CQI IRCA Audit Report
CQI IRCA Audit Report
g Power Plant Systems Global Field Operations Thermal Site Management and Quality Audit
Opening Meeting
Date:
The opening meeting is to discuss the Audit, areas to be audited, limitation of the auditor and review any questions the field personnel may have.
All rows are to be addressed with data input applicable to you observations in each section audited.
You are required to input the numeric data in Boxes C, D, E & F. Only one box per line can have data input. More than one box with data will create errant scoring.
To the auditor: Ensure Audit Sections 1.0 through 11.0 not audited are left blank.
The numeric data to input is the number listed in the column header as described below in the Audit Legend.
F N/A: Not Applicable to the audit. Description /Activity not being performed,
not observed or not is GE's or the Company being audited contract scope. 1
H Target Date to Close Improvement: Unless otherwise agreed upon with the Auditor, all improvements are to be closed within 5 business days
I Issue Corrected, Inspected & Accepted by GE. The GE Site Manager per the Verification Manager is responsible for final acceptance.
J Date Closed: The date the issues was corrected and accepted by the site GE Site Manager per the GE Verification Manager.
SCORING
1 Section Audit Score is based on 100% percentile of each section with each line item rated as an equal portion of 100% of the section audited.
2 Each section is individually rated with a total rating score given to the project Audit Rating Score listed on the Audit Summary .
3 No extra credit is given. Below is a summary of color code for audit ratings. Ratings in YELLOW below 95% are considered areas of opportunity for improvement.
1 of 20
PPS-GFO Thermal Site Q Audit
AUDIT SUMMARY
Target Closure
Section Reference ISSUE Recommended Resolution Responsible Party Date Closed
Date
1.Quality Program - General
2.Document Control
3.Nonconformance
4.Material Control
5.Field Erected Tanks
6.Structural Steel
7.Insulation & Coatings
8.NDE & Pressure Tests
9.Mechanical & Piping
10.Civil
11.Electrical
Closing Meeting
Date:
The closing meeting is to discuss the results of Audit, findings, closure dates and that is required to close findings.
2 of 20
This Section Audited (Y=Yes, N=No) Y To Audit Summary
1.7 Are Procedures in place for all functions and disciplines where needed? 1
1.9 Do the forms being used to control work, comply with GE Requirements? 1
Is there evidence that site staff personnel are qualified to do their work.
1.10 1 New Mechanical Inspector who joined 3/3 has TWI CSWIP 3.1 qualification.
(Check resumes or certifications.)
1.12 Is there a Request For Information (RFI) system in place? 1 External and Internal RFI system is in place.
1.13 1 new changes has not been implemented in Org chart. It is not posted.
Is the site organization chart posted and is the correct edition?
Separate list used to track different discipline equipments. There is no
1.14 Is there an M&TE program in Place? 1
single master list to track.
PG-145 selected as example, calibration certificate reviewed and found
1.15 Are M&TE calibrated records current 1
current.
Is there evidence and out of calibrated M&TE is addressed and a corrective It is not documented how to out of calibrated Measuring device to be
1.16 1
action is in placed? handled.
Is there a procedure to assess and document personnel competency on an No procedure is available to document personnel competency on annual
1.21 1
annual basis? basis.
Is there an escalation process by which personnel that do not pass
1.22 1 there is no escalaltion process available, no process defined
competency are retrained etc.?
Is there a list to track Quality personnel certificates and expiration dates ? If
1.23 1 There is no list to track quality personnel certificates
yes how frequently updated, where it is described.
Does subcontractor perform internal audits ? If yes, what were the last audits
1.24 1 No internal audit performed for this project.
findings.
Acc
Needs to
Acc With N/A
Improve
Comment
Totals 8 10 3 1
This Section Audited (Y=Yes, N=No) Y To Audit Summary
Do personnel involved in document transmittals and issuances know the Site DCC is not aware that there is Document
2.2 1
procedure? Control procedure available (company wide)
Do personnel (Site Foremen, Engineers, etc.) involved in receiving document site personnel know company wide document
2.3 1
issuances know the procedure? control procedure.
2.9 Does the drawing index list current revisions matching issued drawings? 1
Are drawings stamped by set and filed orderly either electronically or white 26909-CE-A1-003 selected randomly. Hard copy
2.10 1
paper? shown for 2 transmittals.
Document Control Log is available but it does not
2.11 Is there a document transmittal to field process in place with a issue log? 1
have document control number.
26909-CE-A1-003 has 2 revisions. Rev 00 and rev
Are outdated, superceded drawings identified, marked superceded, void etc.
2.12 1 01. rev 00 has not been stamped as
and removed from the work area?
superceeded/void/etc
Were there any drawings with the wrong revision or stamped superceded,
2.13 1
observed in the offices during this audit?
Totals 5 6 4 1
This Section Audited (Y=Yes, N=No) Y To Audit Summary
Is there an NCR log and is it current? Are non conformities recorded and NCR/OBS log is available but it does not have
3.3 1
transmitted according to process defined ? document control number
Is the disposition of NCRs in accordance with the Quality Manual/Procedure'? NCR distribution not described. At site distribution
3.4 1
performed via emails.
Is there an adequate method for closing NCRs? corrective and preventing action procedure (14)
3.5 1 available. But this is not site level document. It is
company level
Are corrective actions being reviewed/inspected and verified correct to close Internal review performed but not described in
3.6 1
NCRs? procedure.
Is there documented and physical evidence the NCR and corrective action
NCR-SS/GTG1-8/0001/2019 reviewed and found
3.7 process/procedure is working? (Walk an NCR through the process to the 1
acceptable
rework to verify)
Is the disposition of NCRs in accordance with the Quality Manual ? NCR-SS/GTG1-8/0001/2019 reviewed and found
3.8 1
acceptable
Is the timeline closure recorded ?
3.9 1 NCR log does not contain timeline information
Acc
Needs to
Acc With N/A
Improve
Comment
Totals 2 4 4 0
This Section Audited (Y=Yes, N=No) Y To Audit Summary
Is Material stored on supports, out of mud and away from vehicle traffic?
4.5 1
Is a nonconforming Product procedure in place and is it being performed Control of non conforming product procedure (13) for
4.8 accordingly? 1 company wide is available. However it is not being followed
at site
Is there a plan for inspecting received materials and equipment? handling, storage, packing and delivery procedure (15) item
4.9 1
15.3.3. descrined receiving plan.
Does the receiving plan include climate controlled storage and control for handling, storage, packing and delivery procedure (15) item
4.10 1
instruments such as accelerometers, chart recorders, and purge gages? 15.3.7. dedescribed AC storage
Is there a plan in place for protection from inclement weather?
4.11 1 Yanbu is subjected to inclement weather
Are small items such as 2” pipe fittings being stored in bins, shelves, etc. for
4.14 1
control?
Are small items storage areas readily identified with the material
4.15 1
nomenclature for easy identification?
Are heaters used, wired and running for motors over 5 hp where required?
4.16 1
Are the material control (RIR forms and logs, Shipping dockets, Issuance to
4.20 field, OS&D, Maintenance, locator map, etc.) in good condition and filed in 1
an orderly manner for easily identification.
Acc
Needs to
Acc With N/A
Improve
Comment
Totals 8 3 2 7
This Section Audited (Y=Yes, N=No) Y To Audit Summary
Does the plan have a bolt layout diagram to identify the bolts inspected?
6.3 1 No plan no layout diagram
Are inspections of being performed by certified inspectors Civil inspector is performing inspection activities,
6.4 1 he has no record of inhouse or local certification
etc.
Is there a plan in place to identify, remove and replace unacceptable bolts?
6.5 1 not available,
Is a calibrated torque wrench being used to test bolts? Calibrated torque wrenches are used. 10-50Nm and
6.7 1
20-150F-Lbs
Are calibration records available for the torque wrench? Calibrated torque wrenches are used. 10-50Nm and
6.8 1
20-150F-Lbs
Are torque wrenches available?
6.9 1
Are Welders qualified to AWS D1.1 (or any other local standards) ?
6.11 1 No welder qualification available as per AWS D1.1
Are structural pieces clearly marked with the their unique identification
6.15 number (UNID)? 1 GE scope
If Turn of Nut is being used. Are bolts marked to ensure the right amount of
6.18 turn is performed for the size bolt being tightened? 1 Torque technique is used no turn of nut method.
Acc
Acc Unacc With N/A
Comment
Totals 4 8 0 5
This Section Audited (Y=Yes, N=No) Y To Audit Summary
Are dry mill thickness tests being made as job progresses? Reports available, however reference to
7.4 1
measuring device is not present.
Are Holiday detection records kept up to date?
7.5 1
Are previsions being made to control over spray or drift? GE-26909-YGTG-M-02-1007 is followed to
7.6 1
control over spray and drift
Is there a NACE or equivalent inspector monitoring the painting and liquid
7.7 coating processes per spec? 1 No qualified inspector available at site
Are paint and liquid coatings being applied within the humidity and
Paintshop is open area, it is open to
temperature requirements?
atmospheric conditions. Currenlty
7.8 1
temperature/humidity condition is not
severe however it will change soon.
Acc
Needs to
Acc With N/A
Improve
Comment
Totals 2 1 4 1
This Section Audited (Y=Yes, N=No) Y To Audit Summary
Are all NDE records current with the correct information referencing the M-3115 RFI reports randomly selected and
8.4 applicable code? 1
found they have relevant code reference.
Is NDE being performed to the code specified by the project specifications
NDT matrix (spreadsheet) was shown
and drawings?
8.5 1 however no traceability for this document
available. No signature no logo available.
Is the radiographic film and other NDE reports being review by GE’s and the
8.6 1 RT films are not reviewed by GE.
Contractor’s Quality Dept.?
Is the quality of the radiographic film free of scratches, smudges, light leaks,
8.7 1
static marks and processing abnormalities as not to interfere with
Are welds being visually inspected at fit up, during welding and after
8.8 completion for final acceptance? 1 final VT test performed with MFQ
Are calibration records available and traceable to tools and instruments that 2pcs 30 bar 2pcs 100 bar guages available.
8.9 1
require calibration There is no pressure test activitiy at site.
Are calibrations current for tools and instruments that require calibration? 6 pressure guages, 8 pressure relief valve
8.10 1 listed in the list. All have valid calibration
records
8.11 Are all checklists correct and accurate? 1 checklist MRFY-CKL-M-007 is used
8.12 Has the Hydro Procedure been reviewed and is it adequate for the test? 1 Hydrotest procedure is not available
8.13 Does the procedure include a safety review? 1 Hydrotest procedure is not available
each HT package has a drain plan which is
8.14 Is there a plan for draining water where applicable? 1 using plant drains.
8.15 Is Hydro tests being inspected and accepted by GE? 1 Each HT performed with RFI.
Do Hydro test forms reflect gage S/N, test pressures, holding times,
code part not filled, ambient temperature
8.16 applicable codes, ambient temperature and the system/section being testing? 1
not recorded.
Totals 11 9 1 2
This Section Audited (Y=Yes, N=No) Y To Audit Summary
Are Welder’s qualified to the process, which they are welding to?
9.3 1
Are weld records being documented in accordance with the Quality Manual quality manual not approved and it does not have
9.5 and the applicable code? 1
information about weld records
Are hold points being identified for inspection?
9.6 1
Are welds being identified with the weld number and welder’s ID in Weld log contains welder id however weldlog form is
9.7 accordance with the applicable code? 1
not registered,
Are welding inspectors qualified to perform the necessary inspections? there are 2 CSWIP 3.1 qualified welding inspectors
9.8 1
available at site.
9.9 Are weld material issue slips being used? 1 no slips used
9.10 Is unused weld material being returned and documented? 1 no control mechanism about unsued material
Is low hydrogen welding rods being stored in holding ovens at the proper
9.11 temperature? 1
Are welding rods holding ovens free of all other items except welding
9.13 material? 1
Are rod caddies being used to store low hydrogen rod in at welding points?
9.14 1
Is welding material being controlled to the extent that there are not any rods
9.16 1
or wires lying around the site?
Does the site have a copy of the Gas turbine welding instructions?
9.17 1 not delivered to Subcontractor
Have the Gas Turbine welding instructions been reviewed and is there an
9.18 understanding of the requirements? 1 not delivered to Subcontractor
Does the site have a copy of the Steam Turbine welding instructions?
9.19 1
Have the Steam Turbine welding instructions been reviewed and is there an
9.20 1
understanding of the requirements?
Is the Pipe material readily identified?
9.21 1
Are all piping spools being inspected for cleanliness? There is no record of cleanliness inspection.
9.22 1
Inspections not performed
Do all piping spools have end caps prior to being fit up?
9.23 1
Is Carbon Steel pipe welding and cleaning of welding being controlled as not
9.25 to allow carbon contamination of stainless steel? 1 there are different shops for CS and SS material
Is non-consumable paint and coatings being removed from the weld area
9.27 prior to welding? 1
Are “As Built” drawings available for any field run pipe?
9.28 1
Are welded pipe supports being inspected in accordance with the applicable RFI-M-3050 is selected as example. RFI raised for
9.30 code? 1
inspection of welded pipe support installation
Are anchor bolts being verified for location prior to equipment installation?
9.31 1 1
Is equipment being set on location per design CWM and WIS installation for block 4 not performed as
9.37 1
per drawings. Correction completed after issue raised
Are rotation records available and are they correct?
9.38 1
Are heating, soaking and relief temperatures and times within code
9.44 parameters for the metal being heat-treated? 1
Do the stress machines have calibration certifications and do they match the
9.45 S/N of the machine in use? 1
Acc
Needs to
Acc With N/A
Improve
Comment
Totals 23 8 3 16
This Section Audited (Y=Yes, N=No) Y To Audit Summary
Is work being performed in accordance with the Drawings and Specifications? site controls are in place 4/150 trucks rejected before
10.2 1
going further stages.
Are Proctors being used for soil used for fill? Troxler devices are calibrated however there is no
10.3 1 certificate in place. Troxler devices are not shown in
calibration log
Does the foundation bearing areas meet the correct density and/or RFI-C-375 & 382 selected as random example. Both
compaction? density measurement not meeting 95%. RFI-C-419
10.4 1 issued to cover 382 however no document trail
available for 375. which is GNAC foundation
compaction test for GTG2
Any contamination releases controlled and do not affect the soil? MS does not have any reference for contamination, At
10.5 1
site it is not followed.
Are pile chart with blow counts being filled out where applicable?
10.6 1
Are form inspections and concrete tests being performed on auger piles?
10.8 1
Is a qualified Testing Laboratory being used and are they on site during
10.9 pours? 1 Fugro-Suhaimi is 3rd party company for civil tests
Rebar Supplier and Fabricator qualified? Al-Fazan Building Material Company is rebar supplier
10.11 1 and it is approved 14th of May 2017 MFQ-26909-YGTG-
G-6-0199
Does the rebar meet the A/E specifications for the job?
Material develivery inspection performed for each
10.12 1 rebar delivery ticket. As an example MRFYNB-RH-GEN-
MAT-C-186 reviwed and found acceptable
Is rebar being installed in accordance with the A/E drawings (overlaps and Pre-pouring renar inspection is performed for installed
staggers)? rebars. As an example. RFI-C-3396 is performed rebar
10.13 1
inspection for exhaust frame blow foundation east and
west side at unit 7
Do the forms meet the A/E Specification?
10.14 1
Are forms being installed in accordance with the Civil, Electrical, Mechanical
10.15 and piping drawings? 1 pre-pouring inspection covers formwork activities.
Are truck tickets being review for the right mix design, dispatch time, water Delivery ticket 1438 selected as example, site
10.17 etc.? 1 inspection performed however there is no master list
to track values
Is control of storage of compression cylinders adequate?
10.18 1 Cylinders are stored at Fugro facilities.
Are imbeds measured for placement accuracy and tested for stability?
10.21 1 pre-pouring inspection covers imbeds
(Underground Piping) Are Welder’s qualified to the process, which they are
10.24 welding to? 1
(Underground Piping) Are welds being identified with the weld number and
10.28 welder’s ID in accordance with the applicable code? 1
(Underground Piping) Are all piping spools being inspected for cleanliness?
10.31 1
(Underground Piping) Do all piping spools have end caps prior to being fit up?
10.32 1
(Underground Piping) Are piping and finished welds being wrapped and
10.35 coated per the A/E specifications? 1
(Underground Piping) Are piping and finished welds being spark (Jeep) tested
10.36 and documented? 1
(Underground Piping) Is the backfill being installed with proper material, lifts
10.37 and compaction? 1
Acc
Needs to
Acc With N/A
Improve
Comment
Totals 11 6 1 20
This Section Audited (Y=Yes, N=No) Y To Audit Summary
Are all cables identified for interconnecting and the required testing?
11.2 1 at this stage of the project, there is no cable pulling.
Are right crucibles for cad welding being used properly during installation?
11.4 1 Furseweld Catalog is being followed. In the catalog it is described.
Are personnel performing cad weld qualified? 2 technicians performing cad welding, they are experienced however there
11.5 1
is no track of profecieny
Is there a procedure for inspection of grounding and cad welds to ensure
11.6 continuity? 1 no procedure available,
Are there provisions for assuring cable will not be damaged during the pulling Z-2-0050 Cable pulling procedure contains prov isions such as using rollers
11.7 process? 1
or lubricant in conduits.
Is there a procedure for pulling cable and does it include tensioner ? Z-2-0050 Cable pulling procedure available.tensioner not used in this
11.8 1
project.
Does the cable pull procedure include the tension radius requirements for the
11.9 size cable being polled? 1 Tensioners are not used.
Are trays, raceways and conduit being installed per the drawings and A/E
11.11 Specifications? 1
Is the right level of cable being installed in cable vaults and trenches?
11.16 1 no cable pulling
Acc
Needs to
Acc With N/A
Improve
Comment