Form Rfit

This document is a request for inspection and testing for work done by PT. Nusa Raya Cipta, Tbk as part of the Bekasi Mixed Use Development project. It details the inspection details including discipline, location, and relevant documentation. Signatures are required from related disciplines and subcontractors to confirm coordination of the work. The inspection will be performed, reviewed by quality managers, and approved by the construction manager and project manager.

Uploaded by

Rafli azmi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
33 views

Form Rfit

This document is a request for inspection and testing for work done by PT. Nusa Raya Cipta, Tbk as part of the Bekasi Mixed Use Development project. It details the inspection details including discipline, location, and relevant documentation. Signatures are required from related disciplines and subcontractors to confirm coordination of the work. The inspection will be performed, reviewed by quality managers, and approved by the construction manager and project manager.

Uploaded by

Rafli azmi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1

PT.

GRAMA PRAMESI SIDDHI

BEKASI MIXED USE DEVELOPMENT

REQUEST FOR INSPECTION / TESTING

BID PACKAGE : LOA-A030 CONTRACTOR: PT. NUSA RAYA CIPTA, Tbk

RFIT No: BMD-NRC-RFIT-0 - Rev.No. Date:


DISCIPLINE : INSPECTION DETAILS :

General/Site HVAC Inspection Date :

Civil Drainage System Relevant MS No: BMD-NRC-MS-

Structures Fire Fighting System Relevant ITP No: BMD-NRC-ITP-

Architectural AV and Telecommunications Shop Drawing No./Rev: BMD-SD-

Mechanical Wall and Floor Finishing Inspection Location:

Electrical Landscape Subcont. Name (If any):

Plumbing Other ……………..


Detailed Description of Works to be Inspected:

ISSUANCE :
WE CONFIRM THAT THE WORK TO BE INSPECTED HAS BEEN COORDINATED WITH ALL RELATED DISCPLINES AND SUB-CONTRACTORS:

Related Discipline: Civil/Architect: Structural: Electrical: Mechanical: External Works: QA/QC: HSE:

Signature: _______ _______ _______ _______ _______ _______ _______

Issued By : ……………………………...... (NSC/DC/Subc.)

PM/DPM/SM : Signature : Date:


Q/C STATEMENT :

INSPECTED BY:

Name : ………………...……………(Q/C PT. NRC) Signature : Date:

APPROVED BY QA/QC MANAGER :

Name : Otty SYD Signature : Date:


APPROVED BY QA/QC MANAGER (GPS) :

Name : Makno Basoeki Signature : Date:


IF THERE IS A NCR PLEASE REFER TO NCR NUMBER AND SNAGGING LIST REFF. No. ……………………………………………….

RECEIVED AND INSPECTED BY CM / GPS : Date :

APPROVED APPROVED W/ MINOR COMMENTS REVISE & RESUBMIT REJECTED

Inspector : Initials : Signature : Date :

Const. Manager : Initials : Signature : Date :

Project Manager : Name : Irene S Signature : Date :

RECEIVED BY CONTRACTOR :

Name : Signature : Date :


Submit at least 24 hours before its commencement.