0% found this document useful (0 votes)
26 views23 pages

Checking

The document provides a bill of quantities (BOQ) for a proposed residential project. It includes costs for various construction items under different sections - Foundation, Ground Floor, First Floor etc. The total project cost excluding GST is Rs. 27,89,500 and including GST is Rs. 33,73,900.25. The BOQ provides unit rates and quantities for various construction works like excavation, concrete, reinforcement, masonry, plastering etc. to calculate the total amounts.

Uploaded by

akhil joshy
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
26 views23 pages

Checking

The document provides a bill of quantities (BOQ) for a proposed residential project. It includes costs for various construction items under different sections - Foundation, Ground Floor, First Floor etc. The total project cost excluding GST is Rs. 27,89,500 and including GST is Rs. 33,73,900.25. The BOQ provides unit rates and quantities for various construction works like excavation, concrete, reinforcement, masonry, plastering etc. to calculate the total amounts.

Uploaded by

akhil joshy
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 23

Total Project

Project Cost (Excluding GST) 2789500.00


Additional (Contingencies) 69737.50
Project Cost (Including GST) 3373900.25
Electrical (Excluding GST) 0.00
Electrical (Including GST) 0.00
Plumbing Works (Excluding GST) 0.00
Plumbing Works (Including GST) 0.00
Interior Works
ACP& Others
Compound Wall

Total Project Value (Including GST)


Total Builtup area 4011.00
Rate per Sqft 0.00
BOQ FOR PROPOSED RESIDENCE OF Dr.Lovely T Denny, Thiruvalla, Kottayam

Sl. No. Description of work Unit QUANTITY RATE Amount


I FOUNDATION
1 EXCAVATION
Earth work excavation in ordinary soil / hard soil
excluding hard rock for foundation trenches, column
footing etc inclulding bailing out rain water and sub
soil water if any shoring strutting etc., removing
excavated materials stacking the same for any period
filling back around the foundations and retaining
walls with the approved soils spread in layers of 15
cms, to the required gradient and profiled levelling
watering, ramming and consolidating etc, complete as
directed.

a Depth not exceeding 1.5 metres m3 300.00 450 135000.00


b Depth exceeding 1.5 metres to 3m Rate only 550
2 PLAIN CEMENT CONCRETE
Providing and laying P.C.C. 1 : 4 : 8, using 40/20mm
grade aggregate below footing and plinth beam
including cost of all materials, labour charges,
consolidation, ramming and compacting, curing etc.
complete as directed (Cement 171kg /m 3) m3 18.00 10500 189000.00

3 FOUNDATION SHUTTERING
Providing and laying first class solid block of size 30
x20 x 10cm in CM 1:6, 150mm thick wall act as
formwork for plinth beam including materials and
labour racking out the joints scaffolding, curing etc Rate only
complete.

4 REINFORCED CEMENT CONCRETE


Providing R.C.C. M25 mix using 20mm and down
grade hard granite broken stones, machine mixed and
mechanically vibrated, including cost and conveyance
of all materials to site, labour charges, formwork, hire
a charges, watering, curing lifting charges etc complete m3 15.00 18500 277500.00
for RCC Plinth beam.

Providing R.C.C. M25 mix using 20mm and down


grade hard granite broken stones, machine mixed and
mechanically vibrated, including cost and conveyance
of all materials to site, labour charges, formwork, hire
b charges, watering, curing lifting charges etc complete m3 35.00 19500 682500.00
for G.F Base slab

Providing R.C.C. M30 mix using 20mm and down


grade hard granite broken stones, machine mixed and
mechanically vibrated, including cost and conveyance
of all materials to site, labour charges, formwork, hire
c charges, watering, curing lifting charges etc complete m3 2.00 21500 43000.00
for RCC column pedastal up to Superstructure
Providing R.C.C. M30 mix using 20mm and down
grade hard granite broken stones, machine mixed and
mechanically vibrated, including cost and conveyance
of all materials to site, labour charges, formwork, hire
d charges, watering, curing lifting charges etc complete m3 21.00 22500 472500.00
for RCC footing.

5 STEEL REINFORCEMENT
Fabricating and fixing in position of various sizes of
M.S and tor steel(grade Fe 500D) for R CC work
including cutting, bending, tying using 18 gauge G I
binding wire etc. complete for foundation. The rate
shall be including the cost of all materials except steel
reinforcements, labour charges, etc.complete. (MS
binding wire under the scope of contractor)- Plinth T 11.00 90000 990000.00
beam,footing etc.

6 MASONRY WORKS
Providing and laying Solid blocks of size 30x20x15cm
in C M 1:6, 200 mm thick wall and above plinth
beams, including all taxes,material and labour racking
a out the joints scaffolding, curing , transportation etc m3 18.00 8500
complete

7 PLASTERING
Preparing the surface and plastering the
Internal/External walls of plinth beam with C M 1:4,
12mm thick floated hard and trowelled smooth to
a perfect level including curing etc complete as directed m2 180.00 500
at all levels.

8 BASEMENT FILLING
Supply and filling the basement using red earth
required lines & levels including the cost of materials,
labour, consolidation, ramming, and compacting
a curing,hire charges etc complete as directed. m3 200.00 1450

b Filling by using the excavated earth available at site Rate only 500
Supplying and filling Quarry sand for basement filling,
depositing in layers not exceeding 20 cms
compacting, watering, ramming and consolidating to
c 95% to required levels as directed. m3 50.00 3000

Supplying and filling Quarry sand below footings,


depositing in layers not exceeding 10 cms
compacting, watering, ramming and consolidating to
d 95% to required levels as directed. m3 10.00 3500

TOTAL AMOUNT FOR FOUNDATION 2789500.00

II GROUND FLOOR
1 DAMP PROOF COURSE
Laying damp proof course 100mm thick in cement
concrete 1:2:4 with addition of water proofing
compound etc complete,including shuttering,if Rate only
required, all labour charges.

2 REINFORCED CEMENT CONCRETE


Providing R.C.C. M30mix using 20mm and down
grade hard granite broken stones, machine mixed and
mechanically vibrated, including cost and conveyance
of all materials to site, labour charges, formwork, hire
a charges, watering, curing lifting charges etc complete m3 6.25 23500
for RCC column

b ---do----RCC M25 mix m3 Rate only


Providing R.C.C. M25 mix using 20mm and down
grade hard granite broken stones, machine mixed and
mechanically vibrated, including cost and conveyance
of all materials to site, labour charges, formwork, hire
c charges, watering, curing lifting charges etc complete m3 16.00 18500
for RCC Roof beam

Providing R.C.C. M25 mix using 20mm and down


grade hard granite broken stones, machine mixed and
mechanically vibrated, including cost and conveyance
of all materials to site, labour charges, formwork, hire
d charges, watering, curing lifting charges etc complete m3 Rate only 21000
for RCC Roof slab -10cm

Providing R.C.C. M25 mix using 20mm and down


grade hard granite broken stones, machine mixed and
mechanically vibrated, including cost and conveyance
of all materials to site, labour charges, formwork, hire
d charges, watering, curing lifting charges etc complete m3 26 21500
for RCC Roof slab -11cm

Providing R.C.C. M25 mix using 20mm and down


grade hard granite broken stones, machine mixed and
mechanically vibrated, including cost and conveyance
of all materials to site, labour charges, formwork, hire
e charges, watering, curing lifting charges etc complete m3 Rate only 22000
for RCC Roof slab -12cm

Providing R.C.C. M25 mix using 20mm and down


grade hard granite broken stones, machine mixed and
mechanically vibrated, including cost and conveyance
of all materials to site, labour charges, formwork, hire
f charges, watering, curing lifting charges etc complete m3 Rate only 23000
for RCC Roof slab -15cm
Providing R.C.C. M25 mix using 20mm and down
grade hard granite broken stones, machine mixed and
mechanically vibrated, including cost and conveyance
of all materials to site, labour charges, formwork, hire
g charges, watering, curing lifting charges etc complete m3 Rate only 24000
for RCC Roof slab -18cm

Providing R.C.C. M25 mix using 20mm and down


grade hard granite broken stones, machine mixed and
mechanically vibrated, including cost and conveyance
of all materials to site, labour charges, formwork, hire
h charges, watering, curing lifting charges etc complete m3 Rate only 25000
for RCC Roof slab -20cm

Providing R.C.C. M25 mix using 20mm and down


grade hard granite broken stones, machine mixed and
mechanically vibrated, including cost and conveyance
of all materials to site, labour charges for formwork,
i hire charges, watering, curing lifting charges etc m3 4.00 23000
complete for Lintels.

Providing R.C.C. M25 mix using 20mm and down


grade hard granite broken stones, machine mixed and
mechanically vibrated, including cost and conveyance
of all materials to site, labour charges for formwork,
j hire charges, watering, curing lifting charges etc m3 2.00 23000
complete for Sunshade.

Providing R.C.C. M25 mix using 20mm and down


grade hard granite broken stones, machine mixed and
mechanically vibrated, including cost and conveyance
of all materials to site, labour charges for formwork,
k hire charges, watering, curing lifting charges etc m3 Rate only 24000
complete for Drop slab.

Providing R.C.C. M25 mix using 20mm and down


grade hard granite broken stones, machine mixed and
mechanically vibrated, including cost and conveyance
of all materials to site, labour charges for formwork,
l hire charges, watering, curing lifting charges etc m3 Rate only 22000
complete for Kerb.(200X50mm size)

Providing R.C.C. M25 mix using 20mm and down


grade hard granite broken stones, machine mixed and
mechanically vibrated, including cost and conveyance
of all materials to site, labour charges for formwork,
m hire charges, watering, curing lifting charges etc Rm Rate only 21500
complete for Kerb.(100X50mm size)
Providing R.C.C. M25 mix using 20mm and down
grade hard granite broken stones, machine mixed and
mechanically vibrated, including cost and conveyance
of all materials to site, labour charges for formwork,
n hire charges, watering, curing lifting charges etc m3 1.80 23000
complete for Staircase.

Providing and laying Mid Lintel in 110mm brick wall ,


100 mm thick RCC M20 ,using 20mm hard granite
broken stone graded aggregate, including cost of all
materials,formwork , labour charges , charges for
o watering , curing,etc complete as directed, but Rm 2.50 23000
including the cost and labour for reinforcement.

Providing R.C.C. M20 mix using 20mm and down


grade hard granite broken stones, machine mixed and
mechanically vibrated, including cost and conveyance
of all materials to site, labour charges for formwork,
p hire charges, watering, curing lifting charges etc m3 Rate only 18500
complete for Counter slab/thin slab

Providing RCC mix M15 for SUNKEN AREA KERB,using


20mm.downgraded hard granite broken stone
aggregates,machine mixed and mechanically
16 vibrated,including labour,cost and conveyance of all m3 Rate only 17500
materials,formwork,hire,lead and lift
charges,watering,curing,etc,complete as directed,but
excluding cost for reinforcement

Providing and laying sunken filling, mix M10 with


smooth finish,average thickness 50 mm over toilets to
17 required slope,using coarse aggregates including cost m2 15 13500
and conveyance of all materials to site,labour charges
etc complete

3 STEEL REINFORCEMENT
Fabricating and fixing in position of various sizes of
M.S and tor steel(Grade Fe500D) for RCC work
including cutting, bending, tying using 18 gauge G I
binding wire etc. complete for foundation. The rate
shall be including the cost of all materials except steel
a reinforcements, labour charges, etc.complete. (MS TONNE 8.50 90000
binding wire under the scope of contractor)

4 MASONRY WORKS
Providing and laying brick masonry of size in C M
1:6, 200mm thick wall (1st class country burnt
bricks , semi wire cut) ,well soaked in water prior to
construction and above, including all taxes,material
a and labour racking out the joints scaffolding, curing , m3 45.00 14000
transportation etc complete.
Providing and laying brick masonry of size in C M
1:6, 100mm thick wall (1st class country burnt
bricks , semi wire cut) ,well soaked in water prior to
construction and above, including all taxes,material
b and labour racking out the joints scaffolding, curing , m3 5.00 11500
transportation etc complete.

Providing and laying Solid blocks of size 30x20x15cm


in C M 1:4, 200/150mm thick wall (1st quality) and
above, including all taxes,material and labour racking
c out the joints scaffolding, curing , transportation etc m3 Rate only 8500
complete

Providing and laying solid block of size 30x20x10 cm


(1st quality) in C M 1:4, 100mm thick wall and
above, including all taxes,material and labour racking
d out the joints scaffolding, curing , transportation etc m3 Rate only 7500
complete

5 PLASTERING
Preparing the surface and plastering the internal
walls, sides of beams, lintels, stairs etc. with C M 1:4,
12mm thick etc floated hard and trowelled smooth
to perfect level , including cost and conveyance of all
materials (include supplying and fixing the Fiber
mesh on the joints of concrete and masonry) to site,
a m2 400.00 450
labour charges,lead,liftand hire charges for
scaffolding,curing etc complete

Preparing the surface and plastering the External


walls, sides of beams, lintels, stairs etc. with C M 1:4,
12mm thick with waterproof chemical ,one coat
floated hard and trowelled smooth to perfect level
(include supplying and fixing the Fiber mesh on the
joints of concrete and masonry) , including cost and
b conveyance of all materials to site, labour m2 300.00 550
charges,lead,liftand hire charges for scaffolding,curing
etc complete

Preparing the surface and plastering the ceilings,


under side of slabs, sun shades beams and stair case,
gutter , steps etc. with C M 1:3, 9mm thick floated
hard and trowelled smooth including cost and
c conveyance of all materials to site, labour m2 250.00 650
charges,lead,liftand hire charges for scaffolding,curing
etc complete

Screeding the sunken area using 6mm broken stone


8cm thick,1:2:4 including all materials
d labour ,watering ,curing etc. m2 10.00 550

6 WATER PROOFING
Water proofing of sunken slabs/terrace by applying
two coats of acrylic based water proofing compound
CERALASTIC / HYSEAL / RBR cement slurry coating or
approved equivalent and before it dries out, applying
plastering 20mm thick in c.m 1:3 admixed with
integrated water proofing compound of approved
30 brand including cost of all materials to site, labour
charges etc, complete

a) Toilets m2 10.00 3500


6 JOINERY
Supplying and fixing Teak wood door, inclusive of
labour charges for fixing all fittings and cost of fittings
etc. complete (MD- 120x240) Nos 1.00 60000

Supplying and fixing hard wood door frame , flush


door shutter inclusive of labour charges for fixing all
fittings and cost of fittings etc. complete

Consulting room Door D(100x240) Nos 1.00 17000


Bed Room and Dining Door (100x210) Nos 2.00 14500
W/A Outside Door D1 (90x240) Nos 1.00 16000
W/A Inside door (90x210) Nos 1.00 14500
Store door (75x210) Nos 1.00 12000
Supplying and fixing Glass Door inclusive of labour
charges for fixing all fittings and cost of fittings etc.
complete
Glass Door GD(100x210) Nos 1.00 16500
Supplying and fixing flush door (For Toilets), shutter
inclusive of labour charges
for fixing all fittings and cost of fittings etc. complete

Toilet Door (80x210) Nos 2.00 9000


Powder toilet (75x210) Nos 1.00 8000
Supplying and fixing hard wood window frame and
shutter inclusive of labour charges for fixing all fittings
and cost of fittings etc. complete
W3 (180x150) Nos 2.00 30000
W2a(120x120) Nos 2.00 18000
W3a(180x120) Nos 1.00 27000
W4(240x150) Nos 1.00 38000
W2(120x150) Nos 2.00 20000
Supplying and fixing hard wood french window
frame and shutter inclusive of labour charges for
fixing all fittings and cost of fittings etc. complete

W3 (180x240) Nos 2.00 45000


Supplying and fixing hard wood ventilator frame and
shutter inclusive of labour charges for fixing all fittings
and cost of fittings etc. complete

V4(120x60) Nos 2.00 8000


V1(60x60) Nos 2.00 4000
G MS GRILLS
Fabricating and supplying ms grills for windows,
openings in parapet etc, fabricated with ms flats,
round or square bars, tubes etc, including cost and
conveyance of all materials and consumables to site,
labour charges, lead, lift and hire charges of
44 equipments, tools, tackles etc, providing and applying
a coat of zinc chromate primer etc., complete as
directed, at all levels.

a) grills TONNE 2.81 40000

H HAND RAILS
Supplying, fabricating, loading and unloading and
fixing in position 16 guage GI handrails for staircase
as per the approved design. The rate includes all the
46 cost of materials, labour for fabricating and fixing in MTR 5.00 3500
position etc. complete.

6 TILES
Providing and laying in floors, first quality Vitrified
tiles of Johnson, Kajaria, Naveen or equivalent
approved make in cement mortar 1:4 (1 cement : 4
sand), average 20mm thick, selecting the tiles to get
perfect joints, filling the joints with white cement
added with matching colour, including cost and
conveyance of all materials to site, labour charges, m2 125.00 950
lead, lift and hire charges, watering, curing, etc
complete as directed.

Providing and laying in floors, first quality Vitrified


tiles of Johnson, Kajaria, Naveen or equivalent
approved make in cement mortar 1:4 (1 cement : 4
sand), average 20mm thick, selecting the tiles to get
perfect joints, filling the joints with white cement
added with matching colour, including cost and
conveyance of all materials to site, labour charges, m2 23.00 950
lead, lift and hire charges, watering, curing, etc
complete as directed. (In Sitouts, including Steps)

Laying in floors of Kitchen Ceramic tiles on 20mm


thick cement mortar 1:6 including all cost of materials
and labour charges, skirting, grouting the joints with
white cement and matching pigment etc. complete as
per the direction. m2 40.00 950

Providing and laying in toilet floors, first quality


Ceramic tiles, anti skid type of approved size,
Johnson, Kajaria, Naveen or equivalent approved
make, in cement mortar 1:4 (1 cement : 4 sand),
average 12mm thick, selecting the tiles to get perfect
joints, filling the joints with white cement added with
matching colour, including cost and conveyance of all m2 15.00 1050
materials to site, labour charges, lead, lift and hire
charges, watering, curing, etc complete as directed.
Providing and fixing 100mm high skirting on walls,
with approved quality vitrified tiles in flat area in
cement mortar 1:3 (1 cement : 3 sand ) with a
minimum of 9mm thickness, preparing the edges of
vitrified tiles to get perfect joints on fixing, filling the
joints with white cement added with matching colour, Rm 200.00 950
fixing the tiles to true line as directed, including cost
and conveyance of all materials to site, lead and lift
charges, labour charges, extra charges for chamfering
the edges of tiles, watering, curing, etc complete, as
directed.

Providing and fixing 100mm high skirting on walls,


with approved quality cermaic tiles in kitchen area in
cement mortar 1:3 (1 cement : 3 sand ) with a
minimum of 9mm thickness, preparing the edges of
vitrified tiles to get perfect joints on fixing, filling the
joints with white cement added with matching colour, Rm 50.00 950
fixing the tiles to true line as directed, including cost
and conveyance of all materials to site, lead and lift
charges, labour charges, extra charges for chamfering
the edges of tiles, watering, curing, etc complete, as
directed.

Providing and laying approved quality polished


Granite slab in working platforms, wash counters etc
in cement mortar 1:4 (1 cement : 4 sand), filling the
joints with white cement added with matching colour,
m2 12.00 3000
cutting openings in the slab true to the required
profile, edge rounding and polishing, including cost
and conveyance of all materials to site, lead, lift,
labour charges etc. complete, as directed.

Dadoing on walls in toilets, wash basin wall etc with


first quality Glazed tile, fixed on the base coat of
plastering in cement mortar 1:4(1 cement : 4 sand),
selecting the tiles to get
perfect joints on fixing, and filling the tile joints 40.00 750
with white cement added with matching colour m2
including cost and conveyance of all materials to
site, lead, lift and hire charges,labour charges,
extra charges for chamfering the edges of tiles,
watering, curing etc,complete, as directed.

L PAINTING

Finishing new cement plastered internal surface of


walls etc with two coats of approved
decorative/acrylic Emulsion Paint, roller finish, over
68 one coat of primer and two coats of approved putty, m2 400.00 3300.0
Altek or equivalent, including cost and conveyance of
all materials to site, hire charges for scaffolding,
labour charges, etc. complete as directed.
Finishing new cement plastered under side of
slab,under side of staircase, faces of beams etc with
two coats of approved decorative/acrylic emulsion
69 paint, roller finish, over one coats of primer,including m2 310.00 1450
cost and conveyance of all materials to site, hire
charges for scaffolding, labour charges, etc. complete
as directed.

Finishing new cement plastered external surface of


walls, fins, parapet, water tank etc with two coats of
approved quality of exterior emulsion, Apex /
71 Snowcryl / Weathershield or approved equivalant 270.00 2500
over a priming coat of white cement , including cost m2
and conveyance of all materials to site, labour
charges, lead, lift and hire charges for scaffolding,
watering etc complete as directed, at all levels.

Providing and painting the steel works, ms grills, etc


with two
coats of synthetic enamel paint of approved brand
and colour, over one coat of zinc chromate primer,
72 including cleaning the sections thoroughly with wire m2 400.00 3500
brush / emery paper and removing of all rust / dust
etc, cost and conveyance of all materials to site,
labour charges, hire charges etc. complete as
directed, at all levels.

Louver m2 90.00

TOTAL AMOUNT FOR GROUND FLOOR 0.00

III FIRST FLOOR


1 REINFORCED CEMENT CONCRETE
Providing R.C.C. M30mix using 20mm and down
grade hard granite broken stones, machine mixed and
mechanically vibrated, including cost and conveyance
of all materials to site, labour charges, formwork, hire
a charges, watering, curing lifting charges etc complete m3 4.20
for RCC column

b ---do----RCC M30 mix m3 Rate Only


Providing R.C.C. M25 mix added with water proofing
compound ceraplast IWP ,Fosroc or equivalent using
20mm and down grade hard granite broken stones,
machine mixed and mechanically vibrated, including
cost and conveyance of all materials to site, labour
charges, formwork, hire charges, watering, curing
c lifting charges etc complete for RCC Roof beam m3 13.00
Providing R.C.C. M25 mix added with water proofing
compound ceraplast IWP ,Fosroc or equivalent using
20mm and down grade hard granite broken stones,
machine mixed and mechanically vibrated, including
cost and conveyance of all materials to site, labour
charges, formwork, hire charges, watering, curing
d lifting charges etc complete for RCC Roof slab -10cm m3 Rate Only

Providing R.C.C. M25 mix added with water proofing


compound ceraplast IWP ,Fosroc or equivalent using
20mm and down grade hard granite broken stones,
machine mixed and mechanically vibrated, including
cost and conveyance of all materials to site, labour
charges, formwork, hire charges, watering, curing
d lifting charges etc complete for RCC Roof slab -11cm m3 19.00

Providing R.C.C. M25 mix added with water proofing


compound ceraplast IWP ,Fosroc or equivalent using
20mm and down grade hard granite broken stones,
machine mixed and mechanically vibrated, including
cost and conveyance of all materials to site, labour
e charges, formwork, hire charges, watering, curing m3 Rate Only
lifting charges etc complete for RCC Roof slab -12cm

Providing R.C.C. M25 mix using 20mm and down


grade hard granite broken stones, machine mixed and
mechanically vibrated, including cost and conveyance
of all materials to site, labour charges, formwork, hire
f charges, watering, curing lifting charges etc complete m3 Rate Only
for RCC Roof slab -15cm

Providing R.C.C. M25 mix added with water proofing


compound ceraplast IWP ,Fosroc or equivalent using
20mm and down grade hard granite broken stones,
machine mixed and mechanically vibrated, including
cost and conveyance of all materials to site, labour
charges, formwork, hire charges, watering, curing
g lifting charges etc complete for RCC Roof slab -18cm m3 Rate Only

Providing R.C.C. M25 mix added with water proofing


compound ceraplast IWP ,Fosroc or equivalentusing
20mm and down grade hard granite broken stones,
machine mixed and mechanically vibrated, including
cost and conveyance of all materials to site, labour
charges, formwork, hire charges, watering, curing
h lifting charges etc complete for RCC Roof slab -20cm m3 Rate Only
Providing R.C.C. M25 mix using 20mm and down
grade hard granite broken stones, machine mixed and
mechanically vibrated, including cost and conveyance
of all materials to site, labour charges for formwork,
i hire charges, watering, curing lifting charges etc m3 1.00
complete for Lintels.

Providing R.C.C. M25 mix using 20mm and down


grade hard granite broken stones, machine mixed and
mechanically vibrated, including cost and conveyance
of all materials to site, labour charges for formwork,
j hire charges, watering, curing lifting charges etc m3 2.00
complete for Sunshade.

Providing R.C.C. M25 mix using 20mm and down


grade hard granite broken stones, machine mixed and
mechanically vibrated, including cost and conveyance
of all materials to site, labour charges for formwork,
k hire charges, watering, curing lifting charges etc m3 Rate only
complete for Drop slab.

Providing R.C.C. M25 mix using 20mm and down


grade hard granite broken stones, machine mixed and
mechanically vibrated, including cost and conveyance
of all materials to site, labour charges for formwork,
l hire charges, watering, curing lifting charges etc Rm Rate only
complete for Kerb.(200X50mm size)

Providing R.C.C. M25 mix using 20mm and down


grade hard granite broken stones, machine mixed and
mechanically vibrated, including cost and conveyance
of all materials to site, labour charges for formwork,
m hire charges, watering, curing lifting charges etc Rm Rate only
complete for Kerb.(100X50mm size)

Providing R.C.C. M25mix using 20mm and down grade


hard granite broken stones, machine mixed and
mechanically vibrated, including cost and conveyance
of all materials to site, labour charges for formwork,
i hire charges, watering, curing lifting charges etc m3 1.16
complete for pergola

Providing and laying Mid Lintel in 110mm brick wall ,


100 mm thick RCC M20 ,using 20mm hard granite
broken stone graded aggregate, including cost of all
materials,formwork , labour charges , charges for
p watering , curing,etc complete as directed, but Rm 5.00
including the cost and labour for reinforcement.

2 STEEL REINFORCEMENT
Fabricating and fixing in position of various sizes of
M.S and tor steel(Grade Fe500D) for R CC work
including cutting, bending, tying using 18 gauge G I
binding wire etc. complete for foundation. The rate
shall be including the cost of all materials except steel
a reinforcements, labour charges, etc.complete. (MS T 6.00
binding wire under the scope of contractor)

3 MASONRY WORKS
Providing and laying brick masonry of size in C M
1:6, 200mm thick wall (1st class country burnt
bricks , semi wire cut) ,well soaked in water prior to
construction and above, including all taxes,material
a and labour racking out the joints scaffolding, curing , m3 45.00
transportation etc complete

Providing and laying brick masonry of size in C M


1:6, 100mm thick wall (1st class country burnt
bricks , semi wire cut) ,well soaked in water prior to
construction and above, including all taxes,material
b and labour racking out the joints scaffolding, curing , m3 5.00
transportation etc complete

Providing and laying Solid blocks of size 30x20x15cm


in C M 1:4, 200/150mm thick wall (1st quality) and
above, including all taxes,material and labour racking
c out the joints scaffolding, curing , transportation etc m3 Rate Only
complete

Providing and laying solid block of size 30x20x10 cm


(1st quality) in C M 1:4, 100mm thick wall and
above, including all taxes,material and labour racking
d out the joints scaffolding, curing , transportation etc m3 Rate Only
complete

4 PLASTERING
Preparing the surface and plastering the internal
walls, sides of beams, lintels, stairs etc. with C M 1:4,
12mm thick etc floated hard and trowelled smooth
to perfect level , including cost and conveyance of all
materials (include supplying and fixing the Fiber
mesh on the joints of concrete and masonry) to site,
a labour charges, lead, lift and hire charges for m2 400
scaffolding, curing etc complete

Preparing the surface and plastering the External


walls, sides of beams, lintels, stairs etc. with C M 1:4,
12mm thick with waterproof chemical ,one coat
floated hard and trowelled smooth to perfect level
(include supplying and fixing the Fiber mesh on the
joints of concrete and masonry) , including cost and
b conveyance of all materials to site, labour m2 260.00
charges,lead,liftand hire charges for scaffolding,curing
etc complete
Preparing the surface and plastering the ceilings,
under side of slabs, sun shades beams and stair case,
gutter , steps etc. with C M 1:3, 9mm thick floated
hard and trowelled smooth including cost and
c conveyance of all materials to site, labour m2 160.00
charges,lead,liftand hire charges for scaffolding,curing
etc complete

Screeding the sunken area using 6mm broken stone


d 4cm thick, 1:2:4 including all materials labour, m2 12.00
watering , curing e t c.

6 JOINERY
Supplying and fixing hard wood door frame , flush
door shutter inclusive of labour charges for fixing all
a fittings and cost of fittings etc. complete

i) Bed Room (100x210) Nos 2.00


ii) Utility door (90x210) Nos 2.00
Supplying and fixing hard wood door cum window,
inclusive of labour charges for fixing all fittings and
b cost of fittings etc. complete

i) Door cum window DW3(100+180x240) Nos 1.00


Supplying and fixing flush door (For Toilets), shutter
inclusive of labour charges
c for fixing all fittings and cost of fittings etc. complete

i) Toilet Door (90x210) Nos 2.00


Supplying and fixing sliding door (For Balcony),
inclusive of labour charges
d for fixing all fittings and cost of fittings etc. complete

i) SD2 (221.5x240) m2 5.32


Supplying and fixing hard wood window frame and
shutter inclusive of labour charges for fixing all fittings
e and cost of fittings etc. complete

i) W3 (180x150) Nos 5.00


ii) W4(240x150) Nos 1.00
iii) W2(120x150) Nos 1.00
Supplying and fixing hard wood french window
frame and shutter inclusive of labour charges for
f fixing all fittings and cost of fittings etc. complete

i) FW3 (180x240) Nos 1.00


Supplying and fixing hard wood ventilator frame and
shutter inclusive of labour charges for fixing all fittings
g and cost of fittings etc. complete

i) V4(120x60) Nos 2.00


ii) V3(80x60) Nos 1.00
Supplying and fixing fixed glass inclusive of labour
h charges for fixing all fittings and cost of fittings etc. m2 16.32
complete

6 TILES
Providing and laying in floors, first quality Vitrified
tiles of Johnson, Kajaria, Naveen or equivalent
approved make in cement mortar 1:4 (1 cement : 4
sand), average 20mm thick, selecting the tiles to get
perfect joints, filling the joints with white cement
added with matching colour, including cost and
conveyance of all materials to site, labour charges, m2 88.00
lead, lift and hire charges, watering, curing, etc
complete as directed. (In Bed, Living)

Providing and laying in floors, first quality Vitrified


tiles of Johnson, Kajaria, Naveen or equivalent
approved make in cement mortar 1:4 (1 cement : 4
sand), average 20mm thick, selecting the tiles to get
perfect joints, filling the joints with white cement
added with matching colour, including cost and
conveyance of all materials to site, labour charges, m2 17.00
lead, lift and hire charges, watering, curing, etc
complete as directed. (In balcony)

Laying in floors of Utility Ceramic tiles on 20mm


thick cement mortar 1:6 including all cost of materials
and labour charges, skirting,grouting the joints with
white cement and matching pigment etc. complete as
per the direction m2 7.50

Providing and laying in toilet floors, first quality


Ceramic tiles, anti skid type of approved size,
Johnson, Kajaria, Naveen or equivalent approved
make, in cement mortar 1:4 (1 cement : 4 sand),
average 12mm thick, selecting the tiles to get perfect
joints, filling the joints with white cement added with
matching colour, including cost and conveyance of all m2 12.50
materials to site, labour charges, lead, lift and hire
charges, watering, curing, etc complete as directed.

Providing and fixing 100mm high skirting on walls,


with approved quality vitrified tiles in cement mortar
1:3 (1 cement : 3 sand ) with a minimum of 9mm
thickness, preparing the edges of vitrified tiles to get
perfect joints on fixing, filling the joints with white Rm 70.00
cement added with matching colour, fixing the tiles to
true line as directed, including cost and conveyance
of all materials to site, lead and lift charges, labour
charges, extra charges for chamfering the edges of
tiles, watering, curing, etc complete, as directed.
Providing and fixing 100mm high skirting on walls,
with approved quality cermaic tiles in utility in
cement mortar 1:3
(1 cement : 3 sand ) with a minimum of 9mm
thickness, preparing the edges of vitrified tiles to get
perfect joints on fixing, filling the joints with white Rm 12.00
cement added with matching colour, fixing the tiles to
true line as directed, including cost and conveyance
of all materials to site, lead and
lift charges, labour charges, extra charges for
chamfering the edges of tiles, watering, curing,
etc complete, as directed.

Providing and laying approved quality polished


Granite slab in working platforms, wash counters etc
in cement mortar 1:4 (1 cement : 4 sand), filling the
joints with white cement added with matching colour, m2 Rate Only
cutting openings in the slab true to the required
profile, edge rounding and polishing, including cost
and conveyance of all materials to site, lead, lift,
labour charges etc. complete, as directed.

Dadoing on walls in toilets, wash basin wall etc with


first quality Glazed tile, fixed on the base coat of
plastering in cement mortar 1:4(1 cement : 4 sand),
selecting the tiles to get
perfect joints on fixing, and filling the tile joints
m2 45.48
with white cement added with matching colour
including cost and conveyance of all materials to
site, lead, lift and hire charges,labour charges,
extra charges for chamfering the edges of tiles,
watering, curing etc,complete, as directed.

Stone Cladding m2 16.80

TOTAL AMOUNT FOR FIRST FLOOR 0.00

IV TERRACE FLOOR
1 REINFORCED CEMENT CONCRETE
Providing R.C.C. M25 mix using 20mm and down
grade hard granite broken stones, machine mixed and
mechanically vibrated, including cost and conveyance
of all materials to site, labour charges for formwork,
a hire charges, watering, curing lifting charges etc m3 Rate only
complete for Sunshade.

Providing R.C.C. M25 mix using 20mm and down


grade hard granite broken stones, machine mixed and
mechanically vibrated, including cost and conveyance
of all materials to site, labour charges for formwork,
b hire charges, watering, curing lifting charges etc m3 Rate only
complete for Drop slab.
Providing R.C.C. M25 mix using 20mm and down
grade hard granite broken stones, machine mixed and
mechanically vibrated, including cost and conveyance
of all materials to site, labour charges for formwork,
c hire charges, watering, curing lifting charges etc Rm Rate only
complete for Kerb.(200X50mm size)

Providing R.C.C. M25 mix added with water proofing


compound ceraplast IWP ,Fosroc or equivalent using
20mm and down grade hard granite broken stones,
machine mixed and mechanically vibrated, including
cost and conveyance of all materials to site, labour
charges, formwork, hire charges, watering, curing
d m3 1.50
lifting charges etc complete for RCC slab (Water tank
base slab)

Providing R.C.C. M25 mix added with water proofing


compound ceraplast IWP ,Fosroc or equivalent using
20mm and down grade hard granite broken stones,
machine mixed and mechanically vibrated, including
cost and conveyance of all materials to site, labour
e charges, formwork, hire charges, watering, curing m3 2.50
lifting charges etc complete for RCC Wall (Water tank
side walls)

Providing R.C.C. M25 mix using 20mm and down


grade hard granite broken stones, machine mixed and
mechanically vibrated, including cost and conveyance
of all materials to site, labour charges, formwork, hire
f charges, watering, curing lifting charges etc complete m3 0.80
for RCC slab (Water tank cover slab)

2 STEEL REINFORCEMENT
Fabricating and fixing in position of various sizes of
M.S and tor steel(Grade Fe500D) for RCC work
including cutting, bending, tying using 18 gauge G I
binding wire etc. complete for foundation. The rate
shall be including the cost of all materials except steel
a reinforcements, labour charges, etc.complete. (MS T 0.60
binding wire under the scope of contractor)

3 MASONRY WORKS
Providing and laying brick masonry of size in C M
1:6, 200mm thick wall (1st class country burnt
bricks , semi wire cut) ,well soaked in water prior to
construction and above, including all taxes,material
a and labour racking out the joints scaffolding, curing , m3 7.00
transportation etc complete
Providing and laying brick masonry of size in C M
1:6, 100mm thick wall (1st class country burnt
bricks , semi wire cut) ,well soaked in water prior to
construction and above, including all taxes,material
b and labour racking out the joints scaffolding, curing , m3 11.00
transportation etc complete

Providing and laying Solid blocks of size 30x20x15cm


in C M 1:4, 200/150mm thick wall (1st quality) and
above, including all taxes,material and labour racking
c out the joints scaffolding, curing , transportation etc m2 Rate only
complete

Providing and laying solid block of size 30x20x10 cm


(1st quality) in C M 1:4, 100mm thick wall and
above, including all taxes,material and labour racking
d out the joints scaffolding, curing , transportation etc m2 Rate only
complete

4 PLASTERING
Preparing the surface and plastering the internal
walls, sides of beams, lintels, stairs etc. with C M 1:4,
12mm thick etc floated hard and trowelled smooth
to perfect level , including cost and conveyance of all
materials (include supplying and fixing the Fiber
mesh on the joints of concrete and masonry) to site,
a labour charges,lead,lift and hire charges for m2 12.00
scaffolding,curing etc complete

Preparing the surface and plastering the External


walls, sides of beams, lintels, stairs etc. with C M 1:4,
12mm thick with waterproof chemical ,one coat
floated hard and trowelled smooth to perfect level
(include supplying and fixing the Fiber mesh on the
joints of concrete and masonry) , including cost and
b conveyance of all materials to site, labour m2 15.00
charges,lead,lift and hire charges for
scaffolding,curing etc complete

Preparing the surface and plastering the ceilings,


under side of slabs, sun shades beams and stair case,
gutter,water tank, steps etc. with C M 1:3, 9mm thick
floated hard and trowelled smooth including cost and
c conveyance of all materials to site, labour m2 6.00
charges,lead,liftand hire charges for scaffolding,curing
etc. complete

Screeding the roof top , sunken area using 6mm


broken stone 4cm thick,1:2:4 including all materials
d labour, watering, curing etc. m2 Rate Only
Plastering over terrace with cement mortar 1:4 ( 1
cement : 4 sand ), with a minimum of 12 mm. thick
one coat floated hard and trowelled smooth,
e including a flushing coat with neat cement slurry and 71.00
providing chequred design, including cost and m2
conveyance of all materials to site, labour charges,
lead, lift and hire charges for scaffolding, watering,
curing etc complete as directed

5 Truss work m2 150.00

TOTAL AMOUNT FOR TERRACE FLOOR AND OHT 0.00

IV SUMP TANK (4000 ltrs)


1 EXCAVATION
a

Earth work excavation in ordinary soil / hard soil


excluding hard rock for foundation trenches, column
footing etc inclulding bailing out rain water and sub
soil water if any shoring strutting etc.,removing
excavated materials stacking the same for any period 9.00
filling back around the foundations and retaining m3
walls with the approved soils spread in layers of 15
cms, to the required gradient and profiled levelling
watering, ramming and consolidating etc, complete as
directed.

2 PLAIN CEMENT CONCRETE


a
Providing and laying P C C 1 : 4 : 8, using 40mm
grade aggregate , including cost of all materials
m3 0.50
consolidation, ramming and compacting, curing
etc. complete as directed.
3 BASE SLAB
a
Providing R C C M25 using 20 mm down grade
hard granite brocken stones,machine mixed and
mechancally vibrated, including cost and 0.90
conveyence of all materials to site,labour, m3
necessary shuttering, formwork,hire charges
watering, curing, lifting charges etc.complete.

b ---do----RCC M30 mix m3 Rate only


c ---do----RCC M20 mix m 3 Rate only
4 SIDE WALL
a
Providing R C C M25 using 20 mm down grade hard
granite brocken stones,machine mixed and
mechancally vibrated, including cost and
conveyence of all materials to site,labour, m3 2.50
necessary shuttering, formwork,hire charges
watering, curing, lifting charges etc.complete. for side
walls

b ---do----RCC M30 mix m3 Rate only


c ---do----RCC M20 mix m 3 Rate only
5 COVER SLAB
a
Providing R C C M25 using 20 mm down grade hard
granite brocken stones,machine mixed and
mechancally vibrated, including cost and 0.40
conveyence of all materials to site,labour, m3
necessary shuttering, formwork,hire charges
watering, curing, lifting charges etc.complete.

b ---do----RCC M30 mix m3 Rate only


c ---do----RCC M20 mix m 3 Rate only
6 STEEL REINFORCEMENT
a Fabricating and fixing in position of various sizes of
M.S and tor steel(Grade Fe500D) for R CC work
including cutting, bending, tying using 18 gauge G I
binding wire etc. complete for foundation. The rate
shall be including the cost of all materials except steel
reinforcements, labour charges, etc.complete. (MS T 0.60
binding wire under the scope of contractor)

7 PLASTERING
a
Prepairing the surface and plastering the external
walls/slabs with C M 1:4, 12mm thick floated hard
and trowelled smooth to perfect level with water m2 15
proofing compound ,including curing etc complete as
directed at all levels.

b
Prepairing the surface and plastering the internal
walls with C M 1:4, 12mm thick floated hard and
trowelled smooth to perfect level with water proofing m2 11
compound ,including curing etc complete as directed
at all levels.

c
Prepairing the surface and plastering the ceilings,
under side of slabs with C M 1:3, 9mm thick floated 4
hard and trowelled smooth including m2
scaffolding,curing etc complete
d
Screeding the bottom slab using 6mm broken
stone 4cm thick,1:2:4 including all materials labour, m2 Rate only
watering, curing e t c.
e Floor plastering with water proofing compound
m2 4
using CM 1:5 15mm thick
TOTAL AMOUNT FOR SUMP TANK 0.00

V SEPTIC TANK AND SOAK PIT -


1 EARTH WORK EXCAVATION
a

Earth work excavation in ordinary soil / hard soil


excluding hard rock for foundation trenches,
column footing etc inclulding bailing out rain water
and sub soil water if any shoring strutting etc.,
removing excavated materials stacking the same for 18
any period filling back around the foundations and m3
retaining walls with the approved soils spread in
layers of 15 cms, to the required gradient and profiled
levelling watering, ramming and consolidating etc,
complete as directed.
2 PLAIN CEMENT CONCRETE
a Providing and laying P C C 1 : 4 : 8, using 40mm grade
aggregate 150mm thick below Septic tank including
cost of all materials consolidation, ramming and
compacting, curing etc. complete as directed. m3 1.3

3 SIDE WALL
a
Providing cast in situ R C C grade M25 for Side
walls including material and labour, necessary 4
shuttering, formwork, mechanical vibration, m3
curing etc complete as directed.

b ---do----RCC M20 mix m3 Rate Only


4 BOTTOM SLAB
a
Providing R C C M25 using 20 mm down grade hard
granite broken stones,machine mixed and
mechancally vibrated, including cost and
conveyence of all materials to site,labour, m3 1.1
necessary shuttering, formwork,hire charges
watering, curing, lifting charges etc.complete for
base slab.

5 COVER SLAB

Providing R C C M25 using 20 mm down grade hard


granite broken stones,machine mixed and
mechanically vibrated, including cost and
a conveyence of all materials to site,labour, m3 1
necessary shuttering, formwork,hire charges
watering, curing, lifting charges etc.complete.
for cover slab.

b ---do----RCC M20 mix m3 Rate only


6 STEEL REINFORCEMENT
Fabricating and fixing in position of various sizes of
M.S and tor steel(Grade Fe500D) for R CC work
including cutting, bending, tying using 18 gauge G I
binding wire etc. complete for foundation. The rate
shall be including the cost of all materials except steel
a reinforcements, labour charges, etc.complete. (MS T 0.70
binding wire under the scope of contractor)

7 PLASTERING

Preparing the surface and plastering the external


walls with C M 1:4, 15mm thick floated hard and
a m2 25
trowelled smooth to perfect level including curing etc
complete as directed at all levels.

Preparing the surface and plastering the internal


b walls with C M 1:4, 12mm thick floated hard and 20
trowelled smooth to perfect level including curing etc m2
complete as directed at all levels.

c Floor plastering with water proofing compound using 4


CM 1:5 15mm thick m2
Providing and laying first class brick masonry in CM
1:6 for Soak pit work, 200mm thick wall and above,
d m3 0.75
including materials and labour raking out the joints,
scaffolding, curing etc complete

Supply and filling the soak pit by using brick bat &
e m3 3
charcoal.

Supply and filling the 20mm & 40mm metal around


f the soak pit for proper drain off water through the m3 0.5
PVC pipe fixed on the masonry wall.

TOTAL AMOUNT FOR SEPTIC TANK 0.00

GRAND TOTAL AMOUNT (FOUNDATION+ GROUND


FLOOR+ FIRST FLOOR+ TERRACE FLOOR & OHT+
SUMP TANK+ SEPTIC TANK AND SOAK PIT) 2789500.00
(Excluding GST)

Plumbing (Excluding GST)


Electrical (Excluding GST)

Total 2789500.00 695.46 4011