0% found this document useful (0 votes)
28 views

Proma hw4

The document provides additional data for items B, C, and D including their lot sizes, lead times, and beginning inventory amounts. It also shows projected inventory levels, requirements, receipts, and order plans for each item over several periods.

Uploaded by

Hoang Thao Nhi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
28 views

Proma hw4

The document provides additional data for items B, C, and D including their lot sizes, lead times, and beginning inventory amounts. It also shows projected inventory levels, requirements, receipts, and order plans for each item over several periods.

Uploaded by

Hoang Thao Nhi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 5

The table below shows additional data (master file) for the items B, C, and D.

A B C D
Lot size L4L 800 L4L
Lead-time 1 2 1 1
Beginning inventory 0 0 120 50
100 week 300 week
Scheduled receipts none none
2 2
Item A LLC: 0 Period
LOT SIZE: L4L 1 2 3 4 5
Gross Requirements 0 0 50 0 250

Scheduled Receipts 0
Projected on Hand 0 0 0
Net Requirements 50 250
Planned Order Receipts 250
Planned Order Releases 250

Item B(2) LLC: 0 Period


LOT SIZE: L4L LT:2 1 2 3 4 5
Gross Requirements 100 500
Scheduled Receipts 100
Projected on Hand 0 100 0 0
Net Requirements 0 500
Planned Order Receipts 500
Planned Order Releases 500

Item C LLC: 0 Period


LOT SIZE: 800 LT: 1 1 2 3 4 5
Gross Requirements 50 250
Scheduled Receipts 300
Projected on Hand 120 420 370 120
Net Requirements
Planned Order Receipts
Planned Order Releases

Item C(2) LLC: 0 Period


LOT SIZE: 800 LT: 1 1 2 3 4 5
Gross Requirements 200 1000
Scheduled Receipts 300
Projected on Hand 120 420 20
Net Requirements 780
Planned Order Receipts 800
Planned Order Releases 800

Item D LLC: 0 Period


LOT SIZE: L4L LT:1 1 2 3 4 5
Gross Requirements 100 500
Scheduled Receipts
Projected on Hand 50 0 0
Net Requirements 50 500
Planned Order Receipts 50 500
Planned Order Releases 50 500
6 7
0 150

0
150
150
150

6 7
300

0
300
300
300

6 7
150

770
30
800
800

6 7
600

220
580
800
800

6 7
300

0
300
300
300