Project Handoff Checklist
Project Handoff Checklist
Purpose
This document summarizes the handoff requirements for project acceptance.
Exceptions
From time to time, situations will arise where it is not feasible for a product-related project to fully comply
with the SDLC or to meet all the maintenance handover prerequisites. In these cases, pre-approval for
an exception must be sought and accepted. All exceptions must be granted in advance of the project
being finalized, i.e. prior to a proposal, CR, SOW, etc. being presented to an existing or potential client.
All exception requests must be made to the manager of product development. They must, however,
ultimately be approved by the full management team.
Acceptance
Acceptance of the above deliverables is at the discretion of the product manager. Irresolvable disputes
between a project and the product manager may be escalated to the management team (through the
manager of product development) for resolution.
HANDOFF DELIVERABLES
ALIGNMENT TO Project to have requirements Product Approved Please do not hesitate to get
VISION documented in a repository and Requirements guidance from the product
adhere to the product standards team as you proceed with
and future vision. The provided list documenting your
of requirements must be approved requirements.
by a member of the product team
to assure it aligns with both
functional and technical roadmap.
REQUIREMENTS Project to have the project Peer-reviewed The product team may
QUALITY requirements reviewed by a requirements choose to designate a
resource (designated by the resource outside the product
product team) to assure the team.
requirements meet the complete
business needs.
ADVANCE RELEASE Project must supply marketing Word document ARN are published to clients
NOTES material for advance release notes including illustrations, after requirements cut-offs
(ARN). where applicable
TESTING RESULTS Provide the project testing results Reference to results This includes a list of
by testing by cycles (pass, fail, outstanding defects
deferred) that have been added
to the ticketing system
TEST ASSET Provide complete list of product Asset list and SVN Those assets need to
assets that were developed to location be usable in date build
assure proper testing