100% found this document useful (1 vote)
51 views

Incoming Material Testing Form

The document provides information about testing procedures for incoming materials at a company. It outlines steps for purchasing, quality control, and production teams to test materials and determine if they can be used, including: 1) Sending material samples from purchasing to the lab team for testing within 3 days. 2) The lab team sends results to QC, who must confirm within 24 hours. 3) If tests pass, purchasing notifies production that material can be used. If it fails, purchasing notifies the supplier and the material cannot be used. After receiving results, the CE team sends a report to purchasing. Charts and tables show material information, test plans and results.

Uploaded by

satrfiabagus
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
51 views

Incoming Material Testing Form

The document provides information about testing procedures for incoming materials at a company. It outlines steps for purchasing, quality control, and production teams to test materials and determine if they can be used, including: 1) Sending material samples from purchasing to the lab team for testing within 3 days. 2) The lab team sends results to QC, who must confirm within 24 hours. 3) If tests pass, purchasing notifies production that material can be used. If it fails, purchasing notifies the supplier and the material cannot be used. After receiving results, the CE team sends a report to purchasing. Charts and tables show material information, test plans and results.

Uploaded by

satrfiabagus
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 13

Send the slab result of the

incoming material to LAB tea

Purchasing team provide CE


Conduct testing for incoming
team with new material arrival
material/pigment by CE team
information

Send the slab result of the


incoming material (pigment)
QC
Maximum testing for 3 days
Send the slab result of the
Get result from LAB team
incoming material to LAB team

Send the slab result of the QC confirm within 1x24 hours


incoming material (pigment) to Get result from QC
QC
If test result PASS, purchasing
team will inform the
production team that the
material can be used
After get the result from
LAB/QC team, CE team will
send the result of report to
purchasing team
If test result FAIL, purchasing
team will notify the supplier,
and material can't be used in
production
Date Finish Test From
Delivery Date to LAB LAB
Arrival Date Test Date
No Tanggal Pengiriman Tanggal Selesai
Tanggal Kedatangan Tanggal Pengetesan
ke LAB Pengetesan Dari LAB

2
7/19/2022
3

4 8/9/2022

5 7/28/2022

6
8/8/2022
7
Incoming Material Testing
Pengetesan Material Yang Baru Masuk

Rheometer Test Result


Chemical Name Hasil Tes Rheometer
QTY (kg) MCS
Nama Bahah Kimia

T10

BR0150 Synthetic Rubber 33600

RHENOFIT 1987/A Accelerator 1800

LOWINOX CPL Antioxidant 150

G34 Wax 100 OGRS 001

P3965F 4205

SBO-60 100

R60 320
Rheometer Test Result
Hasil Tes Rheometer Lab Test Result Remark Suplier Name
Hasil Tes Lab Komentar Nama Suplier

T90

OIA GLOBAL

SYMTAKE CHEMICAL

OIA GLOBAL

UNITRADE ENTERPRISES
Rheometer Spec ogrs 001 & 005

LOT No T10 T90

Min 94 166

1020513A31
Max 116 204
1020513A32
31114631
31114632

WCPIE0006

208607

LW20217S01

KT225311

KT925021
PIGMENT TEST REPORT
Arrival date: Test date: No Lot: Material name:

A. Test Item
Color item before degreaser : OK Fail
Color item after degreaser : OK Fail

B. Sample Test

Sample from production Sample test before Sample test after


degreaser degreaser

C. Test result confirmation

OK, can be used Return

Confirmed by QC: Checked by CE & production: Test by CE:


MATERIAL TEST REPORT
Arrival date: Test date: No Lot: Material name:

A. Test Item
Physical properties : OK Fail
Material color checking : OK Fail
Material shape checking : OK Fail

B. Sample Test

Old material sample New material sample

C. Test result confirmation

OK, can be used Return

Confirmed by Lab: Checked by CE & production: Test by CE:

You might also like