PTR and PRC ID of
d. Construction Specifications (6 copies) signatory
e. Structural Analysis
f. Plumbing

4. Document Bill of Materials Done but needs sign & seal


Requirements for LGU Specifications Done but needs sign & seal
(Local Government Land Title Done w/ copy
Unit) Tax Declaration Needs updated copy
Tax Receipt Needs updated copy
Lot Plan Must be signed & sealed by G.E
Deed of Sale/ Contract of Lease Done
Structural Analysis Done but needs sign & seal
Electrical Design Analysis Done but needs sign & seal
Electronics design including instrumentation, communication, cctv, smoke detector,
layout
DENR Clearance (ECC/CNC) None

5. DOLE Clearance Letter of Intent None


Application form (2 copies)
Construction Safety and Health Program Safety Officer
Registry of Establishment (rule 1020 online registration)
PCAB License EPC (Main Contractor)
Notice of Award (NOA)/ Notice to Proceed (NTP)/ Contract
Safety Officer Certificate (refer to D.O 198 series of 2018)
Occupational Health Personnel (refer to D.O 198 series of 2018)
Certificate of Inspection and Testing of Construction Heavy Equipment (CHE) (if
applicable) Safety Officer
Skills Certificate of Construction Heavy Equipment Operators issued by TESDA
Note: All requirements submitted must be 1 original and 2 photocopies