ABSTRACT
Facility Management (FM) is well known for its interdisciplinary knowledge and along with the growing
number of green buildings and low-carbon buildings, the FM system become increasingly complex. Many
practitioners consider Building Information Modeling (BIM) as the most important technology to bring about
improvements. The purpose of this paper is to develop a BIM-enabled FM system which integrates FM,
BIM and building management system to improve information sharing and monitoring, FM system control,
and equipment management. A case study is implemented to validate the feasibility of the BIM-enabled FM
system. Four functionalities are demonstrated in detail: Equipment Information Monitoring (EIM), Dynamic
Data Display and Warning (D3W), Energy-Saving Analysis (ESA), and Intelligent Fire Escape Route (IFER).
The results show that BIM-enabled FM system facilitates the FM more accurate, timely, safe and efficient.
Keywords: Building Information Modeling (BIM), Complex Building, Dynamic Data Display and Warning
(D3W), Equipment Information Monitoring (EIM), Facility Management (FM), Intelligent
Fire Escape Route (IFER)
DOI: 10.4018/ij3dim.2013070102
Copyright © 2013, IGI Global. Copying or distributing in print or electronic forms without written permission of IGI Global is prohibited.
International Journal of 3-D Information Modeling, 2(3), 16-33, 2013 2013 17
systems are independent. With more different Meng and Minogue 2011), End-user require-
FM subsystems having been developed and ments for green FM (Nousiainen and7 Junnila
deployed, the training cost increases appar- 2008), and improvement for FM (Lennerts et
ently as all trainees may need to understand al., 2005; Leung et al., 2005; Pennanen et al.,
relevant operational methods of different sys- 2005; Lavy 2008). Some IT technologies has
tems in terms of system-based maintenance. been applied to improve FM. Bae et al. (2013)
Meanwhile, owing to the increasing number of presented a new vision-based mobile augmented
software platforms, the management of the FM reality system that allowed field personnel
system is indeed imperative. In addition, it is to query and access 3D cyber-information
envisaged that the comprehensive data analysis on-site by using photographs taken from stan-
may become hard to realize. dard mobile devices. The user’s location and
Building information modeling (BIM) orientation were purely derived by comparing
is “a new approach to design, construction, images from the user’s mobile device to a 3D
and facilities management, in which a digital point cloud model generated from a set of pre-
representation of the building process is used collected site photographs. Mhalas et al. (2013)
to facilitate the exchange and interoperability presented a methodology that integrated these
of information in digital format” (Eastman et energy databases with visualization systems and
al., 2011). In China, there is a growing interest multi-criteria decision analyses to enable the
of adopting BIM to improve FM in Operation evaluation of the environmental and financial
& Maintenance (O&M) stage. The purpose of implications of various energy efficiency and
this paper is to develop a BIM-enabled FM renewable energy interventions at both building
system which integrates FM, BIM and building and neighborhood levels. In order to improve
management system to improve information maintenance crews’ productivity, Augmented
sharing and monitoring, FM system control, Reality (AR) is engaged in FM, such as facili-
and equipment management. A case study is tating piping assembly (Hou and7 Wang 2011;
implemented to validate the feasibility of the Hou et al., 2013; Hou et al., 2013), assistant
BIM-enabled FM system. Four functionalities view for 2D drawings (Wang and7 Dunston
are demonstrated in detail: Equipment Informa- 2006; Wang and7 Dunston 2013), work process
tion Monitoring (EIM), Dynamic Data Display visualization (Henderson and7 Feiner, 2011;
and Warning (D3W), Energy-Saving Analysis Lee and7 Akin, 2011; Dong and7 Kamat, 2013;
(ESA), and Intelligent Fire Escape Route Golparvar-Fard and7 Ham, 2013), and main-
(IFER). The results show that BIM-enabled tenance information accessing (Irizarry et al.,
FM system facilitates the FM more accurate, 2013). As-built building information, including
timely, safe and efficient. building geometry and features, is useful in FM.
However, the current process for capturing,
retrieving, and modeling such information is
RELATED WORKS labor-intensive and time-consuming. Zhu and
Donia (2013) had investigated the potentials of
This section presents an up-to-date review of
fusing visual and spatial data for automatically
FM and BIM research in building industry.
capturing, retrieving, and modeling as-built
Facility Management building geometry and features.
Copyright © 2013, IGI Global. Copying or distributing in print or electronic forms without written permission of IGI Global is prohibited.
18 International Journal of 3-D Information Modeling, 2(3), 16-33, 2013 2013
Copyright © 2013, IGI Global. Copying or distributing in print or electronic forms without written permission of IGI Global is prohibited.
International Journal of 3-D Information Modeling, 2(3), 16-33, 2013 2013 19
Copyright © 2013, IGI Global. Copying or distributing in print or electronic forms without written permission of IGI Global is prohibited.
20 International Journal of 3-D Information Modeling, 2(3), 16-33, 2013 2013
network development has made significant efficiency, but also reduces development and
progress towards database technology. This kind operation risks. The reasons are as follows:
of mature technology as the underlying basis
of BIM data management, not only improves 1. Microsoft SQL Server2005 database is
the BIM-enabled FM system reliability and adopted to store data because it’s mature.
Copyright © 2013, IGI Global. Copying or distributing in print or electronic forms without written permission of IGI Global is prohibited.
International Journal of 3-D Information Modeling, 2(3), 16-33, 2013 2013 21
Copyright © 2013, IGI Global. Copying or distributing in print or electronic forms without written permission of IGI Global is prohibited.
22 International Journal of 3-D Information Modeling, 2(3), 16-33, 2013 2013
Copyright © 2013, IGI Global. Copying or distributing in print or electronic forms without written permission of IGI Global is prohibited.
International Journal of 3-D Information Modeling, 2(3), 16-33, 2013 2013 23
each area view, it can clearly know whether the FE), Air Conditioning and Fresh Air System
systems and the equipment within this area are (ACFAS), K(X)-1 Fresh Air System (KFAS),
working properly. Through the development of TEF-RF-1system, Basement Fresh Air System
auxiliary functions such as translation, zooming (BFAS), BFAS without Processing (BFASP),
and roaming, user can find any equipment fast Basement Ventilation System (BVS), Water
and conveniently. Meanwhile, user can also read Cooling System (WCS) and Water Freezing
its physical parameters and real-time running System (WFS).
parameters so that timely grasping the working Furthermore, the 15 systems are subdivided
state of the equipment. The working interface respectively according to important equipment
is shown in Figure 6. such as fan and pump. WSDS is divided into
In order to conveniently monitor the 20 subsystems including B1 diving pump water
running status of different building systems, supply, B1 sewage water pump, B1 rain, B1
the subsystem view mainly divides building frequency conversion water supply, wastewa-
systems according to Mechanical Electrical ter and its stand pipe, frequency conversion
and Plumbing (MEP) system. As shown in water supply and so on. VRVACS is divided
Figure 7, building systems in the BIM-enabled into 33 subsystems according to its outdoor
FM system are divided into 15 large systems: units including W-3F-8, W-3F-7, W-3F-6 and
Water Supply and Drainage System (WSDS), so on. MSES is divided into 36 subsystems
Vacuum Reducer Valve Air Conditioning according to smoke exhaust fan including
System (VRVACS) and Mechanical Smoke SEF-RF-1-1F, SEF-RF-1-2F, SEF-RF-1-3F
Extraction System (MSES), Mechanical Pressed and so on. MPASS is divided into 5 subsystems
Air Supply System (MPASS), Urgent Exhaust including SPF-RF-1-1F, SPF-RF-1-2F, SPF-
System (UES), Exhaust System After Gas Fire RF-1-3F, SPF-RF-1-4F and SPF-RF-1-RF. UES
Extinguishing (ESAGFE), Normal Exhaust is divided into EAF-BF-14 and EAF-BF-15.
System and Part-time ESAGFE (NESPESAG- ESAGFE is divided into 4 subsystems includ-
Copyright © 2013, IGI Global. Copying or distributing in print or electronic forms without written permission of IGI Global is prohibited.
24 International Journal of 3-D Information Modeling, 2(3), 16-33, 2013 2013
Copyright © 2013, IGI Global. Copying or distributing in print or electronic forms without written permission of IGI Global is prohibited.
International Journal of 3-D Information Modeling, 2(3), 16-33, 2013 2013 25
ing EAF-BF-12, EAF-BF-13, EAF-BF-16 and system. Whilst, on the right side of the system,
EAF-BF-18. NESPESAGFE is divided into user can see the system name, system type,
20 subsystems including EAF-RF-1-1F, EAF- the new air/water flow, moisture content,
RF-1-2F, EAF-RF-2-1F and so on. ACFAS is temperature, service areas and other informa-
divided into 16 subsystems including DPAU- tion. With these kinds of information, facility
RF-1-1F, DPAU-RF-1-2F, DPAU-RF-2-1F manager can timely and accurately judge the
and so on. KFAS is divided into 5 subsystems system running status and working status. The
including K(X)-1-1F, K(X)-1-2F, K(X)-1-3F, running interface of BIM-enabled FM system
K(X)-1-4F and K(X)-1-RF. TEF-RF-1 system is shown in Figure 8.
is divided into 5 subsystems including TEF-RF- Equipment selection function facilitates
1-1F, TEF-RF-1-2F, TEF-RF-1-3F, TEF-RF-1- the supervision of O&M reach the high de-
4F and TEF-RF-1-RF. BFAS is divided into 4 tailed level. User can find equipment through
subsystems including PAU-BF-1, PAU-BF-2, zone view, system view and equipment query
PAU-BF-3 and PAU-BF-4. BFASP is divided function. Properties of each selected equip-
into 8 subsystems including FAF-BF-1, FAF- ment will be shown in the property box, which
BF-2, FAF-BF-3 and so on. BVS is divided contains equipment manufacturer, type, floor,
into 10 subsystems including EAF-BF-1, EAF- maintenance time, maintenance cycle, real-time
BF-2, EAF-BF-4 and so on; WCS and WFS operating parameters, physical parameters,
are independent system without subsystems. equipment running status, location of control
In this way, there are 15 large systems and 170 switches and so on. Most of the basic parameters
subsystems in the BIM-enabled FM system of derived from the real-time monitoring system,
Shanghai Disaster Control Center. which can acquire the real-time operating
In the BIM model processing, 15 large information. Experienced operation managers
systems and 170 subsystems show indepen- can be aware of the potential problems from
dently. When any system is selected, all piping, the real-time information, and take precau-
valves, equipment, etc. will display directly tions to make sure system running correctly.
in the main interface of the BIM-enabled FM Figure 9 is screenshot of property query of the
Copyright © 2013, IGI Global. Copying or distributing in print or electronic forms without written permission of IGI Global is prohibited.
26 International Journal of 3-D Information Modeling, 2(3), 16-33, 2013 2013
frozen water pump, it is easy for maintenance This sight is from the spatial location, it can
personnel to browse and real-time roam in the prevent from the influence that we can’t find
3D model. Moreover, user can view equipment the direction. The checked switch cubicle is
or building systems more clearly by changing highlighted, differing from other facilities ap-
the display mode. parently. The right attribute column shows the
relative information, such as the number, the
Dynamic Data Display and Warning name, the type, the current floor and room, the
date when bought and maintained, the mainte-
Data’s dynamic display and warning includes nance cycle, the information of the switch, the
searching facility information, identifying belonged line, the actual three-phase current,
dynamic facility locations, displaying main- the three-phase voltage values, the P value and
tenance routes, recording daily maintenance Q value, etc. With these information, worker
work and warning breakdown information of for operation and maintenance not only can
equipment. As shown in Figure 10, people can judge the operation state of the switch cubicle
search equipment information by inputting type, rapidly and directly, but also find the accurate
number, name or buy date, and then check the location, check the maintenance records and
attributes of the equipment in detail, such as check whether it is needed to maintenance.
maintenance routes, records and historical data. When choosing any facility and click the
When choosing any facility and click view maintenance button, the system will operate to
button, people can find relevant facilities in match the corresponding maintenance routes in
the BIM model and see attributes and current red. These routes were typed into the backstage
time operation situations of the facilities listed data base in advance. Servicemen can refer to or
in the attribution listing. Figure 11 shows the print the routes and find the facilities’ location
3D model and dynamic data information of by the routes, which bring much convenience.
the previous checked switch cubicle. The sight Another important function is facility alarm.
in the view is imitated by the real eye sight.
Copyright © 2013, IGI Global. Copying or distributing in print or electronic forms without written permission of IGI Global is prohibited.
International Journal of 3-D Information Modeling, 2(3), 16-33, 2013 2013 27
Figure 11. 3D model and dynamic data information of the previous checked switch cubicle
Copyright © 2013, IGI Global. Copying or distributing in print or electronic forms without written permission of IGI Global is prohibited.
28 International Journal of 3-D Information Modeling, 2(3), 16-33, 2013 2013
When facilities break down, BIM-enabled FM research group intends to automatically count
system will get the fault message by the hard- and record the daily data of electric energy
ware and alarm in time. On the alarm interface, and water consumption of each MEP system
people can find the basic information (e.g. the in backend database. After that, the system
current floor, the current room and numbers), could draw curves of electric energy and water
which will help workers find the corresponding consumption in more detail or output data in the
facilities quickly. Besides, BIM-enabled FM form of statements for the manager’s reference
system will automatically connect the mainte- and analysis.
nance database and come up with the relative It is the foundation of BIM application that
plans. If the solution for this problematic pump collecting and analyzing the data mentioned
cannot be found, the information about the above. Being a developing and innovative
manufacturer will be showed. technology, the application of BIM would be
extended to the whole life-cycle of buildings
Energy Saving Analysis in the future. The original motivations of de-
veloping the function of energy-saving analysis
Energy saving analysis is one of the features of are as follows:
BIM-enabled FM system. The platform collects,
tabulates and saves data of energy consumption,
1. Shanghai Disaster Control Center is in
which mainly includes daily consumption of
charge of researching and improving tech-
electric energy and water, and then these data
nical management ability on project plan-
could be plotted to form a curve. Figure 12
ning, construction and operation stages.
shows the cooling-load curve.
The work of collecting, tabulating and
In the preliminary research, the BIM-
analyzing the data of energy consumption
enabled FM system has realized the combination
could give an important support to further
of Electric Energy Acquisition System (EEAS)
research.
and BA system. In the following work, the
Copyright © 2013, IGI Global. Copying or distributing in print or electronic forms without written permission of IGI Global is prohibited.
International Journal of 3-D Information Modeling, 2(3), 16-33, 2013 2013 29
2. From the curves of daily, monthly and 2. Reasonable and Friendly Management
yearly energy consumption, maintenance Interface: As there are no related mold-
staff can directly identify the peaks and ing products in the market at present, the
troughs. When integrating the data, main- interface of intelligent management plat-
tenance manager can make an accurate form requires an independent design and
energy supply plan, so as to maximize the development. Using the reasonable and
utilization of energy. friendly management interface saves the
3. The adoption of BIM processes and tech- training time for managers and operators,
nologies is a major trend that has been gath- decrease the difficulty for use, and provide
ering steam over the last decade motivated the necessary and seasonable information
by the need for better outcomes. Integrating for the managers and operators efficiently
BIM and any other new technologies (e.g. in an emergency;
sensor, cloud computing and mobile com- 3. Integration of the Platform of Fire
puting)into FM system is good for building Alarm System and Intelligent Early
environment sustainable analysis. Warning: The fire alarm system data of
the Disaster Control Center Disaster needs
Intelligent Fire Escape Route to be integrated in the project research, and
demonstrated through friendly visualiza-
Shanghai Disaster Control Center is one of tion methods, which is convenient for data
the important information systems of the State search, analysis and management in the
Grid Corporation. The safety requirements of process of operations and maintenance.
fire control is very high, coupled with its own As there are not mature products in the
complex equipment system and special space market, a lot of software this part needs
layout, so the team starts to do the targeted should be developed independently; and
research on early warning and real-time escape 4. Escape Route Algorithm and Optimiza-
when the fire breaks out. On the basis of the tion: Escape route is important once a major
BIM model, data for monitoring fire alarm disaster happens, such as the fire, and the
system and gas fire extinguishing system can be escape light is not enough to guide people
extracted, which can be used in the application away from the ignition point effectively.
software platform to automatic computing and And BIM model as the real building simula-
generate real-time escape route. In this way, it tion model has accurate sizes and positions
can improve the emergency response ability of all the emergency exits. Through the
of the Disaster Control Center for the fire, and accurately calculating the data extracted
also can be an effective way of daily fire drill. from the BIM model by computer,the best
In additional, it will record each alarm time and route from the ignition point to outdoor can
the escape routes generated in the database for be got in the shortest time, which means
future reference. the amount of casualties can be reduced
The key and difficult points in this part when the fire occurs.
study are as follows:
BIM-enabled FM system has established
1. Accurate BIM Model: Fire route calcula- the function of data interaction with fire alarm
tion and selection must be based on accu- system (FAS) and gas fire extinguishing system.
rate 3D models and precise and complete When one of them sends out an alarm signal, the
real-time data, therefore the degree of software can display alarm indication marks on
precision of BIM model is important, and the main interface to remind operators to click
its relevance and reliability of the data are and check the dynamic fire escape routes. The
the basis for the running of the platform; system records all possible fire escape routes of
Copyright © 2013, IGI Global. Copying or distributing in print or electronic forms without written permission of IGI Global is prohibited.
30 International Journal of 3-D Information Modeling, 2(3), 16-33, 2013 2013
each floor. Figure 13 shows the fire escape routes USER FEEDBACKS
of the first floor under normal circumstances.
When the system receives the fire signal, the A number of interviews were made with the
program will automatically locate the position of project participants to collect feedback on uti-
the fire, and mark the location with bold flame lizing BIM-enabled FM system in O&M stage.
pattern on the interface. At the same time, it can Questions were asked in the areas of system
automatically calculate the safe escape route prototype functionality and benefits on FM.
according to the location, with the blue arrow The overall feedback was on the positive side.
labeled. When the program receives multiple The project team members thought that the
fire alarm signals at the same time, all alarm most useful functions were Dynamic Data Dis-
points will be marked on the interface, then it play and Warning and Energy-Saving Analysis.
calculates the escape routes. When escape from The former could efficiently help maintenance
an area must pass through fire point, program manager get the fault message in time, and guide
will show escape route with red to alert person- field workers find the corresponding facilities
nel (as shown in Figure 14). Operators can view quickly. Furthermore, it could automatically
all floors’ fire escape route through drop-down generate relative maintenance plans. The latter
box in the upper left corner of interface select could automatically collect and analysis energy
when the fire happens. consuming data. Whilst, the daily, monthly
This development work of the platform and yearly energy consumption curves could
is in progress at present, and has made great be created and used to help maintenance staff
progress. Various technical difficulties, such make an accurate energy supply plan, so as to
as integration of fire monitoring system and maximize the utilization of energy.
the BIM system, and real-time escape routes’ The drawbacks of the BIM-enabled FM
calculation have been basically solved. The system were manually creating as-built BIM
above-mentioned part is relevant development model and linking FM materials to BIM model.
achievement. These tasks were time-consuming and labor-
intensive.
Figure 13. The fire escape routes of the first floor under normal circumstances
Copyright © 2013, IGI Global. Copying or distributing in print or electronic forms without written permission of IGI Global is prohibited.
International Journal of 3-D Information Modeling, 2(3), 16-33, 2013 2013 31
CONCLUSION REFERENCES
The traditional practice of conducting FM Akcamete, A., Akinci, B., & Garrett, J. (2010). Po-
activities is time-consuming and tedious, as tential utilization of building information models for
FM managers are normally using index sheets planning maintenance activities. In Proc., Proced-
dings of the International Conference on Computing
with a mass of drawings in the site to look at in Civil and Building Engineering.
a specific detail. In the project of Shanghai
Disaster Control Center, the main goal of BIM Arayici, Y., Onyenobi, T., & Egbu, C. (2012).
Building information modelling (BIM) for facili-
application in FM is to grope for and sum up
ties management (FM): The MediaCity case study
a set of intelligent management solutions so approach. International Journal of 3D Information
as to improve maintenance productivity. This Modelling, 1(1), 55-73.
paper develop a BIM-enabled FM system which
Bae, H., Golparvar-Fard, M., & White, J. (2013).
integrates FM, BIM and building management High-precision vision-based mobile augmented
system to improve information sharing and reality system for context-aware architectural, engi-
monitoring, FM system control, and equipment neering, construction and facility management (AEC/
management. A case study is implemented to FM) applications. Visualization in Engineering, 1(1),
validate the feasibility of the BIM-enabled FM 1–13. doi:10.1186/2213-7459-1-3
system. Four functionalities are demonstrated Becerik-Gerber, B., Jazizadeh, F., Li, N., & Calis,
in detail: Equipment Information Monitoring, G. (2012). Application areas and data requirements
Dynamic Data Display and Warning, Energy- for BIM-enabled facilities management. Journal
Saving Analysis, and Intelligent Fire Escape of Construction Engineering and Management,
138(3), 431–442. doi:10.1061/(ASCE)CO.1943-
Route. The operation condition of the platform 7862.0000433
and data accumulation can provide important
basic data and decision-making support for Cardellino, P., & Finch, E. (2006). Evidence of
systematic approaches to innovation in facilities
next similar project. Whilst, it may bring new management. Journal of Facilities Management,
solutions and ideas on how to make use of ad- 4(3), 150–166. doi:10.1108/14725960610673742
vanced information technology and scientific
management means in O&M in the future.
Copyright © 2013, IGI Global. Copying or distributing in print or electronic forms without written permission of IGI Global is prohibited.
32 International Journal of 3-D Information Modeling, 2(3), 16-33, 2013 2013
Chen, H.-T., Wu, S.-W., & Hsieh, S.-H. (2013). Hou, L., & Wang, X. (2011). Experimental frame-
Visualization of CCTV coverage in public build- work for evaluating cognitive workload of using AR
ing space using BIM technology. Visualization in system for general assembly task. In Proceedings of
Engineering, 1(1), 1–17. doi:10.1186/2213-7459-1-5 the 28th International Symposium on Automation
and Robotics in Construction.
Cheng Shuang Sun, Q. C. (2012). BIM-based
real-time monitoring of the equipment maintenance Hou, L., Wang, X., Bernold, L., & Love, P. E. (2013).
of property. Applied Mechanics and Materials, Using animated augmented reality to cognitively
226-228(Vibration, Structural Engineering and guide assembly. Journal of Computing in Civil En-
Measurement II), 2217-2221. gineering, 27(5), 439–451. doi:10.1061/(ASCE)
CP.1943-5487.0000184
Clevenger, C., Glick, S., & del Puerto, C. L. (2012).
Interoperable learning leveraging building informa- Hou, L., Wang, X., & Truijens, M. (2013). Using
tion modeling (BIM) in construction education. augmented reality to facilitate piping assembly: An
International Journal of Construction Education experiment-based evaluation. Journal of Computing
and Research, 8(2), 101–118. doi:10.1080/155787 in Civil Engineering, 0.
71.2011.647249
IFMA. (n.d.). Retrieved from http://www.ifma.org
Cotts, D., Roper, K. O., & Payant, R. P. (2009). The
facility management handbook. New York, NY: Irizarry, J., Gheisari, M., Williams, G., & Walker,
AMACOM. B. N. (2013). InfoSPOT: A mobile augmented
reality method for accessing building information
De Toni, A. F., Fornasier, A., Montagner, M., & through a situation awareness approach. Automa-
Nonino, F. (2007). A performance measurement tion in Construction, 33, 11–23. doi:10.1016/j.
system for facility management: The case study of autcon.2012.09.002
a medical service authority. International Journal of
Productivity and Performance Management, 56(5/6), Lavy, S. (2008). Facility management practices
417–435. doi:10.1108/17410400710757123 in higher education buildings: A case study. Jour-
nal of Facilities Management, 6(4), 303–315.
Dong, S., & Kamat, V. R. (2013). SMART: Scal- doi:10.1108/14725960810908163
able and modular augmented reality template for
rapid development of engineering visualization Lee, S., & Akin, Ö. (2011). Augmented reality-based
applications. Visualization in Engineering, 1(1), 1. computational fieldwork support for equipment oper-
doi:10.1186/2213-7459-1-1 ations and maintenance. Automation in Construction,
20(4), 338–352. doi:10.1016/j.autcon.2010.11.004
Eastman, C., Teicholz, P., Sacks, R., & Liston, K.
(2011). BIM handbook: A guide to building infor- Lennerts, K., Abel, J., Pfründer, U., & Sharma, V.
mation modeling for owners, managers, designers, (2005). Step-by-step process analysis for hospital
engineers and contractors. Wiley. com. facility management: An insight into the OPIK
research project. Facilities, 23(3/4), 164–175.
Ergen, E., Akinci, B., & Sacks, R. (2007). Life-cycle doi:10.1108/02632770510578539
data management of engineered-to-order components
using radio frequency identification. Advanced Engi- Leung, M.-Y., Lu, X., & Ip, H.-Y. (2005). Investigat-
neering Informatics, 21(4), 356–366. doi:10.1016/j. ing key components of the facility management of
aei.2006.09.004 secondary schools in Hong Kong. Facilities, 23(5/6),
226–238. doi:10.1108/02632770510588637
Golparvar-Fard, M., & Ham, Y. (2013). Automated
diagnostics and visualization of potential energy Liu, R., & Issa, R. R. A. (2012). Automatically updat-
performance problems in existing buildings using ing maintenance information from a BIM database.
EPAR-energy performance augmented reality-mod- Computing in Civil Engineering, 373-380.
els. Journal of Computing in Civil Engineering, 0. Madritsch, T., & May, M. (2009). Suc-
Henderson, S., & Feiner, S. (2011). Exploring the cessful IT implementation in facility man-
benefits of augmented reality documentation for agement. Facilities, 27(11/12), 429–444.
maintenance and repair. Visualization and Computer doi:10.1108/02632770910980727
Graphics. IEEE Transactions on, 17(10), 1355–1368.
Copyright © 2013, IGI Global. Copying or distributing in print or electronic forms without written permission of IGI Global is prohibited.
International Journal of 3-D Information Modeling, 2(3), 16-33, 2013 2013 33
Meng, X., & Minogue, M. (2011). Performance Siu, M.-F. F., Lu, M., & AbouRizk, S. (2013). Com-
measurement models in facility management: a bining photogrammetry and robotic total stations
comparative study. Facilities, 29(11/12), 472–484. to obtain dimensional measurements of temporary
doi:10.1108/02632771111157141 facilities in construction field. Visualization in En-
gineering, 1(1), 1–15. doi:10.1186/2213-7459-1-4
Mhalas, A., Kassem, M., Crosbie, T., & Dawood, N.
(2013). A visual energy performance assessment and Taneja, S., Akcamete, A., Akinci, B., Garrett, J., Soi-
decision support tool for dwellings. Visualization in belman, L., & East, E. W. (2010). Analysis of three
Engineering, 1(1), 1–13. doi:10.1186/2213-7459-1-7 indoor localization technologies to support facility
management field activities. In Proceedings of the
Motamedi, A, H. A. (2009). Lifecycle management International Conference on Computing in Civil and
of facilities components using radio frequency iden- Building Engineering, Nottingham, UK.
tification and building information model. ITcon,
14(Special Issue “Next Generation Construction IT: Teicholz, P. (2013). BIM for facility managers.
Technology Foresight, Future Studies, Roadmapping, Wiley. com.
and Scenario Planning”), 238-262.
Wang, X., & Dunston, P. (2006). Potential of
Mudrak, T., van Wagenberg, A., & Wubben, E. augmented reality as an assistant viewer for
(2005). Innovation process and innovativeness computer-aided drawing. Journal of Computing in
of facility management organizations. Facilities, Civil Engineering, 20(6), 437–441. doi:10.1061/
23(3/4), 103–118. doi:10.1108/02632770510578485 (ASCE)0887-3801(2006)20:6(437)
Nousiainen, M., & Junnila, S. (2008). End-user Wang, X., & Dunston, P. S. (2013). Tangible mixed
requirements for green facility management. Jour- reality for remote design review: A study understand-
nal of Facilities Management, 6(4), 266–278. ing user perception and acceptance. Visualization in
doi:10.1108/14725960810908136 Engineering, 1(1), 1–15. doi:10.1186/2213-7459-1-8
Park, J., Kim, B., Kim, C., & Kim, H. (2011). 3D/4D Wang, Y., Wang, X., Wang, J., Yung, P., & Jun,
CAD applicability for life-cycle facility manage- G. (2013). Engagement of facilities manage-
ment. Journal of Computing in Civil Engineering, ment in design stage through BIM: Framework
25(2), 129–138. doi:10.1061/(ASCE)CP.1943- and a case study. Advances in Civil Engineering.
5487.0000067 doi:10.1155/2013/189105
Pennanen, A., Whelton, M., & Ballard, G. (2005). Wu, W., & Issa, R. R. A. (2012). BIM-enabled
Managing stakeholder expectations in facility man- building commissioning and handover. Computing
agement using workplace planning and commitment in Civil Engineering, 2012, 237–244.
making techniques. Facilities, 23(13/14), 542–557.
doi:10.1108/02632770510627534 Yongbo Shao, S. H., Luo, Y., Xing, J., & Liu, Z.
(2012). Research on the application of BIM in the
Russell, D., Cho, Y., & Cylwik, E. (n.d.). Learning operation stage of green building. Applied Mechanics
opportunities and career implications of experience and Materials, 174-177(Advanced Building Materi-
with building information modeling/virtual design als and Sustainable Architecture): 2111-2114.
and construction. Practice Periodical on Structural
Design and Construction, 0. Young, N., Jones, S., Bernstein, H. M., & Gudgel, J.
(2009). The business value of BIM-getting building
Sharma, V., Abel, J., Al-Hussein, M., Lennerts, K., information modeling to the bottom line. Bedford,
& Pfründer, U. (2007). Simulation application for MA: McGraw-Hill Construction.
resource allocation in facility management pro-
cesses in hospitals. Facilities, 25(13/14), 493–506. Yu, K., Froese, T., & Grobler, F. (2000). A devel-
doi:10.1108/02632770710822599 opment framework for data models for computer-
integrated facilities management. Automation in
Shen, W., Hao, Q., Mak, H., Neelamkavil, J., Xie, Construction, 9(2), 145–167. doi:10.1016/S0926-
H., & Dickinson, J. et al. (2010). Systems integra- 5805(99)00002-3
tion and collaboration in architecture, engineering,
construction, and facilities management: A review. Zhu, Z., & Donia, S. (2013). Spatial and visual data
Advanced Engineering Informatics, 24(2), 196–207. fusion for capturing, retrieval, and modeling of as-
doi:10.1016/j.aei.2009.09.001 built building geometry and features. Visualization in
Engineering, 1(1), 10. doi:10.1186/2213-7459-1-10
Copyright © 2013, IGI Global. Copying or distributing in print or electronic forms without written permission of IGI Global is prohibited.