Extension Garage
Extension Garage
LOCATION:
2 EARTHWORKS
EXCAVATION AND BACKFILL 1 LOT 1500 0 1500 1500
3 MASONRY WORKS
CHB LAYING
CHB 5" 244 PCS 14 5.6 3416 1366.4 4782.4
CEMENT 19 BAGS 250 100 4750 1900 6650
SAND 1.8 CU.M 1900 760 3420 1368 4788
10MM DIA DEFORMED BAR 17 PCS 155 62 2635 1054 3689
GI TIE WIRE NO.16 10 KGS 90 36 900 360 1260
PLASTERING
CEMENT 12 BAGS 250 100 3000 1200 4200
SAND 1.2 CU.M 1900 760 2280 912 3192
4 STEEL WORKS
TUBULAR 2"X4"X1.2MM 9 PCS 750 375 6750 3375 10125
WELDING ROD 7 KGS 100 50 700 350 1050
CONSUMABLES(HINGES, BODY FILLER ETC.) 1 LOT 3000 1500 3000 1500 4500
6 TINSMITHRY WORKS
0.5MM GI RIBTYPE ROOFING 15 SQM 450 180 6750 2700 9450
PLAINSHEET 2 rolls 700 280 1400 560 1960
TUBULAR 2x2x1.2MM 3 PCS 550 220 1650 660 2310
STAINLESS GUTTER 1 PCS 680 272 680 272 952