Projected Y6 performance exceeds investor expectations with earnings per share of $1.39 versus $1.25 expected and a return on equity of 21.6% versus 17.5% expected. Other measures like net revenues, net profit, and ending cash also increased substantially from Y5. The company's credit rating improved to A- from B+ and image rating increased to 78 from 70. Projected unit assembly of AC cameras is 1,014,000 with a total production/assembly cost of $135,855 per unit. For UAV drones, projected unit assembly is 180,000 with a total production/assembly cost of $880.32 per unit.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
67 views3 pages
GLO BUS Decisions Reports 1
Projected Y6 performance exceeds investor expectations with earnings per share of $1.39 versus $1.25 expected and a return on equity of 21.6% versus 17.5% expected. Other measures like net revenues, net profit, and ending cash also increased substantially from Y5. The company's credit rating improved to A- from B+ and image rating increased to 78 from 70. Projected unit assembly of AC cameras is 1,014,000 with a total production/assembly cost of $135,855 per unit. For UAV drones, projected unit assembly is 180,000 with a total production/assembly cost of $880.32 per unit.
15 minutes flight time) Number of Photo Modes (video / 6 modes Number of Rotors 6 rotors still)
Product Camera $ per camera Rotor Performance /
Advanced Enhancements Housing Flight Controller Editing / Body Frame g10/FR4 Fiberglas Sharing $ per camera Construction Capabilities Obstacle Sensors 360° Enhanced Included $ per camera Accessories Camera Stabilization Advanced Device Extra Performance Features features Extra Performance 5 features Number of AC Camera Models models Features Number of UAV Drone models Product R&D Expenditures (Y5 2 $ 6 ($000s) Models was $20,000) Product R&D Expenditures (Y5 was $ 3000 ($000s) Cumulative R&D Expenditures (all $15,000) years) $ 51,000 ($000s) Cumulative R&D Expenditures (all years) $ 33,000 ($000s)
Maintenance of Plant and Allowance for Warranty Repairs 9,300 51.67
12,650 12.48 Equipment Maintenance of Plant and 9,685 53.81 Depreciation of Plant and Equipment 7,500 7.40 Equipment Depreciation of Plant and 5,000 27.78 Total Camera Equipment 135,855 133.98 Production/Assembly Cost Total Drone 158,457 880.32 Production/Assembly Cost Projected Unit Assembly Regular Overtime Total Projected Unit Assembly Regular Overtime Total AC Camera Unit Assembly (000s) 845.0 169.0 1,014.0 UAV Drone Unit Assembly (000s) 150.0 30.0 180.0