Open navigation menu
Close suggestions
Search
Search
en
Change Language
Upload
Sign in
Sign in
Download free for days
0 ratings
0% found this document useful (0 votes)
10 views
Checklist
Uploaded by
ALSIRAT CONTRACTING
Copyright
© © All Rights Reserved
Available Formats
Download as PDF or read online on Scribd
Download now
Download
Save Checklist For Later
Download
Save
Save Checklist For Later
0%
0% found this document useful, undefined
0%
, undefined
Embed
Share
Print
Report
0 ratings
0% found this document useful (0 votes)
10 views
Checklist
Uploaded by
ALSIRAT CONTRACTING
Copyright
© © All Rights Reserved
Available Formats
Download as PDF or read online on Scribd
Download now
Download
Save Checklist For Later
Carousel Previous
Carousel Next
Save
Save Checklist For Later
0%
0% found this document useful, undefined
0%
, undefined
Embed
Share
Print
Report
Download now
Download
You are on page 1
/ 3
Search
Fullscreen
: seteaechsnoeaa Ccovennment oF pues Pars, Customs and Free Zone Corporation Structural Works Inspection for FOOTINGS - ALL TYPES ‘Submission Ref: Inspection Date: Consultant Name ‘e-mail Accredited Engineer Name Mobile No. Contractor Name ‘e-mail Accredited Engineer Name Mobile No. ecto CED Permit/NOC Ref. No. Plot No. Een 1 _| Site lab certificate by Trakhees OC 2 _| Retaining walls not required of inspection by CED if shoring is present. Must be One side of formwork to be left open after installed the reinforcement in ‘order to enable inspection by CED. Building Permit ‘Affection Plan Demarcation Certificate and Bench Mark - Approval (from relevant Authority/8.U) Valid Contractor's License 4 5 6 7 | Valid Consultant's License 8 9 ‘Approved Drawings from CED. 10 | Shop Drawings approved by Consultant (based on A. of CED) 11 | Concrete Mix Design approved by Consultant 12 | Steel Reinforcement Test Certificates by 3rd Party & as per Code Requirements, 13 _| CED Inspection Records (Activities as inspected by CED Engineers) Confirmation of Bearing Capacity at actual Foundation Level by 3rd Party & verified as 4 per Design Regulations as_| Compaction Test Record for Sub grade Soil by 3d Party & verified as per Soil Report Requirements TTRK-CEDIC-CFO Rew 01 / Aug 2019) Page of3 lnfe@pcteae 0.80 2002,UAE. | Saal daa Shall 2001 ae (Co cee £00 990 Jun se ©0000 excic sats: | wwmscteae5 Seotstee a oes secechonetente Structural Works Inspection for FOOTINGS - ALL TYPES ‘Submission Ref: Inspection Date: Consultant Name ‘e-mail Accredited Engineer Name Mobile No. Contractor Name ‘e-mail Accredited Engineer Name Mobile No. ecto CED Permit/NOC Ref. No. Plot No. DOCUMENTATION (Contd) 0 Go ‘Soil Improvement Test Records if required, by 3rd Party & verified as per Soil Report Requirements 16 17 | NOC from DEWA- Power 18. | NOC from DEWA- Water 19. | NOC from Telecommunication provider in the area 20. | NOC from neighbor (whenever encroachment is made) 21. | NOC for Tower Crane Location (from relevant Authorty/ B.U) Pecos OD 1 | Observation of Setback distance (as per A.D of CED) 2 | Correct Foundation Level in relation to Bench Mark (as per A.D of CED) 3 | Correct Orientation of Building 4 | Dimensions of Footings as per A.D of CED 5 _| Dimensions of Strap Beams 6 | Location of Columns and Walls as per A.D and to be marked 7 | Dimensions of Columns and Walls 8 | Footings Reinforcement - Diameter and spacing (as per A.D) Gee Gitenae er nd TTRK-CEDIC-CFO Rew 01 / Aug 2019) Page 20f3 lnfe@pcteae 0.80 2002,UAE. | Saal daa Shall 2001 ae (Co cee £00 990 Jun se ©0000 excic sats: | wwmscteae: seteaechsnoeaa Ccovennment oF pues Pars, Customs and Free Zone Corporation Structural Works Inspection for FOOTINGS - ALL TYPES ‘Submission Ref: Inspection Date: Consultant Name ‘e-mail ‘Accredited Engineer Name. Mobile No. Contractor Name ‘e-mail Accredited Engineer Name Mobile No. CED Permit/NOC Ref. No. Plot No. PM ne 0 Go 9 | Additional Reinforcement provided (as Indicated on A.D) 10 | Punching Shear Reinforcement around Columns and Walls (as per AD) 11 | Strap Beams Reinforcement - Diameter and spacing (as per AD) 12. | Columns and Walls Starter Bars - Diameter and spacing (as per A.D) 13. | Detailing of all reinforcement (to be according to ACI, BS) as per CED Regulations 14 | Reinforcement Cover to be as per A.D and according to CodeRequirements 15_| Lap Length and location to be as per A.D and according to Code Requirements 16 | Length of dowels for Columns & Walls (as per A.D) 17 | Adequate Support for Concrete Formwork ‘Tower Crane Location and additional reinforcement as per A.D (applicable only when located within the structural element) Gee Gitenae er nd TTRK-CEDIC-CFO Rew 01 / Aug 2019) Page 3 0f3 lnfe@pcteae 0.80 2002,UAE. | Saal daa Shall 2001 ae (Co cee £00 990 Jun se ©0000 excic sats: | wwmscteae
You might also like
Hourglass Workout Program by Luisagiuliet 2
PDF
76% (21)
Hourglass Workout Program by Luisagiuliet 2
51 pages
12 Week Program: Summer Body Starts Now
PDF
87% (46)
12 Week Program: Summer Body Starts Now
70 pages
Read People Like A Book by Patrick King-Edited
PDF
57% (83)
Read People Like A Book by Patrick King-Edited
12 pages
Livingood, Blake - Livingood Daily Your 21-Day Guide To Experience Real Health
PDF
77% (13)
Livingood, Blake - Livingood Daily Your 21-Day Guide To Experience Real Health
260 pages
Cheat Code To The Universe
PDF
94% (79)
Cheat Code To The Universe
34 pages
Facial Gains Guide (001 081)
PDF
91% (45)
Facial Gains Guide (001 081)
81 pages
Curse of Strahd
PDF
95% (467)
Curse of Strahd
258 pages
The Psychiatric Interview - Daniel Carlat
PDF
91% (34)
The Psychiatric Interview - Daniel Carlat
473 pages
The Borax Conspiracy
PDF
91% (57)
The Borax Conspiracy
14 pages
The Secret Language of Attraction
PDF
86% (108)
The Secret Language of Attraction
278 pages
How To Develop and Write A Grant Proposal
PDF
83% (542)
How To Develop and Write A Grant Proposal
17 pages
Penis Enlargement Secret
PDF
60% (124)
Penis Enlargement Secret
12 pages
Workbook For The Body Keeps The Score
PDF
89% (53)
Workbook For The Body Keeps The Score
111 pages
Donald Trump & Jeffrey Epstein Rape Lawsuit and Affidavits
PDF
83% (1016)
Donald Trump & Jeffrey Epstein Rape Lawsuit and Affidavits
13 pages
KamaSutra Positions
PDF
78% (69)
KamaSutra Positions
55 pages
7 Hermetic Principles
PDF
93% (30)
7 Hermetic Principles
3 pages
27 Feedback Mechanisms Pogil Key
PDF
77% (13)
27 Feedback Mechanisms Pogil Key
6 pages
Frank Hammond - List of Demons
PDF
92% (92)
Frank Hammond - List of Demons
3 pages
Phone Codes
PDF
79% (28)
Phone Codes
5 pages
36 Questions That Lead To Love
PDF
91% (35)
36 Questions That Lead To Love
3 pages
How 2 Setup Trust
PDF
97% (307)
How 2 Setup Trust
3 pages
100 Questions To Ask Your Partner
PDF
78% (36)
100 Questions To Ask Your Partner
2 pages
The 36 Questions That Lead To Love - The New York Times
PDF
91% (35)
The 36 Questions That Lead To Love - The New York Times
3 pages
Satanic Calendar
PDF
25% (56)
Satanic Calendar
4 pages
The 36 Questions That Lead To Love - The New York Times
PDF
95% (21)
The 36 Questions That Lead To Love - The New York Times
3 pages
14 Easiest & Hardest Muscles To Build (Ranked With Solutions)
PDF
100% (8)
14 Easiest & Hardest Muscles To Build (Ranked With Solutions)
27 pages
Jeffrey Epstein39s Little Black Book Unredacted PDF
PDF
77% (13)
Jeffrey Epstein39s Little Black Book Unredacted PDF
95 pages
RAMS Tamplet
PDF
No ratings yet
RAMS Tamplet
11 pages
1001 Songs
PDF
70% (73)
1001 Songs
1,798 pages
The 4 Hour Workweek, Expanded and Updated by Timothy Ferriss - Excerpt
PDF
23% (954)
The 4 Hour Workweek, Expanded and Updated by Timothy Ferriss - Excerpt
38 pages
Zodiac Sign & Their Most Common Addictions
PDF
63% (30)
Zodiac Sign & Their Most Common Addictions
9 pages
HSE Risk Assesment - Excavation and Backfilling
PDF
100% (1)
HSE Risk Assesment - Excavation and Backfilling
5 pages
MSDS For CEMENT
PDF
No ratings yet
MSDS For CEMENT
3 pages
Tarpaulin Installation MS
PDF
100% (1)
Tarpaulin Installation MS
6 pages
MOS Trial Trench Work
PDF
No ratings yet
MOS Trial Trench Work
20 pages
C4M Mivan Formwork
PDF
No ratings yet
C4M Mivan Formwork
3 pages
Structural Inspection Checklists
PDF
100% (1)
Structural Inspection Checklists
57 pages
METHOD STATEMENT FOR SCAFFOLDING
PDF
No ratings yet
METHOD STATEMENT FOR SCAFFOLDING
10 pages
(MPH) Contractor Risk Assessment Method Statement
PDF
No ratings yet
(MPH) Contractor Risk Assessment Method Statement
8 pages
Scaffolding Safety
PDF
No ratings yet
Scaffolding Safety
4 pages
Cantilever Loading Platform Dismantling
PDF
No ratings yet
Cantilever Loading Platform Dismantling
30 pages
Formworks & Scaffoldings
PDF
No ratings yet
Formworks & Scaffoldings
56 pages
Sign Installation Method Statement Risk Assessment PDF
PDF
No ratings yet
Sign Installation Method Statement Risk Assessment PDF
21 pages
Methods Statement - For Construction of Electrical Room Works
PDF
No ratings yet
Methods Statement - For Construction of Electrical Room Works
22 pages
Safety Method Statement: U (tÜÜ - Á U (tÜÜ - Á U (tÜÜ - Á U (tÜÜ - Á
PDF
No ratings yet
Safety Method Statement: U (tÜÜ - Á U (tÜÜ - Á U (tÜÜ - Á U (tÜÜ - Á
12 pages
Risk Assesment Form For Scaffolding
PDF
No ratings yet
Risk Assesment Form For Scaffolding
1 page
Scaffolding Method of Statment
PDF
No ratings yet
Scaffolding Method of Statment
11 pages
Suspended Working Platform
PDF
No ratings yet
Suspended Working Platform
70 pages
Fall Protection Plan (Rev 00)
PDF
No ratings yet
Fall Protection Plan (Rev 00)
17 pages
Sample Fall Protection
PDF
No ratings yet
Sample Fall Protection
5 pages
M.S Internal Paint Final
PDF
No ratings yet
M.S Internal Paint Final
8 pages
MST for Earthworks
PDF
No ratings yet
MST for Earthworks
22 pages
TOWER CRANE MS New
PDF
100% (1)
TOWER CRANE MS New
4 pages
Methodology for Facade Cleaning
PDF
No ratings yet
Methodology for Facade Cleaning
4 pages
M S For Raft
PDF
No ratings yet
M S For Raft
10 pages
Pre-Pouring Inspection Checklist
PDF
No ratings yet
Pre-Pouring Inspection Checklist
2 pages
Risk Assessment For Shoring & Piling Operations - Aldridge Piling ...
PDF
No ratings yet
Risk Assessment For Shoring & Piling Operations - Aldridge Piling ...
11 pages
Back Filling Work Method Statment
PDF
100% (1)
Back Filling Work Method Statment
2 pages
Method Installation of Steel Portal Frame
PDF
No ratings yet
Method Installation of Steel Portal Frame
8 pages
MSRA - Demolition
PDF
No ratings yet
MSRA - Demolition
30 pages
Risk Assessment of Flag Poles
PDF
No ratings yet
Risk Assessment of Flag Poles
5 pages
L&T System Formwork - General
PDF
No ratings yet
L&T System Formwork - General
127 pages
MS On Site Clearing and Grubbing
PDF
No ratings yet
MS On Site Clearing and Grubbing
7 pages
Method of Statement (Flooring Tiles)
PDF
No ratings yet
Method of Statement (Flooring Tiles)
4 pages
Demolition Methodology
PDF
No ratings yet
Demolition Methodology
3 pages
Inspection Request Form For Beam Launching Work
PDF
No ratings yet
Inspection Request Form For Beam Launching Work
2 pages
M 503 2705 Demolishing Dismantling Steel Framed Structures in The Workplace
PDF
No ratings yet
M 503 2705 Demolishing Dismantling Steel Framed Structures in The Workplace
2 pages
Method Statement For Excavation01
PDF
100% (1)
Method Statement For Excavation01
12 pages
Roofing Activities
PDF
100% (1)
Roofing Activities
2 pages
Method Statement - TF CUPLOK and Birdcage To SG4 - April 2005 PDF
PDF
No ratings yet
Method Statement - TF CUPLOK and Birdcage To SG4 - April 2005 PDF
10 pages
03 Method of Statment - Work at Height
PDF
No ratings yet
03 Method of Statment - Work at Height
8 pages
Tempfacil-Electrical Work Method Statement (WMS)
PDF
No ratings yet
Tempfacil-Electrical Work Method Statement (WMS)
3 pages
02 Spec Guniting Works Rev20200610
PDF
No ratings yet
02 Spec Guniting Works Rev20200610
8 pages
Pulling and sagging of cables
PDF
No ratings yet
Pulling and sagging of cables
8 pages
Method of - Statements
PDF
No ratings yet
Method of - Statements
17 pages
1c. MS 03 Site Clearance Topsoil Strip DF
PDF
No ratings yet
1c. MS 03 Site Clearance Topsoil Strip DF
16 pages
Detour Shift
PDF
No ratings yet
Detour Shift
1 page
Blinding Concrete Works Contents Revised 19-04-16R
PDF
100% (1)
Blinding Concrete Works Contents Revised 19-04-16R
3 pages
(Lying Pipe) MP02-0200-14-MES-2D0005 - B2
PDF
No ratings yet
(Lying Pipe) MP02-0200-14-MES-2D0005 - B2
13 pages
0022-Method Statement For Steel Deck Installation
PDF
No ratings yet
0022-Method Statement For Steel Deck Installation
5 pages
Milbank Generic Method Statement
PDF
No ratings yet
Milbank Generic Method Statement
24 pages
RA For Laying of RC Pipeline For Storm Water
PDF
No ratings yet
RA For Laying of RC Pipeline For Storm Water
13 pages
MPL - 027 Permit To Work Form - 11.02.2022 Umingan Crushing Plant
PDF
100% (1)
MPL - 027 Permit To Work Form - 11.02.2022 Umingan Crushing Plant
1 page
Safety Plan For Demolition of Walls and Excavation For Foundation
PDF
No ratings yet
Safety Plan For Demolition of Walls and Excavation For Foundation
2 pages
Risk Assessment for Tower Crane Installation-Erection
PDF
No ratings yet
Risk Assessment for Tower Crane Installation-Erection
7 pages
MSRA For Trench Work
PDF
No ratings yet
MSRA For Trench Work
11 pages
Lift Plan - Method Statement - Risk Assessment - SafetyCulture
PDF
100% (1)
Lift Plan - Method Statement - Risk Assessment - SafetyCulture
21 pages
JSA Form - Demolition
PDF
No ratings yet
JSA Form - Demolition
5 pages
2010 10 Online
PDF
No ratings yet
2010 10 Online
72 pages
Solid Slab Inspection Checklists
PDF
No ratings yet
Solid Slab Inspection Checklists
2 pages