0% found this document useful (0 votes)
21 views

Risk Assessment Sheet

1. The risk assessment document evaluates risks associated with HVAC installation work at a workshop and garage in Mussafah, UAE. 2. Key risks include injury from using a grinder (e.g. disc breaking, sparks, fire), electrical power tools (e.g. flying particles, eye injuries, fire), and manual handling of HVAC equipment (e.g. back injuries, sprains, strains). 3. Control measures to reduce risks to low levels include following safety procedures, using proper PPE, inspecting tools, managing cables, and discussing precautions with workers. The operational manager will supervise tasks to monitor safety.

Uploaded by

futurecolor7
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
21 views

Risk Assessment Sheet

1. The risk assessment document evaluates risks associated with HVAC installation work at a workshop and garage in Mussafah, UAE. 2. Key risks include injury from using a grinder (e.g. disc breaking, sparks, fire), electrical power tools (e.g. flying particles, eye injuries, fire), and manual handling of HVAC equipment (e.g. back injuries, sprains, strains). 3. Control measures to reduce risks to low levels include following safety procedures, using proper PPE, inspecting tools, managing cables, and discussing precautions with workers. The operational manager will supervise tasks to monitor safety.

Uploaded by

futurecolor7
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

RISK ASSESSMENT

Building/Property Cli Name of the Company/Contractor Job Location/Unit/Site


FUTURE COLOURS ELECTRO MECHANICAL
WORKSHOP & GARAGE MUSSAFAH
EST.
Sub-Contractor List (Mention NA if no Sub- NA
contractor, otherwise list all sub-contractors)
Work Description HVAC INSTALLATION FOR WORKSHOP & GARAGE
(Brief Scope of Work)

Date (assessment date) Risk Assessed by (To be done by a competent personal from SAGRE/Contractor inline to the task and method statement)
Name Designation / Role Mobile No:
13-03-2024 SANIL KUMAR OPERATIONAL MANAGER 050 123 8159

Assessment Sheet (All control measures shall be aimed to mitigate the risk to Low risk level or to avoid the risk, refer Risk Matrix Below.)
Residual
# Description of Task / Activity Consequences / Risk Exposure Risk Level Decided Control Measures to Implement
Risk Level
 Follow Manual Handling
Procedure.
 Carry out periodical inspection
for machine, disc, extension
cables and connections.
 Don’t use the machine without
 Disc breaking safe guard.
 flying off sparks  Wear safety glasses, safety
Use of grinder for cutting threaded shoes, clothing and safety
1  Fire Medium 2
rod helmet.
 Shock.  Grinding wheels stored on
 Lack of awareness hangers.
 Do not place machine down
before the rotation stops.
 Fire extinguisher is in vicinity.
 Remove all flammable materials
from the working area

Page 1 of 4 QHSE.RA.V01 (Risk Assessment) issued on: 24/06/ 2023


RISK ASSESSMENT

 Flying particles
 Double insulated tools shall be
 Eye injuries used to prevent electric shock.
 Cable management shall be
 Noise Medium carried out to prevent slips, trips 2
and falls.
 Fire  Power supply to be cut off while
repairs or changing
2  Un inspected tools grinding blades.
Use of electrical power tools  All combustibles materials to
 Lack of PPEs be moved from the area or
should be covered with fire
blankets.
 Ear defenders shall be provided
to the operatives for hearing
protection.
 Serviceable, inspected fire
extinguisher to be kept near the
working area.
 All tools and equipment’s
shall be inspected and color
coded b y competent person.

 Back Injuries

 Sprains

 Strains
 Safety
 Precautions with the
 Hernias
workforce to be discussed by
Manual handling of HVAC the supervisor.
3 Equipments, Ducts and  Slips and Trips Low 1
 Supervision to monitor the
accessories
task.
 Work related upper limbs disorder
 Manual Handling training to the
operatives shall be delivered.
 Cuts injuries

 Lack of PPEs

 Ergonomics hazards

Page 2 of 4 QHSE.RA.V01 (Risk Assessment) issued on: 24/06/ 2023


RISK ASSESSMENT

 All scaffolding material to be of sound


materials.
 Training and tool box talk to be
conducted regarding working at
heights.
 Fall from Height.  Only trained scaffolders to be used on
the job.
 Erecting scaffolding  Use appropriate PPE, including
inspected full body harness to be
used. Harness should be hooked in a
 Scaffolding collapse Falling
safe anchor point.
materials  Ladder must be installed on firm &
Working at height using
4 Medium level footing. 2
Scaffolding & Ladder
 Un inspected ladders  Leveling device to be used if
required.
 Straight ladder to be tied on top,
 Do not use the top two steps.
 During working on ladder one person
should hold the ladder
 Always face the ladder and hold on
with both hands when climbing up or
down. Monthly inspection of ladders
to be conducted,
 Tool Box talk training to be
conducted.

Page 3 of 4 QHSE.RA.V01 (Risk Assessment) issued on: 24/06/ 2023


RISK ASSESSMENT

Risk Matrix 4 Medium Medium High High

Probability
3 Low Medium High High Risk Level Occurrence Rank Potential Consequences
1 Very Unlikely (Low) Rarely / infrequently occur
2 Low Low Medium Medium
2 Likely (Low) Likely to occur

1 Low Low Low Medium 3 Possible (Medium) Might Occur


Almost Certain
4 Almost Certain it will occur
1 2 3 4 (High)

Severity

Risk Level Rank Potential Consequences

1 Insignificant (Low) First Aid cases or reversible insignificant environmental impact, or monetary loss is less than or up to AED 500.

2 Marginal (Low) First Aid Cases or reversible minimal environmental impact, or monetary loss is greater than AED 500 to 5,000

Injury/occupational illness resulting restricted work cases or reversible moderate environmental impact or monetary loss between AED 5,000 and
3 Moderate (Medium)
AED 10,000

Death, Permanent disability or irreversible significant environmental impact or monetary loss more than 10,000 or Fire extinguished by external
4 Critical (High)
responder

Page 4 of 4 QHSE.RA.V01 (Risk Assessment) issued on: 24/06/ 2023

You might also like