0% found this document useful (0 votes)
1K views2 pages

MCS Installation Handover Checklist Solar PV

The document outlines the requirements for a solar PV installation handover pack, including providing the MCS Certificate, a paid invoice, warranty details, maintenance requirements, a signed certificate from the installer confirming system details and performance estimates, an operation and maintenance manual with system data, test results, commissioning data, operation and maintenance procedures, and installer contact details. The handover pack ensures the homeowner receives essential documentation about the installed solar PV system.

Uploaded by

James K. Bitok
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
1K views2 pages

MCS Installation Handover Checklist Solar PV

The document outlines the requirements for a solar PV installation handover pack, including providing the MCS Certificate, a paid invoice, warranty details, maintenance requirements, a signed certificate from the installer confirming system details and performance estimates, an operation and maintenance manual with system data, test results, commissioning data, operation and maintenance procedures, and installer contact details. The handover pack ensures the homeowner receives essential documentation about the installed solar PV system.

Uploaded by

James K. Bitok
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

SOLAR PV INSTALLATION

INSTALLER HANDOVER CHECKLIST

Items required in the handover pack

MCS Certificate

Copy of Invoice – marked ‘paid in full’

Insurance Backed Warranty details

The maintenance requirements and maintenance services available

A certificate signed by the Installer containing the following as a minimum:


• A statement confirming that the solar PV system meets the requirements of this Standard
• Client name and address
• Site address (if different)
• Installer name, address etc.
• List of key components installed
• Estimation of system performance

Operation & maintenance manual should include the following:


• System Data
-- A copy of the basic system information
-- A single line electrical schematic
-- A copy of the manuals and data sheets for the following system components:
• PV modules
• Inverter
• Other relevant product documentation

• Test Results and Commissioning Data


-- A copy of the test and commissioning documentation
-- Table of inverter protection settings (under/over voltage, under/over frequency, etc.)

• Operation & Maintenance Data


-- Procedures for verifying correct system operation
-- A checklist of what to do in case of a system failure
-- Shutdown/isolation and startup procedures
-- Maintenance & cleaning recommendations (if any)
-- Considerations for any future building works adjacent to the PV array (e.g. roof works) to
avoid potential damage or shading of the PV array
Installer Contact Details

Installer Name:

Contact Number:

Certification Body:

Consumer Code:

MCS HELPDESK TEAM


If you need advice or have unanswered questions regarding the certification of your installation,
the dedicated MCS Helpdesk team would be happy to assist.
Call the Helpdesk on 0333 103 8130, email: [email protected] or visit www.mcscertified.com

You might also like