This document is a cost/revenue analysis form for a construction waste reduction work plan. It lists various materials that will be generated during construction and estimates the costs of disposal versus the potential revenue from salvaging or recycling materials. The totals section would provide an estimated net cost or savings from implementing the work plan.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
60 views1 page
SPC 017419 CWM 5
This document is a cost/revenue analysis form for a construction waste reduction work plan. It lists various materials that will be generated during construction and estimates the costs of disposal versus the potential revenue from salvaging or recycling materials. The totals section would provide an estimated net cost or savings from implementing the work plan.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1
NEOM – 07 TROJENA
Contract No. 4800000606
Contract Name: Design Services-SKI Village Residences MDC 3B-3D Stage SKI Village Residences MDC 3D Stage - RFP for Preliminary Remeasurable Structural Steelwork
FORM CWM-5: COST/REVENUE ANALYSIS OF CONSTRUCTION WASTE REDUCTION WORK PLAN
TOTAL TOTAL EST. QUANTITY OF EST. COST OF REVENUE FROM REVENUE FROM LANDFILL HANDLING AND NET COST COST OF MATERIALS DISPOSAL SALVAGED RECYCLED TIPPING FEES TRANSPORTATION SAVINGS OF MATERIALS DISPOSAL (VOL. OR MATERIALS MATERIALS AVOIDED COSTS AVOIDED WORK PLAN WEIGHT) (B) (D) (E) (F) (G) (H = D+E+F+G) (C = A x B) (A) Packaging: Cardboard Packaging: Boxes Packaging: Plastic Sheet or Film Packaging: Polystyrene Packaging: Pallets or Skids Packaging: Crates Packaging: Paint Cans Packaging: Plastic Pails Site-Clearing Waste Masonry or CMU Lumber: Cut-Offs Lumber: Warped Pieces Plywood or OSB (scraps) Wood Forms Wood Waste Chutes Wood Trim (cut-offs) Metals Insulation Roofing Joint Sealant Tubes Gypsum Board (scraps) Carpet and Pad (scraps) Piping Electrical Conduit Other:
Document No. 07-001100-4800000606-DAH-STR-SPC-000001– Rev. B