ITP - Tyre Shop
ITP - Tyre Shop
QUALITY CONTROL
II SUB STRUCTURE
A Footing (Tyre Shop)
1 Soil Excavation EL. 65.827
Dim. 2500 x 2500 x 500
2 Soil Backfill Elevasi Top -0.500
3 Soil Disposal
EL. 65.827
Kepadatan 95% (Uji Sandcone)
4 Compacted Soil density 95% Elevasi Top -0.500
7 Footplate
D16 - 150 Tul. Bawah
a Reinforcement D13 - 100 Tul. Atas
Beton Deck 70mm
Page 1 of 4
QUALITY CONTROL
Plywood
b Formwork Dim. 1300 x 400 mm
Selimut Beton 70mm
8 Pedestal
M20 @ 14pcs
a Anchor Length 700mm type L
10D16
b Reinforcement D10-100
Beton Deck 40mm
Plywood
c Formwork Dim. 350 x 300 mm
Selimut Beton 40mm
Page 2 of 4
QUALITY CONTROL
Plywood
8 Formwork Dim. 18000 & 21000 x 300 mm
Selimut Beton 40mm
EL. 67.627
C Pump House
1 Soil excavation EL. 66.227
Dim. 3400 x 3400 x 100
2 Soil Backfill Elevasi Top -0.100
3 Soil Disposal
EL. 66.227
Kepadatan 95% (Uji Sandcone)
4 Compacted Soil density 95% Elevasi Top -0.100
Page 3 of 4
QUALITY CONTROL
Plywood
8 Formwork Dim. 2200 x 200 & 2190 x 200 mm
Selimut Beton 80mm
Page 4 of 4