Name of Project:-
Name of Client:-
Name of Consultant:-
Dia.
Lap Total
of bent Weight Total weight
Spac Clear Length (m) length No. length Remarks
Desg. No Shape of bar bar length (kg/m) (kg)
ing cover (m) (m)
(mm
) a b c d e
Isolated Footing
F1
160 160
Main bar 16 150 75 2450 160 160 64 18 2.71 1.58 76.9707
2450 150mmc/c spacing
main and distr. Bar
160 160
Dist. Bar 16 150 75 2450 160 160 64 18 2.71 1.58 76.9707
2450
Total no. of foundation 16 Sub. Total 2463.06 kg
F2
160 160
Main bar 16 150 75 2000 160 160 64 15 2.26 1.58 53.4756
2000
150mmc/c spacing
main and distr. Bar
160 160
Dist. Bar 16 150 75 2000 160 160 64 15 2.26 1.58 53.4756
2000
160 160
Main bar 16 150 75 2850 160 160 64 20 3.11 1.58 98.1649
2850 150mmc/c spacing
main and distr. Bar
160 160
Dist. Bar 16 150 75 2850 160 160 64 20 3.11 1.58 98.1649
2850
Total no. of foundation 16 Sub. Total 3141.28 kg
F4
120 120
Main bar 12 150 75 2350 120 120 96 27 2.49 0.89 119.7120
150mmc/c spacing
2350
main and distr. Bar
main and distr. Bar
in 2 layers
120 120
Dist. Bar 12 150 75 3850 120 120 96 17 3.99 0.89 120.7076
3850
400
352 352 chair at 1m x 1m in
Chair 10 150 75 400 352 352 300 300 80 10 1.62 0.62 10.0247
300 300 spacing
Corner
25 40 2363 1396 160 9140 100 4188 4 17.15 3.86 264.6142
bar 11503
160
1396
other
than 11503 20 40 2363 1117 160 9140 80 3351 8 16.05 2.47 317.0568
edge 160
1117
Stirrups 10 100 30 1910 1310 1310 240 141 4.29 0.62 373.3889
TB Tie Beam
At least 10 splicing
required in entire
16 30 59271 200 200 64 8930 6 68.54 1.58 649.832 length
59271
Grid A-
A, B-B, 16 40 29636 2 29.64 1.58 93.663
C-C, D- 29635.5
D
340 10 125 240 340 240 340 150 80 476 1.23 0.62 361.407
240
Total no. of same length 4 Sub. Total 4419.61 kg
At least 3 splicing
required in entire
12480 16 30 12480 200 200 64 2679 6 15.50 1.58 146.916 length
340
10 125 240 340 240 340 150 80 101 1.23 0.62 76.685
240
Grid A-
A, B-B, 16 40 29636 2 29.64 1.58 93.663
C-C, D- 29635.5
D
340
10 125 240 340 240 340 150 80 476 1.23 0.62 361.407
240
Total no. of same length 4 Sub. Total 4419.61 kg
At least 3 splicing
required in entire
12480 16 30 12480 200 200 64 2679 6 15.50 1.58 146.916 length
Grid 1-
16 40 6240 2 6.24 1.58 19.721
1, ..,12- 6240
12
340 10 240 340 240 340 150 80 101 1.23 0.62 76.685
125
240
Total no. of same length 12 Sub. Total 2919.87 kg
MB Main Beam at First and Second Floor
At least 10 splicing
required in entire
59271 16 30 59271 225 225 64 8930 7 68.59 1.58 758.691 length
Grid A-
A, B-B, 16 40 29636 3 29.64 1.58 140.494
29635.5
C-C, D-
D
100/
390 10 240 390 240 390 150 80 556 1.33 0.62 456.469
125
240
Total no. beam of same length in no of floor 2 floor 4 Sub. Total 10845.23 kg
At least 3 splicing
required in span
16 30 12480 225 225 64 2679 7 15.55 1.58 171.955
12480 length
100/
390 10 240 390 240 390 150 80 119 1.33 0.62 97.698
125
240
Total no. beam of same length in no of floor 2 floor 12 Sub. Total 7181.62 kg
SB Secondary Beam at First and Second Floor
At least 4 splicing
required in total
12480 16 30 12480 175 175 64 3572 4 16.34 1.58 103.272 length
290
All in a 100/
8 170 290 170 290 150 64 113 1.01 0.40 44.910
floor 150
170
Total no. beam of same length in no of floor 3 floor 11 Sub. Total 5239.57 kg
MB Main beam at third floor
possible 10 splicing
required in total
59271 16 30 59271 225 225 64 8930 6 68.59 1.58 650.306
length
100/
390 10 170 290 170 290 150 80 119 0.99 0.62 72.722
125
240
Total no. of same length 12 Sub. Total 2748.29 kg
Total steel in beam = 41859.12 kg
SL Slab reinforcement ofeach floor
cutpiece over
8 150 25 2200 75 75 0 0 16 1185 2.33 0.40 1092.658 secondary beam
2200