Recommandations On Dosing, Handling and Mixing
Recommandations On Dosing, Handling and Mixing
Glued Loose
HANDLING - Gloves and eye protection must be used! - Gloves and eye protection must be used! - Gloves and eye protection must be used! - Gloves and eye protection must be used! - Gloves and eye protection must be used!
- Keep dry - Keep dry - Keep dry - Keep dry - Keep dry
Never add fibres as a first component Never add fibres as a first component - Speed: 10kg/min when using a conveyer belt Never add fibres as a first component Never add fibres as a first component
Plant mixer - Speed: 20 kg/min when using a automatic
dosing system
Introduce fibres with sand and Introduce fibres with sand and DO NOT: not possible to dose Introduce fibres with sand and Introduce fibres with sand and
aggregates aggregates OL fibres in the truckmixer aggregates aggregates
Never add fibres as a first component Never add fibres as a first component Never add fibres as a first component Never add fibres as a first component
Never fill drum completely with Never fill drum completely with Never fill drum completely with Never fill drum completely with
concrete in order to achieve even concrete in order to achieve even concrete in order to achieve even concrete in order to achieve even
fibre distribution fibre distribution fibre distribution fibre distribution
Truck mixer Add fibres continuously at a maximum Speed Dramix® Easy Dose fibres - Speed: add fibres continuously at a - Speed: add fibres continuously at a
of 40 kg/min (RB types) can be dosed continuously at maximum of 5 kg/min maximum of 5 kg/min
a maximum of 60 kg/min
If blower blast equipments are used (not
needed for Dramix® fibres) the suitability
should be tested on beforehand
MIXING
Mixing time depends on the efficiency Mixing time depends on the efficiency Mixing time depends on the efficiency - Mixing time depends on the efficiency - Mixing time depends on the efficiency
of the mixing equipment of the mixing equipment of the mixing equipment of the mixing equipment of the mixing equipment
DO: drum rotation speed > 12 rpm DO: drum rotation speed > 12 rpm DO NOT: not possible to dose DO: drum rotation speed > 12 rpm DO: drum rotation speed > 12 rpm
5 min. - Mixing time: after adding all fibres, mix - Mixing time: after adding all fibres, mix OL fibres in the truckmixer - Mixing time: after adding all fibres, mix - Mixing time: after adding all fibres, mix
1 minute/m3 concrete and not less than 5 min 1 minute/m3 concrete and not less than 5 min 1 minute/m3 concrete and not less than 5 min 1 minute/m3 concrete and not less than 5 min
PUMPING Hose diameter > 1,5 x fibre length Hose diameter > 1,5 x fibre length Special pump test program is required Hose diameter > 1,5 x fibre length Hose diameter > 1,5 x fibre length
For complicated pump lines or concrete For complicated pump lines or concrete For complicated pump lines or concrete For complicated pump lines or concrete
compositions, a trial is recommended prior compositions, a trial is recommended prior compositions, a trial is recommended prior compositions, a trial is recommended prior
to execution to execution to execution to execution
Bekaert is provided to support you for all questions regarding the dosing, mixing and placing of fibre concrete or any exception from above described recommendations. www.bekaert.com/building • [email protected]
Dramix® BOOSTER:
• Exact dosing of the Dramix® steel fibres
• Just-in-time deliveries
Dramix® VIBRO:
• Exact dosing of the Dramix® steel fibres
• Increased productivity
Bekaertstraat 2
BE-8550 Zwevegem
T+ 32 56 76 61 10
F +32 56 76 79 47
[email protected]
www.bekaert.com/building
All mentioned trademarks are registered trademarks owned by NV Bekaert SA.
© 2008 Bekaert