Electrical Isolation Work Permit
Electrical Isolation Work Permit
Project/Location:
Date of Issue:
Electrical Isolation Permit / Electrical Permit to work
(A) AUTHORIZATION (ELECTRICAL ISOLATION) Electrical isolation checklist overleaf for completion by Electrical
Competent person. Electrical isolation for the above equipment has been completed and that the points isolated are: -
(Note: 1. Both sections must be completed 2. Mention other Safety Precautions if any. )
COMPETENT PERSON
(B) ACCEPTANCE: Performing Supervisor Sign, for ensuring job site Supervision, Acceptance of safe Isolation,
Requirements & Precaution needed for safe work
Name Reg. No. Signature Date
PERMIT APPLICANT
(D1) Permit Issuer: I have satisfied my self that location / Equipment covered by this permit and all related permits are
safe for re-commissioning and that the supply can be restored electrical
COMPLETION /CANCELLATION
(D2) Electrical Competent Person: Electrical Supply to the equipment has been restored by reversal of above isolation
from the new substation and warning tags removed.
Name Reg. No. Signature Date
(D3) Permit Issuer: The equipment is now re-commissioned satisfactorily and this permit is cancelled.
Name Reg. No. Signature Date
Note: New Permit must be issued for any change in condition or cancellation. The permit should not be Altered or Amended.
Page 1 of 2
Form No : / Rev0
Project/Location:
Date of Issue:
Electrical Isolation Permit / Electrical Permit to work
Page 2 of 2