Dedicated Outdoor Air System (DOAS) Sizing Summary For VRF

This document provides a sizing summary for a VRF air conditioning system for a project in Dammam, Saudi Arabia. It sizes the system to meet the cooling and heating loads of 1 zone containing 10 spaces with a total floor area of 173.9 sqm. The peak cooling load is 53.3 kW occurring in August, and the peak heating load is 3 kW. An outdoor unit with a capacity of 53.3 kW for cooling and 3 kW for heating is recommended. The required outdoor air ventilation rate for the zone is calculated to be 186 L/s.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
57 views

Dedicated Outdoor Air System (DOAS) Sizing Summary For VRF

This document provides a sizing summary for a VRF air conditioning system for a project in Dammam, Saudi Arabia. It sizes the system to meet the cooling and heating loads of 1 zone containing 10 spaces with a total floor area of 173.9 sqm. The peak cooling load is 53.3 kW occurring in August, and the peak heating load is 3 kW. An outdoor unit with a capacity of 53.3 kW for cooling and 3 kW for heating is recommended. The required outdoor air ventilation rate for the zone is calculated to be 186 L/s.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 8

Dedicated Outdoor Air System (DOAS) Sizing Summary for VRF

Project Name: V1A 03/13/2024


Prepared by: ECC 09:57AM

Air System Information


Air System Name VRF Number of zones 1
Equipment Class TERM Floor Area 173.9 m²
Air System Type VRF Location Dammam, Saudi Arabia

Sizing Calculation Information


Calculation Months Jan to Dec Zone L/s Sizing Sum of space airflow rates
Sizing Data Calculated Space L/s Sizing Individual peak space loads

NOTE: No other data is applicable for a Terminal Units air system without a Dedicated Outdoor Air System (DOAS).

Hourly Analysis Program 5.11 Page 1 of 8


Zone Sizing Summary for VRF
Project Name: V1A 03/13/2024
Prepared by: ECC 09:57AM

Air System Information


Air System Name VRF Number of zones 1
Equipment Class TERM Floor Area 173.9 m²
Air System Type VRF Location Dammam, Saudi Arabia

Sizing Calculation Information


Calculation Months Jan to Dec Zone L/s Sizing Sum of space airflow rates
Sizing Data Calculated Space L/s Sizing Individual peak space loads

Terminal Unit Sizing Data - Cooling

Total Sens Coil Coil Water Time


Coil Coil Entering Leaving Flow of
Load Load DB / WB DB / WB @ 5.6 K Peak Coil Zone
Zone Name (kW) (kW) (°C) (°C) (L/s) Load L/(s·m²)
Zone 1 53.3 53.3 25.7 / 16.4 15.2 / 12.4 - Aug 1600 24.24

Terminal Unit Sizing Data - Heating, Fan, Ventilation

Heating Htg Coil


Heating Coil Water Fan OA Vent
Coil Ent/Lvg Flow Design Fan Fan Design
Load DB @11.1 K Airflow Motor Motor Airflow
Zone Name (kW) (°C) (L/s) (L/s) (BHP) (kW) (L/s)
Zone 1 3.0 21.0 / 21.6 - 4215 n/a 2.679 186

VRF Outdoor Unit Sizing Data

Cooling Heating
[kW] [kW]
Peak Coincident Indoor Unit Loads 53.3 3.0
Estimated Piping / Line Losses 0.0 0.0

Total Required ODU Capacity 53.3 3.0

Note: VRF piping / line losses are based on typical loss factors for this class of equipment. Actual line loss varies widely from one product to another.
Therefore, when selecting equipment it is critical to consult manufacturer's guidance to utilize actual line loss data.

Zone Peak Sensible Loads

Zone Zone Zone


Cooling Time of Heating Floor
Sensible Peak Sensible Load Area
Zone Name (kW) Cooling Load (kW) (m²)
Zone 1 47.6 Jul 1500 2.6 173.9

Hourly Analysis Program 5.11 Page 2 of 8


Zone Sizing Summary for VRF
Project Name: V1A 03/13/2024
Prepared by: ECC 09:57AM

Space Loads and Airflows

Time of
Cooling Peak Air Heating Floor
Zone Name / Sensible Sensible Flow Load Area Space
Space Name Mult. (kW) Load (L/s) (kW) (m²) L/(s·m²)
Zone 1
V1A-FF-01 - Master Bed 1 4.2 Aug 1500 366 0.3 19.6 18.65
V1A-FF-05 - Bedroom 03 1 3.7 Jul 1500 325 0.2 14.4 22.60
V1A-FF-06 - Family Room 1 5.4 Sep 1400 475 0.4 21.7 21.90
V1A-FF-08 - Bedroom 01 1 3.9 Aug 1500 343 0.2 16.7 20.52
V1A-FF-09 - Bedroom 02 1 3.5 Jul 1500 310 0.2 14.4 21.52
V1A-GF-02 - Kitchen 1 4.6 Jul 1500 405 0.2 15.1 26.80
V1A-GF-03 - Living 1 10.5 Jul 1500 919 0.5 30.5 30.13
V1A-GF-04 - Dining 1 3.9 Aug 1500 340 0.1 17.1 19.86
V1A-GF-05 - Majlis 1 4.5 Aug 1500 397 0.3 17.8 22.30
V1A-SF-01 - Maid Room 1 3.8 Jul 1500 336 0.3 6.6 50.85

Hourly Analysis Program 5.11 Page 3 of 8


Ventilation Sizing Summary for VRF
Project Name: V1A 03/13/2024
Prepared by: ECC 09:57AM

1. Summary
Ventilation Sizing Method Sum of Space OA Airflows

2. Space Ventilation Analysis

2.1 Zone: Zone 1


Floor Maximum Required Required Required Required Uncorrected
Area Maximum Supply Air Outdoor Air Outdoor Air Outdoor Air Outdoor Air Outdoor Air
Zone Name / Space Name Mult. (m²) Occupants (L/s) (L/s/person) (L/(s·m²)) (L/s) (% of supply) (L/s)
Zone 1
V1A-FF-01 - Master Bed 1 19.6 2.0 365.6 2.50 0.30 0.0 0.0 10.9
V1A-FF-05 - Bedroom 03 1 14.4 1.0 325.4 2.50 0.30 0.0 0.0 6.8
V1A-FF-06 - Family Room 1 21.7 7.0 475.3 2.50 0.30 0.0 0.0 24.0
V1A-FF-08 - Bedroom 01 1 16.7 1.0 342.7 2.50 0.30 0.0 0.0 7.5
V1A-FF-09 - Bedroom 02 1 14.4 1.0 309.8 2.50 0.30 0.0 0.0 6.8
V1A-GF-02 - Kitchen 1 15.1 3.0 404.7 3.80 0.60 0.0 0.0 20.5
V1A-GF-03 - Living 1 30.5 10.0 919.0 2.50 0.30 0.0 0.0 34.2
V1A-GF-04 - Dining 1 17.1 8.0 339.5 3.80 0.90 0.0 0.0 45.8
V1A-GF-05 - Majlis 1 17.8 8.0 397.0 2.50 0.30 0.0 0.0 25.3
V1A-SF-01 - Maid Room 1 6.6 1.0 335.6 2.50 0.30 0.0 0.0 4.5
Totals (incl. Space Multipliers) 4214.7 186.3

Hourly Analysis Program 5.11 Page 4 of 8


Air System Design Load Summary for VRF
Project Name: V1A 03/13/2024
Prepared by: ECC 09:57AM

DESIGN COOLING DESIGN HEATING


COOLING DATA AT Aug 1600 HEATING DATA AT DES HTG
COOLING OA DB / WB 43.5 °C / 21.6 °C HEATING OA DB / WB 7.2 °C / 3.2 °C
Sensible Latent Sensible Latent
ZONE LOADS Details (W) (W) Details (W) (W)
Window & Skylight Solar Loads 17 m² 2005 - 17 m² - -
Wall Transmission 179 m² 1708 - 179 m² 1189 -
Roof Transmission 7 m² 86 - 7 m² 40 -
Window Transmission 17 m² 854 - 17 m² 678 -
Skylight Transmission 0 m² 0 - 0 m² 0 -
Door Loads 18 m² 2807 - 18 m² 706 -
Floor Transmission 152 m² 2210 - 152 m² 0 -
Partitions 0 m² 0 - 0 m² 0 -
Ceiling 0 m² 0 - 0 m² 0 -
Overhead Lighting 942 W 942 - 0 0 -
Task Lighting 2555 W 2555 - 0 0 -
Electric Equipment 1249 W 1249 - 0 0 -
People 42 3042 2644 0 0 0
Infiltration - 28339 -2592 - 0 0
Miscellaneous - 1030 350 - 0 0
Safety Factor 0% / 0% 0 0 0% 0 0
>> Total Zone Loads - 46826 402 - 2613 0
Zone Conditioning - 46273 402 - 2520 0
Plenum Wall Load 0% 0 - 0 0 -
Plenum Roof Load 0% 0 - 0 0 -
Plenum Lighting Load 0% 0 - 0 0 -
Exhaust Fan Load 0 L/s 0 - 0 L/s 0 -
Ventilation Load 186 L/s 4299 -402 186 L/s 3114 2
Ventilation Fan Load 0 L/s 0 - 0 L/s 0 -
Space Fan Coil Fans - 2679 - - -2679 -
Duct Heat Gain / Loss 0% 0 - 0% 0 -
>> Total System Loads - 53251 0 - 2954 2
Terminal Unit Cooling - 53251 0 - 0 0
Terminal Unit Heating - 0 - - 2954 -
>> Total Conditioning - 53251 0 - 2954 0
Key: Positive values are clg loads Positive values are htg loads
Negative values are htg loads Negative values are clg loads

Hourly Analysis Program 5.11 Page 5 of 8


Hourly Air System Design Day Loads for VRF
Project Name: V1A 03/13/2024
Prepared by: ECC 09:57AM

Data for July

Total Cooling Total Heating

50
45
40
35
Load ( kW )

30
25
20
15
10
5
0
00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23
Hour of Day

Hourly Analysis Program 5.11 Page 6 of 8


Hourly Zone Design Day Loads for VRF
Project Name: V1A 03/13/2024
Prepared by: ECC 09:57AM

Zone: Zone 1
Data for July

Zone Sensible Zone Conditioning

45000

40000

35000

30000

25000
W

20000

15000

10000

5000

0
00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23
Hour of Day

Hourly Analysis Program 5.11 Page 7 of 8


System Psychrometrics for VRF
Project Name: V1A 03/13/2024
Prepared by: ECC 09:57AM

The psychrometric graph cannot be generated for this type of system.

Hourly Analysis Program 5.11 Page 8 of 8