ZB House - Reinstatement Works

L.Gono Construction submitted a quotation for reinstatement works at ZB Bank's House property including demolitions, tiling, ceilings, plumbing, painting, and glazing works. The quotation totals ZWL$4,751,349.25 which includes a sub-total of ZWL$4,149,650 for the various works and a 14.5% value added tax of ZWL$601,699.25. The works involve removing carpets, partitions and signage, installing new floor tiles, ceilings, sinks, toilets and doors with glass, and painting walls, steel bars and columns.

Uploaded by

lchamatowa
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
28 views2 pages

ZB House - Reinstatement Works

L.Gono Construction submitted a quotation for reinstatement works at ZB Bank's House property including demolitions, tiling, ceilings, plumbing, painting, and glazing works. The quotation totals ZWL$4,751,349.25 which includes a sub-total of ZWL$4,149,650 for the various works and a 14.5% value added tax of ZWL$601,699.25. The works involve removing carpets, partitions and signage, installing new floor tiles, ceilings, sinks, toilets and doors with glass, and painting walls, steel bars and columns.

Uploaded by

lchamatowa
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

DATE: 19 October 2021

ZB BANK
21 Natal Road
Avondale
Harare

REF: ZB HOUSE - REINSTATEMENT WORKS


L.Gono Enterprises (PVT) Ltd t/a as L.Gono Construction would like to take this
opportunity to submit its supply and fix quotation for ZB House Reinstatment works
ITEM DESCRIPTION UNIT QTY AMOUNT

DEMOLITIONS

1 Removal of carpets and dispose offsite m2 200 350.00 70,000.00

Removal of timber partitions,


2 countertops, tellers counters m2 415 500.00 207,500.00

3 Removal of flagpole no 1 15,000.00 15,000.00

4 Removal of mantrap no 1 75,000.00 75,000.00

5 Breakup wall and make good m2 8 1,500.00 12,000.00

6 Removal of dry wall partition m2 83 700.00 58,100.00

Removal of ZB BANK Signage


7 outside no 2 85,000.00 170,000.00

TILING

1 600x600mm Porcelian floor tiles m2 250 6,300.00 1,575,000.00

2 Granito floor tiles m2 116 6,500.00 754,000.00

CEILINGS
Provide new ceiling including
aluminium strips and kaylite ceiling
1 tiles m2 50 7,450.00 372,500.00

Replace damaged ceiling tiles


2 600x600mm no 50 5,500.00 275,000.00

PLUMBING

1 Replace Closed couple water closet no 3 62,700.00 188,100.00

2 Double bowl stainless steel sink no 1 70,700.00 70,700.00

3 Sink mixer no 1 11,000.00 11,000.00

PAINTING

1 Painting to walls m2 120 750.00 90,000.00

2 Painting to steel bars item 1 65,000.00 65,000.00

3 Painting collumns m2 11 750.00 8,250.00

GLAZING

Aluminium door 1875x2150mm,


1 including 6mm laminated glass no. 1 110,000.00 110,000.00

2 6mm laminated glass m2 3 7,500.00 22,500.00

SUB-TOTAL 4,149,650.00

ADD 14.5% V.A.T 601,699.25

GRAND-TOTAL ZWL$ 4,751,349.25