Tpl-Pml3-An-901 R0

This document provides details for erecting a precast concrete unit for a flyover, including: 1. Plans and sections showing the beams, rebar supports, and jacking equipment used. 2. A summary table listing the materials needed for one precast unit, including the weight of each component and total weight. 3. Notes about traffic control during erection and verifying the center of gravity location before lifting.

Uploaded by

suvra
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
67 views1 page

Tpl-Pml3-An-901 R0

This document provides details for erecting a precast concrete unit for a flyover, including: 1. Plans and sections showing the beams, rebar supports, and jacking equipment used. 2. A summary table listing the materials needed for one precast unit, including the weight of each component and total weight. 3. Notes about traffic control during erection and verifying the center of gravity location before lifting.

Uploaded by

suvra
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Original Sheet Size A3

TYP. CROSS SECTION


OF BEAM-B3
TYP. CROSS SECTION
OF BEAM-B2

PLAN TYP. DETAIL OF REBAR SUPPORT FOR


TYP. DETAIL OF 2-ISMB BEAMS INSTEAD OF TACK WELD
(VIEW SHOWING MAIN BEAM-B1 & CRIB)

· SIDE SHIFTING JACK (SAME JACK AS USED IN


FLYOVER CENTRAL UNIT ERECTION) :-

4 4
3 3
HYDRAULIC PUSH PULL JACK
(FOR 1 NO. PRECAST UNIT) :-

TYP. CROSS SECTION OF


MAIN BEAM-B1
2
SECTION `2-2'
TYP. CROSS SECTION AT
DETAIL `D1' SUMMARY OF MATERIAL (ONE PRECAST UNIT) SUPPORT LOCATION OF B1
WEIGHT IN KG. REMARKS'
SR. NOS
DESCRIPTION REF. DRG.
NOS. REQD. UNIT TOTAL · DURING ERECTION NO TRAFFIC IS ALLOWED
WT. WT. NO.
BELOW.
· SUITABLE TRAFFIC DIVERSION PLAN NEEDS TO
HYDRAULIC JACK :- BE IN PLACE.

KINDLY VERIFY LOCATION OF CG FROM


PERMANENT STRUCTURE DESIGNER, IN CASE CG
IS NOT MATCHING WITH DRAWING REVERT BACK
TO DESIGN TEAM.

NOTES:
TOTAL WEIGHT 17419.7

SECTION `3-3' CRIB, WALKWAY & BRACKET


SECTION `4-4' QUANTITY NOT INCLUDED.

GENERAL ARRANGEMENT OF STAGING FOR


PUNE METROPOLITAN REGION DEVELOPMENT AUTHORITY
ERECTION OF FLYOVER PRECAST SIDE ARM
DEVELOPMENT OF PUNE METRO LINE III
(HINJEWADI - SHIVAJINAGAR) PMRDA
PROJECT ON DBFOT BASIS Maharaja Sayaji Gaikwad
SAM SSE AAG SN
Udyog Bhawan, Aundh,
R0 FIRST ISSUE 01/12/2023 Pune, Maharashtra 411007

01/12/2023 AS SHOWN TPL-PML3-AN-901 R0