Elimination 1
some time
Unlikely
times
Severity (S) Substitution /Reduction at source 2
OHSAS 45001 : Occu. Health & Safety ISO 14001: Environmental Impact (Scale, Severity & Duration of Impact) 1 2 3 4 Engineering Controls/ Conservation/Reuse/Recycle/Treatment 3
Low
Low Low
Minor environmental incident (leakage, spillage, waste of resource etc.) within the workplace & not lasting for more than 1 shift. Or, conservation of natural (Acceptable Medium (Acceptable
First Aid Case/temp Illness/Near Miss Incident of less severe in nature 1 (Acceptable & Non-
& Non-
(Acceptable &
& Significant)
Admin Controls (Training/Supervision/Guidelines/procedures/PTW/signage's/posters/ etc.) 4
resources (water/fuel/electricity etc.) or, business opportunity through waste/scrap/conservation. significant) Non-significant)
significant)
Reportable / Loss Time Injury/major fire with injury/Near Miss incident Moderate environmental incident within the workplace/department & not lasting for more than 1 day and /or waste of natural resources as follows (by Medium
Low Medium High
of high severity/legal approvals about to expire in 2 weeks & no action judgment): 1) Water: 1 % of average monthly consumption 2) Diesel/fuel: 0.25 % of avg monthly consumption 3) Electricity: 1 % of monthly energy (Acceptable
2 (Acceptable & Non- (Acceptable & (Not acceptable & Personal Protective Equipment's / Proper segregation/ Secondary containment 5
taken / the measured parameters(or its exposure) are 10 % within the consumption 4) 1 % excess of monthly raw material 5) HW waste or air /water emission or noise very close to permissible limits, or, legal approvals about &
significant) Significant) Significant)
permissible limits. to expire in 2 weeks & no action taken in this regard. Interested parties communication without involvement of legal authorities. Significant)
Reportable environmental incident (fire/major leakage/spillage) within the factory/site. and /or waste of natural resources as follows (by judgment) : Medium
Major / Serious Injuries/Occupational Diseases /legal approvals Low High High
1) Water: 5 % of average monthly consumption 2) Diesel/fuel: 1 % of avg monthly consumption 3) Electricity: 5 % of monthly energy consumption 4) 5 % (Acceptable
expired / the measured parameters (or its exposure) are not complying 3 (Acceptable & Non-
&
(Not acceptable (Not acceptable &
excess of monthly raw material 5) HW waste or air /water emission or noise exceeding than the permissible limits, or, legal approvals expired & no action significant) & Significant) Significant)
with the permissible limits. Significant)
evident. Interested parties communication with involvement of legal authorities.
Fatality / Permanent Disability/ Legal approvals not obtained or Reportable environmental incident (fire/major leakage/spillage) affecting nearby external areas & HW waste/ or air or water emission or noise exceeding High
High High
Medium (Acceptable & (Not
measured parameters not meeting the legal requirements for more than than the permissible limits for continuously for 3 months/cycles or received communication from legal authority on legal non-compliance & actions taken in 4
Significant) acceptable &
(Not acceptable (Not acceptable &
3 months & actions taken in this regard not evident. this regard are not evident. & Significant) Significant)
Significant)
Likelihood
Likelihood
Provide brief if 'Y' Risk/ Significant & Not-acceptable
Env. Aspect / OH&S Hazard Env. Impact / OH&S Risk Risk/Impact
Severity
Severity
Impact
1. Submission of medical examination report/ fitness certificate for all workman prior to deployment at site.
2. Additional medical
record for vertigo /fit for height those for working at height
Page 1 of 11
1 Deployment of manpower (Routine Activity)
SIEMENS
EHS Risk Assessment Assessment
Environment (ISO 14001) & Hazard/Risk (OHSAS 18001)
(No controls) (Residual Risk/Impact)
Activities & Sub-activities [Consider Routine/Normal; Applicable Legal Acceptable & Non-significant;
Controls Measures Control
Sr. No. Non-routine/Abnormal; Emergency activities] requirement (Y/N); Acceptable & Significant;
( Method statement; site specific controls in bullet points & environment procedure (if applicable)) Type
Likelihood
Likelihood
Provide brief if 'Y' Risk/ Significant & Not-acceptable
Env. Aspect / OH&S Hazard Env. Impact / OH&S Risk Risk/Impact
Severity
Severity
Impact
1. Safety induction for all staff/ workers by project EHS Officers support from SRE
2. For all critical and risky activities only qualified and trained manpower to deployed
1.Lack of awareness leading to unsafe act and resulting to an 3.Explanation of identification of Hazard and control measures to workmen through daily tool box talk.
Untrained Manpower,
incident Polices, operations, Inadequate controls. 3 2 6 N Imparting of job /project specific training to all workman at site. 4 3 1 3 Acceptable & Non-Significant
lack of traning and improper documentation
precautions 4) imparting of job/ Project specific Traning has provided to workman
5)Workman should have knowaldge about the siemens 6-golden rule of electrical safety.
1.Use proper personal protective equipment, such as gloves and eye protection
1. cuts from sharp blades and tools 2.Ensure proper ventilation to minimize dust and debris inhalation
2.inhaling dust and debris 3.physical 3. Use sharp, well-maintained tools to minimize the risk of cuts 4. Use
injury from heavy lifting and manual handling proper lifting techniques to minimize the risk of physical injury
4.skin irritation from exposure to joint compound and other 5.Wear gloves and other protective equipment to minimize the risk of cuts and abrasions
materials 6.Follow proper electrical safety procedures when working with electrical components Wear gloves and other
CIVIL WORKS: gypsum partition works ceiling 5.eye injury from exposure to flying particles during sanding. protective equipment to minimize the risk of skin irritation
3 personal injury and cuts 3 3 9 N
thermal insulation AND FR rated doors 6.skin 7.Use proper ventilation to minimize the risk of respiratory issues
irritation or respiratory issues from exposure to paint or texture 8.Wear eye protection to minimize the risk of eye injury from flying particles during sanding.
materials 9.Wear gloves and other protective equipment to minimize the risk of
7. Risk of fire or explosion from improper use and handling of skin irritation from exposure to adhesives
flammable materials. 8. insulation 10.Follow the manufacturer’s instructions and safety precautions when using adhesives
materials can be inhaled or cause skin irritation. 11.Use proper ventilation and storage methods to minimize the risk of fire or explosion use high quality gloves,
facemask and eyewera during thermal insulation
1.Appropriate PPE must be worn by all workers on site & special PPE should be provided for those who are
directly involved in this activity.
2. Site Induction and toolbox talks should be given prior to starting job.
3. The equipment to be used should be inspected and must be safe for use. Materials be properly secured while
being transported and during offloading.
4. Employees shall be educated in keeping out of possible crush of wall or collapse of the excavation.
5. All the underground utility services must be protected and secure.
6. Permit to work system should be followed by all supervisors and engineers.
7. Daily, weekly, and monthly inspection to be done regularly any defect found must be reported immediately.
8. Physical barricade to installed and maintained with entry and exit points.
9. Only personnel involved in the activities are allowed inside the barricaded area.
10. Enforce the use of competent persons only.
11. All hand and power tools must be inspected before use
12. All hand and power tools must be safe for use
13. All type of power tools must be color coded and tagged as safe for use and must be entered in the register.
14. Permit to work system should be in place.
raised flooring and flooring, ramps and steps and 1.fall 2.personal injury 3.property damages 4.cuts and Physical injury, property damage, slip & fall due to improper 15. PPE should be worn by all operators as per the job nature.
4 2 3 6 N
painting abrasation 5.slip trip fall 6.dust . electrocuation access 16. Maintain work area isolated with means of barricade and appropriate signage should be in place.
17. Remind personnel through toolbox talk to observe proper positioning when working
18. All the work should be done under competent supervision.
Page 2 of 11
SIEMENS
EHS Risk Assessment Assessment
Environment (ISO 14001) & Hazard/Risk (OHSAS 18001)
(No controls) (Residual Risk/Impact)
Activities & Sub-activities [Consider Routine/Normal; Applicable Legal Acceptable & Non-significant;
Controls Measures Control
Sr. No. Non-routine/Abnormal; Emergency activities] requirement (Y/N); Acceptable & Significant;
( Method statement; site specific controls in bullet points & environment procedure (if applicable)) Type
Likelihood
Likelihood
Provide brief if 'Y' Risk/ Significant & Not-acceptable
Env. Aspect / OH&S Hazard Env. Impact / OH&S Risk Risk/Impact
Severity
Severity
1. Scaffold training should be given to all workers. Impact
2. Only competent manpower should be engaged for erection and dismantling of scaffold.
3. Full body safety harness must be worn and anchored during erection.
5. Tested tools and tackles should be use. Area to be barricaded & unauthorized entry should be restricted and
Cautionary signage to be displayed.
6. All necessary PPEs(Helmet, gloves/ safety shoes, FBH etc.) must be use while carrying out the job.
Physical injury, property damage
Person Injury
7. Proper stocking of material at work area.
1.Fall of material /fall of workmen 2.collaps of scaffold 8. Scaffold wheel should be locked and green tag must be sticked during the work.
3.incompetent manpower 4.Scaffolding material is not in good 9. Ensure that scaffold should not touch to live electrical cable.
Work at height /Use of mobile scaffold & cage ladder lack of awareness/knowledge of scaffolding work can lead to Y(Local Admin/Siemens
5
( Up to 3m height)
condition like- damaged rusted scaffolding components
incident,
3 3 9
Internal Requirement)
10. 3 3 2 6 Acceptable & Significant
5.scaffold erection was performed on unstable surface, Material should not throw from height to ground floor.
slip & fall due to improper access.
6.Lack of knowledge about scaffolding work
Failure of scaffold while load is higher resulting into fall of
person and material causing major injury
11. After 2meter height use scaffold outrigger.
Toppling of scaffold and fall of person and material causing
12. Mobile Scaffold placed near doorways, walkways, passageways or driveways shall be secured from
major injury
accidental displacement and suitable barricade shall be provided around it.
1. All Portable power Tools should be double insulated and as per Siemens approved makelist.
2. All Portable Power Tools must be checked /inspected and tagged SAFE TO USE by a Licensed Electrician.
3. All Portable Power Tools should be routed throuch a 30 mA RCCB.
4. Mobile Scaffoldin/Working platform must be inspect and tagged SAFE TO USE by a competent
person/Safety Officer.
5. Fullbody harness should be worn and anchored while working at height above 1.8 metre.
1. Power Tools/Electricity.
1. Electricution/Electric burn/Fatality. 6. Sufficent space should be availble between working platform & ceiling for comfortable posture for workers.
2. Unstable Platform.
2. Collapse of platform/bone fractures/fatality. 7. Provide Adequate illumination for good visibility.
3.Improper posture/Unsufficient space between ceiling and
Drilling of supports for Saddles 3. Musculoskeletal disorder/Strain/Sprain. 9. Permit to Work( Work at Height) should be obtained before starting the task of the day.
working platform.
6 to secure conduit to surface , fixing back box and for 4. Poor visibility/Slip & Trip. 3 2 6 N 10. Ensure proper supervision by experienced supervisor. 3 3 1 3 Acceptable & Non-Significant
4. Illumination level.
fixing light fixtures 5. Suffocation/Dizziness. 11. All mandatory PPEs like Safety helmet, safety shoes, dust mask and reflective jacket should be worn at all
5. Poor Ventilation.
6. Damage to lungs. times including job speciific PPE's Like safety glasses, ear plug and cut resistant handgloves.
6. Dust Inhalation.
7. Eye Injury. 12.Electrical work should be done by
7. Entry of foriegn particles in eye.
competent /License holder person only. 13.authorized representatives are only allowed to work
electrical systems
14) follow the 6 golden rule for isolation process.
15) tranined person only work 16.work
permit system to be follwed 17.TBT done before start
the work
1.all employees are Safety inducted before they can work on-site.
2. employees stake the right equipment with them on visits. Check they have been trained and know how to use
it.
3.Keep available, records of hazards on particular sites. Make sure all relevant people are notified.
6.Assess the risks of manual handling before going to the site and look at the materials being used or stored.
7.The lifting area should be barricaded and appropriate signboards to be fixed to warn and avoid unauthorized
entry.
Page 3 of 11
SIEMENS
EHS Risk Assessment Assessment
Environment (ISO 14001) & Hazard/Risk (OHSAS 18001)
(No controls) (Residual Risk/Impact)
Activities & Sub-activities [Consider Routine/Normal; Applicable Legal Acceptable & Non-significant;
Controls Measures Control
Sr. No. Non-routine/Abnormal; Emergency activities] requirement (Y/N); Acceptable & Significant;
( Method statement; site specific controls in bullet points & environment procedure (if applicable)) Type
Likelihood
Likelihood
Provide brief if 'Y' Risk/ Significant & Not-acceptable
Env. Aspect / OH&S Hazard Env. Impact / OH&S Risk Risk/Impact
Severity
Severity
Impact
1. All Portable power Tools should be double insulated and as per Siemens approved makelist.
2. All Portable Power Tools must be checked /inspected and tagged SAFE TO USE by a Licensed Electrician.
1. Electric Hazard. 1. Electrocution or Electric shock.
2. Fall Hazard. 2. Fatality.
3. All Portable Power Tools should be routed throuch a 30 mA RCCB.
3. Noise Hazard. 3. Physical injury.
4. Use of PPE like Safety shoes, reflective jacket, hard hat, Dust Mask, safety glasses, ear plug and cut resistant
10 Drilling and fixing of cable tray supports. 4. Dust inhalation. 4. Damage to ears. 3 2 6 N 3 3 1 3 Acceptable & Non-Significant
hand gloves is must for this activity.
5. Entry of foreign particles in eyes. 5. Damage to lungs.
5. Periodic breaks to be provided to reduce the stress and strains in the muscles due to overhead drilling.
6. Ergonomic Hazard. 6. Eye injury or eye damage.
6. Fixed cable tray support ends should be marked with tape or highlighted to avoid body from hitting against it.
7. Fixed Support 7. Stress strain in muscles.
7.TBT done before starat the
work 8.work permit system to be follwed
1. Mobile Scaffoldin/Working platform must be inspect and tagged SAFE TO USE by a competent
person/Safety Officer.
2. Castor wheels to be locked and out riggers properly placed before accessing the mobile scaffolding.
3. Access to the working platform should be through the internal ladder itself.
1. Fall hazard. 4. At any given point only 2 workers to be allowed to work on a mobile scaffolding.
2. Sharp edges coming in contact of body. 1. Fatality. 5. Fullbody harness should be worn and anchored while working at height above 1.8 metre.
Placing the cable trays/GI conduits on the fixed 3. Ergonomic hazard. 2. Physical injury. 6. Scaffolding test certificates/pictorial SOP shall be available.
11 3 2 6 N 4 3 1 3 Acceptable & Non-Significant
supports and interlocking them. 4. Body parts hitting against overhead fixed services. 3. Cut injury. 7. Only trained person shall erect/dismantle the scaffolding.
4. Stress and strain in muscles. 8. Lenghty cable trays to be lifted by minimum two workers , one worker at the start of the material and one
worker at the end.
9. Weight of the cable tray to be anticipated, at any given point. load lifted should not increase 25 kg/worker.
10. Workers to wear Full body clothing and cut resistant gloves at all times.
11. Periodic breaks to be provided to workers to reduce the stress and strain in muscles.
12. Fixed services and supports shpuld be highlighted with tape or eye catching colour.
Page 4 of 11
SIEMENS
EHS Risk Assessment Assessment
Environment (ISO 14001) & Hazard/Risk (OHSAS 18001)
(No controls) (Residual Risk/Impact)
Activities & Sub-activities [Consider Routine/Normal; Applicable Legal Acceptable & Non-significant;
Controls Measures Control
Sr. No. Non-routine/Abnormal; Emergency activities] requirement (Y/N); Acceptable & Significant;
( Method statement; site specific controls in bullet points & environment procedure (if applicable)) Type
Likelihood
Likelihood
Provide brief if 'Y' Risk/ Significant & Not-acceptable
Env. Aspect / OH&S Hazard Env. Impact / OH&S Risk Risk/Impact
Severity
Severity
Impact
1. All Portable power Tools should be double insulated and as per Siemens approved makelist.
2. All Portable Power Tools must be checked /inspected and tagged SAFE TO USE by a Licensed Electrician.
1. Electric Hazard. 1. Electrocution or Electric shock.
2. Fall hazard. 2. Fatality. 3. All Portable Power Tools should be routed throuch a 30 mA RCCB.
3. Sharp edges coming in contact of body. 3. Physical injury. 4. Raceway to be lifted by two workers at any given point, one at the start of the raceway and one at the end of
Raceway installation and drilling of floor to screw 4. Ergonomic hazard. 4. Cut Injury. raceway.
13 3 2 6 N 3 3 1 3 Acceptable & Non-Significant
joining support of two raceways 5. Noise hazard. 5. Stress and strain in muscles. 5. Workers to wear full body clothing to avoid sharp edges coming in contact of body.
6. Dust hazard. 6. Damage to ears. 6. Training to be provided on Kinetic lifting techniques to all workers involved in this actvity.
7. Slip and Trip hazard. 7. Damage to lungs. 7.Periodic breaks to be provided to avoid stress and strains in muscles.
8. Damage to eyes. 8. Workers to wear safety shoes, hard hat,reflective jacket, safety glasses, ear plugs, dust mask and cut resistant
hand gloves is must for this activty.
9. Installed raceways should be highlighted with caution tape or zebra tape to avoid trip hazard.
1. Mobile Scaffoldin/Working platform must be inspect and tagged SAFE TO USE by a competent
person/Safety Officer.
2. Castor wheels to be locked and out riggers properly placed before accessing the mobile scaffolding.
3. Access to the working platform should be through the internal ladder itself.
4. At any given point only 2 workers to be allowed to work on a mobile scaffolding.
1. Fall from height.
5. Fullbody harness should be worn and anchored while working at height above 1.8 metre.
2. Ergonomic hazard. 1. Fatality.
Pulling of dead cables through raceways and cable 6. Sufficent space should be availble between working platform & ceiling for comfortable posture for workers.
3. Trip Hazard. 2. Physical Injury.
trays using a spring/Gi wire 7. Adequate breaks to be provided to workers to avoid musculoskeletal strains and stress.
14 4. Hand getting pulled back. 3. Stress and strain in muscles. 3 2 6 N 4 3 1 3 Acceptable & Non-Significant
8. Cables should be coiled and stacked properly to avoid Trip hazard. If possible it should be coiled and kety in
5. Sharp edge of cable or GII wire/spring coming in contact of 4. Cut injury.
(Circuit Cabling and point wiring) a bag and highlighted as a trip hazard.
body. 5. Property damage.
9. Cable/wire bare ends to be covered with insulation tape.
6. Cable damage.
10. Workers to be trained for this actvity. Sychronization of this pulling activty to be thought.
11. All mandatory PPEs like Safety helmet, safety shoes, dust mask and reflective jacket should be worn at all
times including job speciific PPE's Like safety glasses, ear plug and cut resistant handgloves.
12. Job specific training shall be given before start of work.
13. Cable damage or insulation damage should be immediately highlighted and cable changed.
1. All Portable power Tools should be double insulated and as per Siemens approved makelist.
2. All Portable Power Tools must be checked /inspected and tagged SAFE TO USE by a Licensed Electrician.
Page 5 of 11
SIEMENS
EHS Risk Assessment Assessment
Environment (ISO 14001) & Hazard/Risk (OHSAS 18001)
(No controls) (Residual Risk/Impact)
Activities & Sub-activities [Consider Routine/Normal; Applicable Legal Acceptable & Non-significant;
Controls Measures Control
Sr. No. Non-routine/Abnormal; Emergency activities] requirement (Y/N); Acceptable & Significant;
( Method statement; site specific controls in bullet points & environment procedure (if applicable)) Type
Likelihood
Likelihood
Provide brief if 'Y' Risk/ Significant & Not-acceptable
Env. Aspect / OH&S Hazard Env. Impact / OH&S Risk Risk/Impact
Severity
Severity
Impact
1.Before the Frana is put into use, it should be checked by an authorized person and all points
to be covered according the checklist
2.Ensure that the ground condition should not be uneaven/descend condition.
3.All safety devices installed in the crane shall be operational /fit and to be ensured by routine
inspections.
4.Using good conditions & suitable lifting appliances for loading & unloading which shall be
inspected and color coded.
5.Ensure that unauthorized person should not be enter at swing radius or suspended load.
1.Tilt of Farana/ Crane, 1.Injury to workmen,
6.Competent operator & signal man to be engaged for proper rigging & lifting of pipes.
2.pinch points, 2.Incompetent operator can lead to incident,
7.Appropriate communication between operator and workmen & supervisor as well..
3.uneaven surface, 3.defectig tools & tackles can lead to failuar of
8.Restrict unauthorized entry to the unloading area by cordoning off.
4.incompetent operator,defective lifting tools & lifting 4.Property damage.
9.The lifting activity shall be carried out in presence of the site engineer & safety officer with
tackles, 5.poor visibility & communication can lead to 3 3 9 3 3 2 6 Acceptable & Significant
experienced and trained rigger
5.Collision with factory vehicle,hit to near by person accident.
10.Ensuring proper access without any obstructions & Tagline to be used.
, 6.Over speeding can cause person injury/property
11.Ensure that farana & all lifting tools and tackles should be in good condition and thier
6.Overloading,poor visibilty,poor communiation & damage
valid TPI report must be available at site.
signal,Overspeeding,
12.Adequate signages should be displayed at work site to improve awareness.
13.All piping material should be stacked at designated area & provide barricades.
BOCW Rules 1998- 14.Ensure that proper signal should be given by banks man to prevent any collision.
Chapter –X-Transport 15.TBT should be conduct about matrial unloading & lifting prior to strart the job.
& Earth Moving 16. Only trained persons shall be deployed.
Equipment’s 17.Lifting plan shall be prepared
Panel Shifting 18. Instruct workers to not carry overload material to avoid back pain or physical injury to
17
workers.
BOCW rules 1998-
Chapter - VII - Lifting
appliances and gear
Exahaustion of Smoke from Farana Air pollution 16.Ensure that vehicle speed limit of siemens premises must be followed by farana operator.
18.All mandatory PPES such as safety helemt,safety shose ,safety gloves must be used by all
engaged workmen.
19.Pollution Under Control certificate issued by Government authorized agencies & the
emission parameters are within specified limit
20. Social distance must be maintained at material handling /storage area , Minimum 5 ft
distance to be maintain between workers.
21. Wash the hands regulalry and before and after handling materials
22.Disinfectant/fumigate theproject project site, material storage yards and common tools
(FBH, lifting tools etc.)
Acceptable & Non-
2 2 4 23. Each workers has to use face shields, rubber gloves, masks while handling materiasl 2 1 2
Significant
24. Masks/Gloves/ has to be disposed in designated bins
25. All workers has to store ppe's in biodegradable bags lablled with names and should get
sanitized
Page 6 of 11
SIEMENS
EHS Risk Assessment Assessment
Environment (ISO 14001) & Hazard/Risk (OHSAS 18001)
(No controls) (Residual Risk/Impact)
Activities & Sub-activities [Consider Routine/Normal; Applicable Legal Acceptable & Non-significant;
Controls Measures Control
Sr. No. Non-routine/Abnormal; Emergency activities] requirement (Y/N); Acceptable & Significant;
( Method statement; site specific controls in bullet points & environment procedure (if applicable)) Type
Likelihood
Likelihood
Provide brief if 'Y' Risk/ Significant & Not-acceptable
Env. Aspect / OH&S Hazard Env. Impact / OH&S Risk Risk/Impact
Severity
Severity
Impact
1. All Portable power Tools should be double insulated and as per Siemens approved makelist.
2. All Portable Power Tools must be checked /inspected and tagged SAFE TO USE by a Licensed Electrician.
1. Electrocution or Electric Hazard.
1. Electric hazard.
2. Physical injury.
2. Fall hazard. 3. All Portable Power Tools should be routed throuch a 30 mA RCCB.
19 Switch Socket Installation 3. Cuts on fingers and hand. 3 2 6 N 4 3 1 3 Acceptable & Non-Significant
3. Caught In hazard. 4. Workers to wear PPE's like hard hat, Reflective jacket, safety shoes, nose mask along with job specific PPE's
4. Stress and strain in muscles.
4. Ergonomic Hazard. like Cut resistant hand gloves.
5. No response in case of emergency.
5. Periodic breaks to be provided to relive the stress and strain in muscles.
6. Minimum 2 workers to be working in a room or for any actvity to avoid lone working.
1.Drill Machine & hand tools shall be inspected through competent person , Check for any
damage of cable.
2. Activity shall be carried out under supervision.
3.Drill machine shall be secured with rope while doing tray installation at height.
4. TBT shall be conducted about electrical safety prior to start of work
5. Full body harness must be wear.
6. Person working at height must be medically fit.
7. Use of appropriate PPEs such as nose mask ear pluge & Area shall be barricaded.
8.Work area brricade
1.Loose material fall from height 9 contiues supervison at site
1.Head and body injury
2.Noise/Vibration
2.Cut s and abrasion,
21 Installation of cable tray/Earthing strip 3.Fall of person 3 3 9 N 4 3 2 6 Acceptable & Significant
3.Electrocaution and burn injury
4.Use of faulty drill machine/hand tools
Page 7 of 11
SIEMENS
EHS Risk Assessment Assessment
Environment (ISO 14001) & Hazard/Risk (OHSAS 18001)
(No controls) (Residual Risk/Impact)
Activities & Sub-activities [Consider Routine/Normal; Applicable Legal Acceptable & Non-significant;
Controls Measures Control
Sr. No. Non-routine/Abnormal; Emergency activities] requirement (Y/N); Acceptable & Significant;
( Method statement; site specific controls in bullet points & environment procedure (if applicable)) Type
Likelihood
Likelihood
Provide brief if 'Y' Risk/ Significant & Not-acceptable
Env. Aspect / OH&S Hazard Env. Impact / OH&S Risk Risk/Impact
Severity
Severity
Impact
Page 8 of 11
SIEMENS
EHS Risk Assessment Assessment
Environment (ISO 14001) & Hazard/Risk (OHSAS 18001)
(No controls) (Residual Risk/Impact)
Activities & Sub-activities [Consider Routine/Normal; Applicable Legal Acceptable & Non-significant;
Controls Measures Control
Sr. No. Non-routine/Abnormal; Emergency activities] requirement (Y/N); Acceptable & Significant;
( Method statement; site specific controls in bullet points & environment procedure (if applicable)) Type
Likelihood
Likelihood
Provide brief if 'Y' Risk/ Significant & Not-acceptable
Env. Aspect / OH&S Hazard Env. Impact / OH&S Risk Risk/Impact
Severity
Severity
Impact
1. Insulation failure
2. Short circuit of transformers 1. Only competent and authorized men/licensed electrician are eligible to work/operate
3. Improper Earthing 2. Ensure all testing kits are calibrated
4. Poor Oil quality Physical injury. 3. Ensure phase sequence of cable - R-Y-B-N
5. Improper Inspection Electrocution 4. Check for any tools inside the area.
27 Commissioning of low voltage electrical works
6. Failure of testing equipment Flash over
3 3 9 N
5. Check the Insulation & continuity values
3 3 2 6 Acceptable & Significant
7. Inappropriate working methods Fractures / Fatality 6. Check the tightness of connections
8. Unauthorized workmen 7. Ensure all emergency ways are clear and fire fightings are in place
9. Exposure of live terminals 8. Ensure LOTO removal process and sign the LOTO register
1.Industrial socket with 30nA ELCB Distribution board to be used for power supply including joint
less sized cables (< 30mA)
N 2. Use of plastic body/double insulated power toolswith repouted make like bosch,KPT,Hitachi only 3
3. Proper check lists has to be followeed and monthly inspection has to be carried
4. All tools should get pre inspected before getting into site
Page 9 of 11
SIEMENS
EHS Risk Assessment Assessment
Environment (ISO 14001) & Hazard/Risk (OHSAS 18001)
(No controls) (Residual Risk/Impact)
Activities & Sub-activities [Consider Routine/Normal; Applicable Legal Acceptable & Non-significant;
Controls Measures Control
Sr. No. Non-routine/Abnormal; Emergency activities] requirement (Y/N); Acceptable & Significant;
( Method statement; site specific controls in bullet points & environment procedure (if applicable)) Type
Likelihood
Likelihood
Provide brief if 'Y' Risk/ Significant & Not-acceptable
Env. Aspect / OH&S Hazard Env. Impact / OH&S Risk Risk/Impact
Severity
Severity
Impact
1. Ensure that person working for replacement is aware about the electrical circuitry of the area to
avoid malfunction
2. Tagging to be done for wanted & unwanted cables. (As per LOTO procedure)
3. Personal Protective Equipment to be used
(a) Safety Helmet , (b) Electrical Safety shoes
4. Skilled/ experience manpower to be deployed
5. Full body Harness with double lanyard ( max length 1.8m) with scaffold hook to be worn and
Illumintation , height work , Electrocution ,1. Injury to anchored
person due to fall from height 6. Double insulated / plastic body power tools to be used
Installation of Wiring,Fixtures, conduit works Height work , Eletrical Hazard , Lack of Social
29
etc distancing ,
2. Improper Scaffolding & Ladders 3 3 9 N 7. Industrial socket with ELCB Distribution board to be used for power supply including joint less 4 3 2 6 Acceptable & Significant
3. Covid transmit sized cables
4. Health issues 8. Personal Protective Equipment to be used
(a) Safety Helmets , (b) Safety shoes , (c) Dust mask d) Googles
9.Social distance must be maintained at material storage area , Minimum 5 ft distance to be maintain
between workers.
10. Hands has to be washed with Alcholholic hand sanitizer frequently
11. Disinfectant/fumigate the site after completion of works
12.Each worker should secure their PPES & belongings in bio degradable bags
13. Used masks and hand gloves should be disposed in dedicated Disposal bins
3. Ensure all underground live cables routes has been detected before proceeding excavation.
4. Excavation permit has to be taken 2
5. Refer utility drawings and work under close supervision
1. All construction DB's should be as per RFQ and follow necessary check lists
2. All sockest has to be industrial socket - IP44
3. All wiring has to be routed through 30mA RCCB
4. Double earthing has to be provided for DB's
5. Power cables has to be routed above 2 mtr and should have minimum 3CX2.5sqmm
6. No wooden boards are allowed.
7. DB's and boards should be enough height and fixed on stand
8. For outdoor applications, the DB has to be rated for IP 55
9. Monthly testing of RCCB and checlists has to be followed
10. No blank holes/openings are allowed
Water ingress 11. SLD has to be displayed on all DB's with emergency contact numbers
Over sizing of mcbs
Electrocution
Improper selection of cabling
Flash over
Failure of RCCB tripping
31 Use of Construction DB's Fire hazard 4 4 16 N 3 2 3 6 Acceptable & Significant
Improper earthing
Covid transmit
Using of Wooden frames
Health issues
Infected material surface / Handling of common
points
Page 10 of 11
SIEMENS
EHS Risk Assessment Assessment
Environment (ISO 14001) & Hazard/Risk (OHSAS 18001)
(No controls) (Residual Risk/Impact)
Activities & Sub-activities [Consider Routine/Normal; Applicable Legal Acceptable & Non-significant;
Controls Measures Control
Sr. No. Non-routine/Abnormal; Emergency activities] requirement (Y/N); Acceptable & Significant;
( Method statement; site specific controls in bullet points & environment procedure (if applicable)) Type
Likelihood
Likelihood
Provide brief if 'Y' Risk/ Significant & Not-acceptable
Env. Aspect / OH&S Hazard Env. Impact / OH&S Risk Risk/Impact
Severity
Severity
Impact
1. Shutdown to be taken with the help of Sodexo Technical team, PMC, and Client.
2. After confirming the same, LOTO(Lock Out Tag Out) is to be applied at the incomer supplyI.e Panel and also
at each of the Outgoing supplies i.e DBs.
3. Siemens 6 Golden rules for electrical Safety to be followed.
4. All terminations to be rechecked thoroughly by a licensed electrician and Electrical Engineer.
5. Only trained electrician and Licensed Electrician to carry out this activity.
6. CO2 Fire extinguisher to be kept available at all times.
1. Electric Shock or Electrocution.
1. Electric Hazard. 7. Special Permit to be attained for this activity.
32 Testing and Commissioning 2. Fatality. 3 3 9 N 3 3 2 6 Acceptable & Non-Significant
2. Fire Hazard. 8. Sodexo Technical team, PMC, Client should be aware of this activity and should authorize the same through
3. Burn injury.
PTW.
9. Licensed electrician who will be commissioning the panel should be wearing PPEs Like Arc Flash suit,
Electricity resistant Safety shoes, Electricity resistant Rubber hand gloves.
10. LOTO (Lock Out Tag Out) To be removed successfully after confirmation of licensed electrican and Sodexo
Technical team.
11.LOTO register shall be maintained.
12. Six golden rules of electrical safety shall be followed.
1. Waste generated shoud be segregated and disposed responsibily as per LEED requirments.
2. Water to be spinkled for housekeeping activity generating dust.
1. Environmental hazard. 1. Waste generated entering the environmental cycle. 3. Use of vaccuum cleaners and mechanical dust collectors to be promoted at site.
33 Housekeeping after completion of work. 2. Dust generation. 2. Damage to Lungs. 2 3 6 4. All mandatory PPEs like Safety helmet, safety shoes, dust mask and reflective jacket should be worn at all 4 2 1 2 Acceptable & Non-Significant
3. Foreign Particles entering the eye. 3. Eye injury. times including job speciific PPE's Like safety glasses, ear plug and cut resistant handgloves is a must for this
activity.
IMP: FOLLOW SIX GOLDEN RULES OF ELECTRICALS NOTE:1) Ensure the activity are lined ot in presence of PWD license supervicor
Prepared by: Reviwed By: Shijesh T Reviwed By: Approved by: Rahul Chitre Approved by
Sign: Sign Sign
Sign: Sign:
Page 11 of 11