Open navigation menu
Close suggestions
Search
Search
en
Change Language
Upload
Sign in
Sign in
Download free for days
0 ratings
0% found this document useful (0 votes)
16 views
Discrimination 2
Uploaded by
manoji
AI-enhanced title
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content,
claim it here
.
Available Formats
Download as PDF or read online on Scribd
Download now
Download
Save Discrimination-2 For Later
Download
Save
Save Discrimination-2 For Later
0%
0% found this document useful, undefined
0%
, undefined
Embed
Share
Print
Report
0 ratings
0% found this document useful (0 votes)
16 views
Discrimination 2
Uploaded by
manoji
AI-enhanced title
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content,
claim it here
.
Available Formats
Download as PDF or read online on Scribd
Download now
Download
Save Discrimination-2 For Later
Carousel Previous
Carousel Next
Save
Save Discrimination-2 For Later
0%
0% found this document useful, undefined
0%
, undefined
Embed
Share
Print
Report
Download now
Download
You are on page 1
/ 8
Search
Fullscreen
Categories > Case Studies > Equipments > Battery > Cable > Capacitor > Circuit Breaker > Generator > Motor > Solar inverters > Starter > Transformer POWER PROJECTS powering the future Home Services v Projects v = Blog. Tre Home » LOW-VOLTAGE RELEASE ea, 1905.50 MAS Main ncomae now ont LV - RELEASE + The Low Voltage circuit breakers (
Power System * It is consisting of Bi-metal strip which converts a temperature Studies change (because of overload) into mechanical displacement (disconnect continuity of circuit) > Are + Bi-metal strip is inversely proportional to the intensity of the Flash current. Study + If current goes beyond the normal operating value, it will release > Load the lock which holding the contacts. Flow ; 2. Magnetic release- Protect from Short circuit current study + Itis a latching mechanism with a strong holding force and a > Relay quick, consistent, and dependable release. Coordination * Bimetals and similar thermal elements in thermal magnetic trip Stud’ 2 . ucy units react directly to 2R heating. > Short 3. Electronic release- Protect from both overload and short-circuit Circuit current, study ELECTRONIC TRIP UNIT (ETU) > Traction Power ELECTRONIC TRIP UNIT (ETU) System > Uncategorized Tr Tong LONG TIME: Its only for Over current protection and its trips on sustained overcurrent to protect conductors and other equipment. The time delay provided allows intermittent or cyclical loads above the pickup current to be carried without interruption. + LT Pick up Toerload Marga NST MEG LTPickwp= FullLoed AmpsX (garqpaer voltage allowed XTolerance Fact@® PoweER PROJECTS powering the future Home Services v Projects v = Blog. Tre Tolerance (-ve/min) = -10% = 0.9 Phase Ground (AlLong- Time LT Pickup, NOTE: + The LT pick up set point will not guarantee that it will pick up between tolerance levels (min to max), but it will definitely pick up after the Max tolerance level or holding current. Example: The image shows the characteristic curve of ABB SACE PR2I2, from 495.8 to 624 Amps, we cannot guarantee it will pick up between these amps but definitely it will pick up at 624.01 Amps. Minimum Pick-up current 4955.4) 520.2 5—+ (-ve / Min tolerance = 3% ) Maximum Holding Current 4A) 200.1 ¢ (4ve / Max tolerance = 13% ) CBE + LT Band: Time can be either “Fixed” or “Adjustable” depends on the make and model of the breaker.POWER PROJECTS powering the future Home Services v Projects v = Blog. Tre FEEDER SHORT TIME: + Itis for Short-Circuit Protection and providing Backup for a downstream (main protection) in which opening time in seconds or tenth of seconds. = Overcurrent might be in the range expected in the case of a motor locked rotor or an arcing ground fault. Time delay in this region allows for starting and inrush transinet currents or for selective coodination with supply side or load side devices. + Short Time protection can perform with (It = IN) or without (Instantaneous, *t = OUT) time delay. + To avoid maloperation, use -ve tolerance for upstream (load side) and +ve tolerance for downstream (Incomer side) « In some cases, short time also can use it as Instantaneous by selecting *t = OUT.POWER PROJECTS powering the future Home Services v Projects v = Blog. Tre LONG PICKUP, |SHORT PICKUP| \ (Back up protection) ) LONG PICKUP, INSTANTANEOUS 5 ne (Mainprotection)’ “a Motor eo00 Anes com amps tt z ST Petup 15) zy $7 8and 8S st 8204/62 a + ST PICK UP: ‘Actual Pick up = (Continuous current > [Highest starting current orInrush current] Overload Margin X Safety Margin * Giintinder voltage allowed XTeleraxce Factor! + ST BAND: Set minimum discrimination as per IEEE 242 which is shown at end of this article. INSTANTANEOUS: + Instantaneous enable at End equipments like Motor and capacitor ete.@® PoweER PROJECTS powering the future Home Services v Projects v = Blog. Tre + fit is Motor then Locked rotor current with Asymmetrical factor is enough and other load like capacitor then starting current with safety margin & Maximum allowable overvoltage need to be considered. Tolerance factor should be considered for any kind of load. + Asymmetrical factor means there is a possibility during breaker closing time current will not be in sinusoidal form. It is the combination of symmetrical component and direct current component of the current. + It has no intentional time delay and its maximum time delay in milliseconds. GROUND: GROUND PICK UP: + For LV Ground pickup, 20% of full load amps is required because LV loads are maximum unbalanced otherwise 10% of FLA is enough. Pick up= 025 Fullload Amps * GROUND BRAND: + Set minimum discrimination of 100ms for motor followed by 200ms for back up protection. * By enabling Pt = INwill get Inverse curve and by keeping P*t=OUT it is performing as Definite time. + See the curve below, when it is Definite time 340A pick up at 80ms and at Inverse curve same 340A pick up at 1060ms.POWER PROJECTS pomeaiagutNepiarecd Home Services v — Projects v = Blog. Tre MINIMUM COORDINATION TIME INTERVAL: To ensure correct selective operation and to avoid maloperation there should be proper coordination between curves of different protective devices. Upstream peu ruse | Pow-ottge | gtthanal | State ray — Fuse cs’ cs 0228 012s Low-voltage circuit breaker cs cs 022s | o12s Heewomeshanical ey Saye) [020s [020; [030s | 020s Stately Bee) 020s [02s [030s [020s Cs® — clear space between curves with upstream minimum- melting curve adjusted for pre-load. CS‘ — some manufacturers may also recommend a safety factor. Santhakumar Sampath — Project Engineer November 18th, 2022 | | Comment swemnsanice — (#) (B) (in) (8) (€) @) ~POWER PROJECTS omerinanehepraiece Home Services Projects = Blog. Tr Comment. Name (required) Email (required) Website (Save my name, email, and website in this browser for the next time | comment. CONNECT WITH © Copyright 2012 - 2024 | Power Projects India | All Rights Reserved
You might also like
Theory of Circuit Breaking
PDF
100% (1)
Theory of Circuit Breaking
45 pages
Chapter 3 PS, PSM, Tms
PDF
100% (2)
Chapter 3 PS, PSM, Tms
32 pages
Discrimination 1
PDF
No ratings yet
Discrimination 1
17 pages
LV Release Coordination - by Power Projects
PDF
No ratings yet
LV Release Coordination - by Power Projects
17 pages
Substation Components
PDF
100% (2)
Substation Components
60 pages
MOTOR PROTECTION
PDF
No ratings yet
MOTOR PROTECTION
10 pages
Application of Undervoltage Protection To Critical Motors PDF
PDF
No ratings yet
Application of Undervoltage Protection To Critical Motors PDF
6 pages
Power System Protection
PDF
No ratings yet
Power System Protection
37 pages
R6121e Mopn 0102
PDF
No ratings yet
R6121e Mopn 0102
14 pages
Over Current Protection For The Transformers
PDF
No ratings yet
Over Current Protection For The Transformers
9 pages
LV Electrical System Relay, Protection and Control1
PDF
No ratings yet
LV Electrical System Relay, Protection and Control1
20 pages
Motors AEs
PDF
No ratings yet
Motors AEs
74 pages
6d Motor Protection Lecture.325
PDF
No ratings yet
6d Motor Protection Lecture.325
13 pages
Ia 13
PDF
No ratings yet
Ia 13
112 pages
Protection system
PDF
No ratings yet
Protection system
13 pages
ABB No.26 - Removed
PDF
No ratings yet
ABB No.26 - Removed
8 pages
Eee4227: Power System Protection Term: Mid-Term
PDF
No ratings yet
Eee4227: Power System Protection Term: Mid-Term
41 pages
Protection Study Approval
PDF
No ratings yet
Protection Study Approval
18 pages
18-Unit 7 - Power System Protection-25-04-2024
PDF
No ratings yet
18-Unit 7 - Power System Protection-25-04-2024
29 pages
Setting Calculation - Protection & Coordination - INITIAL
PDF
No ratings yet
Setting Calculation - Protection & Coordination - INITIAL
4 pages
Lecture 2 Version 1 EEE 471 Switchgear and Protection - NMKHAN
PDF
No ratings yet
Lecture 2 Version 1 EEE 471 Switchgear and Protection - NMKHAN
12 pages
Etibreak New 2024
PDF
No ratings yet
Etibreak New 2024
18 pages
Applications of Thyristors
PDF
No ratings yet
Applications of Thyristors
31 pages
Eee4227: Power System Protection Term: Mid-Term
PDF
No ratings yet
Eee4227: Power System Protection Term: Mid-Term
41 pages
For Training - June 2015
PDF
No ratings yet
For Training - June 2015
59 pages
LV Motor
PDF
100% (1)
LV Motor
56 pages
Power Systems Protection Course: Al-Balqa Applied University
PDF
No ratings yet
Power Systems Protection Course: Al-Balqa Applied University
28 pages
IEEE PQ Case-1
PDF
No ratings yet
IEEE PQ Case-1
33 pages
The Basics of Circuit Breaker Tripping Units - EEP
PDF
No ratings yet
The Basics of Circuit Breaker Tripping Units - EEP
7 pages
Power Line Disturbances
PDF
No ratings yet
Power Line Disturbances
62 pages
Motor Protection
PDF
No ratings yet
Motor Protection
8 pages
Shortcircuit ANSI
PDF
No ratings yet
Shortcircuit ANSI
48 pages
Lecture-31-32_Induction Motor
PDF
No ratings yet
Lecture-31-32_Induction Motor
39 pages
Starting and stopping of DC link
PDF
No ratings yet
Starting and stopping of DC link
37 pages
Relay Protection Electricial Safety Chapter 7
PDF
No ratings yet
Relay Protection Electricial Safety Chapter 7
91 pages
Unit 4 (4.1) Protection Schemes
PDF
No ratings yet
Unit 4 (4.1) Protection Schemes
55 pages
Protective Relay Basics
PDF
No ratings yet
Protective Relay Basics
41 pages
ABB No.26 - Removed
PDF
No ratings yet
ABB No.26 - Removed
8 pages
Power Systems CH - 9 (Zub)
PDF
No ratings yet
Power Systems CH - 9 (Zub)
37 pages
Commissioning, Operation & Maintenance of Low Voltage Air Circuit Breakers
PDF
No ratings yet
Commissioning, Operation & Maintenance of Low Voltage Air Circuit Breakers
8 pages
Electrical Power Systems Quality Lecture 2
PDF
No ratings yet
Electrical Power Systems Quality Lecture 2
43 pages
M4_Scope and Safety Measures.pptx
PDF
No ratings yet
M4_Scope and Safety Measures.pptx
34 pages
Unit - Ii Switching Transients
PDF
100% (5)
Unit - Ii Switching Transients
42 pages
C60-DC-Circuit-breakers1
PDF
No ratings yet
C60-DC-Circuit-breakers1
18 pages
Hacettepe University Electrical-Electronics Engineering Summer Practice Report
PDF
No ratings yet
Hacettepe University Electrical-Electronics Engineering Summer Practice Report
48 pages
A How To Guide To Synchronous Motor Protection
PDF
No ratings yet
A How To Guide To Synchronous Motor Protection
5 pages
Lecture 06 - Protective Relay PDF
PDF
100% (1)
Lecture 06 - Protective Relay PDF
25 pages
Selective Coordination of Low Voltage Circuit Breake With Other Protective Device
PDF
No ratings yet
Selective Coordination of Low Voltage Circuit Breake With Other Protective Device
11 pages
(DMPI) Catalog EN 202003
PDF
No ratings yet
(DMPI) Catalog EN 202003
28 pages
MVandHVcoordination
PDF
No ratings yet
MVandHVcoordination
35 pages
Relay Setting Calculation For Motors
PDF
No ratings yet
Relay Setting Calculation For Motors
12 pages
Motor Protection
PDF
No ratings yet
Motor Protection
47 pages
Sag Swell
PDF
No ratings yet
Sag Swell
149 pages
PEC Reviewer 2
PDF
No ratings yet
PEC Reviewer 2
4 pages
The Basics of Circuit Breaker Tripping Units PDF
PDF
No ratings yet
The Basics of Circuit Breaker Tripping Units PDF
6 pages
EE Sem 8 Syllabus
PDF
No ratings yet
EE Sem 8 Syllabus
4 pages
Project Document - HQFL1086 REV A
PDF
No ratings yet
Project Document - HQFL1086 REV A
2 pages
GSES-Woo20350
PDF
No ratings yet
GSES-Woo20350
1 page
Up Down Wall Light Data SheetV1.1
PDF
No ratings yet
Up Down Wall Light Data SheetV1.1
1 page
NEO-CUSF-6041-EL-DWG-1_[00]-Typical Trench Section MV Cables Sheet 1 of 4 (1)
PDF
No ratings yet
NEO-CUSF-6041-EL-DWG-1_[00]-Typical Trench Section MV Cables Sheet 1 of 4 (1)
1 page
Protection_Coordination_Report_Misc. calculations_LV Network
PDF
No ratings yet
Protection_Coordination_Report_Misc. calculations_LV Network
4 pages
Online Green Hydrogen plant Design
PDF
No ratings yet
Online Green Hydrogen plant Design
4 pages
Schneider Electric - Acti9-C120 - A9N18365
PDF
No ratings yet
Schneider Electric - Acti9-C120 - A9N18365
4 pages
415W Yingli - 25 y Product Warranty - DS - YLM-J 108 CELL M10 - 37e - 30mm - AU - EN - 20210922 - V04 - 25YR
PDF
No ratings yet
415W Yingli - 25 y Product Warranty - DS - YLM-J 108 CELL M10 - 37e - 30mm - AU - EN - 20210922 - V04 - 25YR
2 pages
AN AS AS: Catalogue Number
PDF
No ratings yet
AN AS AS: Catalogue Number
27 pages