Procurement
Procurement
THE BASICS OF
PROCUREMENT
Activity Title
FS/PROJECT PROPOSAL
STAGE
PROJECT OPERATION
STAGE
PROJECT APPRAISAL
STAGE
PROJECT COMPLETION
STAGE
PROCUREMENT
2. Implementation Phase
Activity Title
Default mode of the RA 9184 is
UNDERSTANDING THE BASICS OF PROCUREMENTcompetitive bidding, however to
promote economy and efficiency.
Alternative Method is provided.
BACKGROUND
▪ The Procurement process follow rules and regulations of RA 9184
GAA FY 2021, Section 17
Use of Government Funds
▪ Taking off on LPMCs scope/functions under Memorandum Circular
• Shall be utilized
2019-188 (Organization or Reconstitution of Sub-regional Project
in accordance with the
Monitoring Committees (PMCs)) to monitor and appropriations authorized for the
evaluate programs
purpose and comply with the applicable
and projects.
laws such as -
Purchase of goods, infrastructure
▪ LPMC has no participation in the procurement process
projects in accordance with the
provision of RA 9184 & its IRR &
▪ GPPB
LPMC will be provided with POW, specs/ drawings asGuidelines
well as
PPMP, APP as guide for monitoring
OBJECTIVES
▪ To present the procurement process and milestones
Prohibition:
MEMBERS 5-7 Members (Permanent Position)
➢ HoPE or approving authority and
the officials who approves
Such as but not limited
procurement to….
transaction isChairperson*
1. Office of the Administrator
prohibited to be BAC member Vice-Chairperson LCE
Offices ➢ COAOffice
2. Budget Circular No. 2003-004
3. Legal Office the Chief Accountant and
prohibits
4. Engineering Office * 3RD Ranking permanent
personnel of accounting units
5. General Services Office Official with one year fixed
➢ DOF DO
6. End-user unit
042-2019 prohibits
termthe
Treasurer & Assistant as member
of BAC and TWG
UNDERSTANDING THE BASICS OF PROCUREMENT
PURPOSE
OBSERVERS TRANSPARENCY
1. COA Representative
2. Private Group Representative*
3. NGO/CSO Representative*
*ELIGIBILITY *FUNCTION
Did not post the ITB to • Post to PhilGEPS and extend the Posting to PhilGEPS is
bid submission/opening thru bid mandatory.
PhilGEPS on the scheduled
2 date and procurement process
bulletin within the required minimum It is Day 1 of the whole
calendar days from posting to bid procurement process.
already started. submission/opening.
Issuance should be at
Changes in the bid documents Need to issue a Bid Bulletin
3 least 7 CD before bid
submission/ opening
UNDERSTANDING THE BASICS OF PROCUREMENT
Post-qualification
Post-qualification process • Request for extension to HoPE, process should be
4 exceeds 12 CDs but should not exceed 45 CDs completed within 12 CDs
for Goods and Infrastructure. from determination of
LCB.
• Inform BAC/HoPE
• Section 41 may be
Bidding with unresolved RROW • May commence but no award
7 of contract shall be made until
applied.
• Section 17.6
RROW has been resolved.
Total: 10,909
3817
Gen. Building & Eng'g
Total: 8,455
Total Construction Total Value Average Value
2267
173,193 P476B P2.75M
1608
1392
1221
18 399 187
AAAA (1B) AAA (180M) AA (90M) A (30M) B (10M) C (6M) D (2M) TRADE/E
(100K)
THANK YOU